Surface Water Drainage Latest policy and practice in respect of surface water drainage and delivery of competitive solutions August 2013 Claire Cornmell.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Leachate Collection Systems. Class Objectives  To discuss landfill water balance  To present liner and leachate collection system (LCS) design information.
Urban Low Impact Development English + Associates Owner Architect Construction EcoServices Storm-water Tank Contractor General Contractor T&T Construction.
Permeable Paving. Low Impact Development (LID)  Low impact development (LID) is an approach to managing stormwater runoff to protect water quality.
Permeable Pavements Shingle Creek Watershed Management Commission May 31, 2011.
CITY OF HOUSTON FLOODING & DRAINAGE COMMITTEE PUBLIC WORKS AND ENGINEERING May 18, 2010.
Weetwood Surface Water Training
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Cascade Charter Township
Carnell. IEMA, Ireland Regional Event Are SUDS the Answer for Drainage? Dublin, 12th Dec 2007 “Filter Drains as a SuDS System” presented by Andrew Todd,
Keith Dorn Jesse Mefford Hunter Shealy ceramics.org.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Runoff Processes Daene C. McKinney
Soil Conservation Service Runoff Equation
Experience with SuDS in Dublin December 2007 Padraig Doyle Senior Project Manager Mott MacDonald Pettit IEMA Conference Are SuDS the answer for drainage?
Low Impact Development Best Management Practices
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
River Hydrographs Why do we use hydrographs?
Construction And Analysis Of Hydrographs. Hydrograph Record of River Discharge over a period of time River Discharge = cross sectional area rivers mean.
Analysis of Hydrographs
Construction Analysis Hydrographs
Stormwater Outlets Effectiveness of the Options. Stormwater Outlets Several options are available, such as the infiltration basins under the parking lots.
1 Groundwater Pollution Containment of Pollution.
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Sanitary Engineering Lecture 16
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
UNIFORM FLOW AND DESIGN OF CHANNELS
FLOOD HYDROGRAPHS FOR GCSE GEOGRAPHY.
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
Design of Infiltration Practices
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Pavement Analysis and Design
Construction And Analysis Of Hydrographs Hours from start of rain storm Discharge (m 3 /s) Base flow Through flow Overland.
Construction And Analysis of Hydrographs ©Microsoft Word clipart.
Urban Storm Drain Design: Rainfall-Runoff relations.
Stormwater Management: TCNJ Townhouses South
Managing flood risk Sustainable Drainage Systems Graham Brown, Flood and Water Manager Thursday 20th August 2015 Swaffham Town Council.
SuDS Approval Bodies. Floods and Water Management Act 2010 The Flood and Water Management Act 2010 received royal assent in April 2010, and it implements.
Construction And Analysis of Hydrographs ©Microsoft Word clipart Ballakermeen High School.
Environmental Toolbox. Technical Module Introduction.
SESSION 4 Drainage Design Considerations. Objectives  Identify types of subsurface drainage  Determine need for subsurface drainage  Recognize importance.
STORMWATER MANAGEMENT
1 HYDROSPHERE1 INTRODUCTION This unit has three components, The Hydrological cycle and its features. Working with hydrographs and Studying rivers.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
BEST PRACTISE Use of permeable paving As part of a new Railway Station in Bromsgrove a new car park was being installed. This permeable solution had to.
WATER QUALITY IMPROVEMENTS ALONG WALLER CREEK BY: MOLLY COFFMAN, MONA LOTFI, SANDRA NADIRA & JEFF NAGY.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Rainfall and Runoff Reading: Haested Section 2.4 Computing Hydrographs.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
A RIVER SYSTEM ACTS LIKE A SYSTEM OF DOWNPIPES AND GUTTERING ON A HOUSE - IT ALLOWS THE MOVEMENT OF RAINWATER INTO THE SEA.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
LIMITING IMPERVIOUS SURFACE COVERAGE USING POROUS TECHNOLOGIES
Flood Hydrographs How do we know if a river will flood?
Analysis of Hydrographs
HYDROSPHERE 2.
Construction Analysis Hydrographs
Always Advancing Pervious
The issue: A Damming report – why are some strategies for flood management more sustainable than others?
Analysis of Hydrographs
Permeable Paving.
Hydrology CIVL341.
Weekly lesson objectives
Analysis of Hydrographs
Analysis of Hydrographs
Hydrology CIVL341 Introduction
Reducing Stormwater with Trees and Native Plants
Chapter Four RUNOFF When a storm occurs, a portion of rainfall infiltrates into the ground and some portion may evaporate. The rest flows as a thin sheet.
Presentation transcript:

Surface Water Drainage Latest policy and practice in respect of surface water drainage and delivery of competitive solutions August 2013 Claire Cornmell

2 Aim: To know more than we need to know

3 Some topics for discussion Flood and Water Management Act Draft National Standards Permeable Paving Detention Basins

Slide 4 Exceptions to the requirement for approval: - internal drainage boards - highway authority roads - a railway by Network Rail - does not apply to construction work (a) unless the construction work requires planning permission; or (b) if the construction work does not require planning permission, unless it involves the construction of a building or other structure covering an area of land of 100 square metres or more Flood and Water Management Act

Slide 5 Draft National Standards The Local Planning Authority may set more stringent local requirements. The SAB is responsible for adopting and maintaining new SuDS that serve more than one property and have been constructed as approved and function as designed. I. Principles II. Standards with design, construction and maintenance requirements for SuDS

Slide 6 Draft National Standards Part I – Principles a.Managed at source b.Managed on the surface c.Public space is used and integrated with the drainage system d.Design is cost-effective to operate and maintain over its design life e.Account for climate change and changes in impermeable area over the design life of the development Affordability – compared to conventional system Functionality – 8 weeks following inspections

Slide 7 Draft National Standards Part II – Section A – Runoff Destination 1. Ground - unless the rate of runoff is greater than the rate of infiltration, in which case as much of the water as reasonably practicable must be discharged by infiltration - unless ground instability, mobilising contaminants, water quality (SPZ1, BAP etc), groundwater flooding, leakage of groundwater to combined sewer 2. Surface water body – unless not reasonably practicable to convey, pumping required or unacceptable risk of flooding 3. Surface water sewer or local highway drain 4. Combined Sewer

8 Draft National Standards Attenuation Storage Interception Losses Long Term Storage Approach 1 Approach 2 2 l/s/ha Q1 GF Q100 GF Q1 GF or 2 l/s/ha Qbar GF or 2 l/s/ha Part II – Section B – Peak Runoff Rate and Volume

Slide 9 Draft National Standards Previously developed land a)An approach as close to Approach 1 as is reasonably practicable b) The flow rate discharged from the site must not exceed that prior to the proposed development for: - the 1 in 1 year event; and - the 1 in 100 year event c) The volume of runoff may only exceed that prior to the proposed development where the peak flow rate is restricted to 2 l/s/ha.

Slide 10 Long Term Storage Decide whether unpaved areas contribute or not Formula assumes 80% run-off from paved areas, but can adjust to 100% for conservative approach. Uses 100 year 6 hour rainfall event Vol = RD.A.10 [ ( α 0.8) + 1- (β.SPR) – SPR ] Where pervious areas are landscaped so they do not enter the network: Vol = RD.A.10 [ 0.8 – SPR ] Where all pervious areas are assumed to continue to drain to the network: Vol = RD.A.10 [ 0.8 – SPR ] 100 PIMP 100 PIMP 100 PIMP 100 PIMP 100 PIMP

Slide 11 Draft National Standards Part II – Section C – Water Quality

12 CBPP (Concrete Block Permeable Paving) Clay pavers Permeable Macadam Permeable Resin-bound aggregate Gravel Grass paving Permeable/ No-fines concrete Self-binding golden gravel Permeable Paving

13 The sub-grade layer of a pavement is, essentially, the underlying ground. Geo-textiles are permeable sheets, usually non-biodegradable. Geo-membranes are impermeable and usually non- woven, i.e. a film or solid sheet. The sub-base layer is the main load- bearing layer. The interlock between adjacent particles of the sub-base material works by distributing a point load over a larger area to the sub- grade below. Permeable Paving

14 Laying course: 3-6mm grit (2–6.5mm) Sub-base: Type 4/20 (4mm minimum and 20mm maximum particle size) coarse graded aggregate (and/or hydraulically bound CGA in more heavily trafficked areas). Typically mm deep.

15 Permeable Paving Service Corridors Construction A bitumen macadam may be installed with holes punched through on a 750mm orthogonal grid. Sloping Sites Check dams Terracing Geocellular at low end Increase sub-base thickness

16 Permeable Paving Pollutant Removal Removes 60 to 95% of total suspended solids (i.e. silt) and 70% to 90% of hydrocarbons. Heavy metals remain within structure. Interception Storage Interpave – Jan 2010 Edition 6 Maintenance

17 Resources: Interpave: Permeable Paving

18 Side slopes Depth Invert level of Outlet Structure Freeboard / Design Exceedance Detention Basins