ICE-T Payload & Performance. Seat Hudson CCN 1 & 2 CVI Prather AMS WCL DMT RAF Chem WCR WCL Seat SID-2 3V-CPI DMT Shuttle RAF Aerosol Seat Hudson 3 Seat.

Slides:



Advertisements
Similar presentations
Ryan Spackman (STC/ESRL) and Allen White (ESRL) CalWater 2015 Implementation – Measurements and Payload on the NOAA WP-3D.
Advertisements

FP-2 T-44 Ops Limits Overview System Limitations Propeller Limitations Starting Limitations Engine Limitations Airspeed Limitations Miscellaneous Limitations.
AMS Performance at DC3-Test Some preliminary results Pedro Campuzano Jost, Douglas Day, Michael Lechner, Jose Luis Jimenez.
NETCARE – POLAR Two aircraft campaigns – summer 2014, spring 2015 (spring 2016 in proposal) Close collaboration with Alfred Wegener Institute (Andreas.
AEROSONDE UAV Propulsion system
AE 10 Airplane Design. Preliminary Aircraft Design Process 1. Mission Specification 2. Configuration Design 3. Weight Sizing 4. Performance Sizing 5.
Page 1© Crown copyright The Facility for Airborne Atmospheric Measurements (FAAM) BAe-146 Steve Abel First VOCALS Regional Experiment (REx) Preparatory.
General: Very likely both aircraft are to be based at Arica. The UK recce is early April, both Arica and Iquique will be visited. Total of 120 flight hours.
Gravity Waves – #1 The NSF/NCAR G-V Research Aircraft: A New Observing Platform for Environmental Research.
© Crown copyright 2007 CAVIAR flight plans Stuart Newman, Met Office, Exeter, UK.
Flight 1 Date: 2 nd November 2004 Time: 11:45-14:30 GMT Flight Duration 165 minutes Data Collected 21.8 Mb Recording Rate: 10 Hz* Airspeed: 80 m s -1 Deployment:
C-130 Flight Plan Refinement Cross-section –lose MASTER? return leg at 3 km? –length of outbound legs? number of levels? POC-drift/lagrangian –fewer levels.
NCAR Research Aviation Facility CSU visit 11-April-2007 Dave Rogers -
Robert Wood, University of Washington many contributors VOCALS-REx Facility Status – NSF C-130.
SCOUT-O3 BALLOON/SONDES CAMPAIGN NIAMEY 26 JULY- 26 AUGUST 2006 J. P. Pommereau, A. Garnier and SCOUT-O3 team Objectives: Convective transport across tropopause.
Atmosphere Sciences Instrumentation Lab Organized by David Delene - November 20, 2008 Overview of Instruments – 3:00 Clifford Hall 470 Lab Demonstrations.
Photo courtesy Carly Calvin, NCAR NSF C-130 Platform Report Robert Wood (a) 20 o S Cross-Sections [4 full missions+5 partial missions] - to characterize.
GLOBE Protocols. Steps: 1. Look in ALL directions of the sky for any clouds. *avoid sun* 2. Identify types of clouds using GLOBE cloud chart and Observing.
Annual Interagency Weather Research Review and Coordination Meeting 30 November – 2 December 2010 Boulder, CO Julie Haggerty, Jennifer Black, Gary Cunning,
CalWater2 Workshop NOAA P-3 and G-IV Jim McFadden, Jack Parrish and LCDR Justin Kibbey NOAA Aircraft Operations Center 1.
NOAA Airborne Platforms n Mission Related – All NOAA airborne platforms perform some type of dedicated task defined by NOAAs mission n Not for General.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
BAE 146 Aircraft RICO Schedule RICO Participating Scientists RICO Instrumentation Contact: Alan Blyth
Page 1© Crown copyright ICEPIC Sortie Brief P:\OBR\Exeter\2006 Spring Sortie Briefs\ICEPIC sortie brief.doc Steve Abel: 20 th April 2006.
VOCALS Debrief. VOCALS Aircraft Operations NSF/NCAR C hrs DoE Battelle G-170 hrs FAAM BAe hrs NERC Dornier50 hrs CIRPAS Twin Otter 100 hrs.
BQM-167A Advanced UAV System Architecture
NCAR Aviation: Past Queen Airs (2) ’s DeHavilland Buffalo 1960’s.
A Historical Overview. T-28 Instrumentation: Position/Attitude/Velocity InitialFinal Absolute PositionVOR/DMEGPS Storm-relativeTracking radarTelemetered.
Flight Operations Panel Madrid May 2002 Rob Root Flight Operations Engineering B AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP.
Observations of Early Ice Formation during the ICE in Clouds Experiment: ICE-T Andrew Heymsfield, NCAR, Boulder CO Paul Field, UK Met Office, Exeter, UK.
ICE-T Project Schedule 1 April 2011 – NSF Decision Deadline* 1 April 2011 – Documentation Due at RAF (rack layouts, power, data) 1 May 2011 – Start of.
Tim Suttles, EOS Senior Science Advisor November 17,1999 NASA EOS & SAFARI 2000 EOS/SAFARI 2000 Airborne Campaign Brief: MODLAND Validation Readiness Review.
Atmospheric Technology Division Rain In Cumulus over the Ocean Jorgen Jensen, Jeff Stith, Teresa Campos, Mary Barth, Dave Rogers NCAR science to complement.
Flight schedule and staff limitations Hardpoint allocation and cabin layout Time synchronization Flight issues – expectation around convection Sensor groups.
Antarctic Clouds Tom Lachlan-Cope John King, Amélie Kirchgaessner.
GLOBE PROTOCOLS By: Angela Gonyer, Noah Hughes, Tyy Williams, Eli Lopez, and Ariana Viray.
VOCALS NSF C-130 Data Assessment Report. Resources Project Documentation: (RAF – Field Projects) Project Documentation:
What aircraft and instruments might I use for my research and do I find out about it/them? Jeff Stith Photo by Grant Gray, EOL.
Systems Fire Protection Working Group DTA - Grenoble, France June 21-22, 2003 Preliminary Results of FAA Fuel Tank Inerting Flight Testing on the NASA.
John M. Hubbe DOE ASP G-1 DOE has two climate-motivated programs John M. Hubbe
Jeff Stith, Andrew Gettelman NCAR is sponsored by the National Science Foundation Southern Ocean Studies: NCAR Measurement capabilities and integrating.
King Air Deployment in RICO Larry Oolman University of Wyoming.
March 13, 2006 slide 1 HIAPER Pod Development Group Discussion topics: brief review of where we are: pod group, large pods, NCAR pod, pylons, PMS canisters.
C-130 Payload Issues Proposed instruments What can be sampled where (below/above cloud)
OPTIONAL EQUIPMENT OBJECTIVE Know the operating procedures and limitations for selected item of optional equipment installed on the aircraft.
PALMS Single particle composition measurements for ATom Karl Froyd 1,2 and Dan Murphy 1 1. NOAA Earth Systems Research Laboratory 2. CIRES, University.
1 SIERRA Aircraft and Payload Status. Science Instrumentation Evaluation Remote Research Aircraft (SIERRA) SIERRA complements other UAVs in the NASA science.
Initial Pilot Ground School
HIAPER in PACDEX (Apr-May 2007). START08 RAF wing pod instruments.
Aircraft Configuration Update, October 2009 Steve Devereau 22 nd June 2009.
University of Hawai`i, Hawai`i Group for Environments Aerosol Research School of Ocean and Earth Science and Technology A. Clarke, S. Howell, C. M c Naughton,
Aircraft Design.
BORTAS Instrument Configuration – v2
SAMBBA Instrument Configuration – v3
Clare Lee & Anthony Baran
FP-2 T-44 Ops Limits 5/6/15.
Aerosol observations at Cardington
GAP Measurements and Instrumentation
Wyoming King Air in RICO
RICO Schedule RICO Participating Scientists RICO Instrumentation
ICE-T Project Schedule
START-08 / pre-HIPPO Flight hour allocation:
Mission Profile Specifications Assignment III
NSF C-130 Platform Report MISSIONS INSTRUMENTS Robert Wood
DOE G-1 Research Aircraft Facility Instrument Summary
Droplet Nuclei Measurements in VOCALS Intro and Preliminary Results
Science and Planning Workshop: START08/preHIPPO
Measuring microphysical, chemical and optical properties of aerosols aboard the NCAR/NSF C-130 during VOCALS Studying size-resolved aerosol cloud interactions.
RICO Schedule RICO Participating Scientists RICO Instrumentation
Presentation transcript:

ICE-T Payload & Performance

Seat Hudson CCN 1 & 2 CVI Prather AMS WCL DMT RAF Chem WCR WCL Seat SID-2 3V-CPI DMT Shuttle RAF Aerosol Seat Hudson 3 Seat ADS Seat C-130 Floor Plan FOR ICE-T 3/17/2011 SCAI Blower DMT Seat Anderson Toohey Clarkson RAF Chem P CVI Fast UV Wyo Heated Inlet RSTTCCN Clarkson CN External Inlets or structures RAF-chem GNI WCL CFDS IN WCR LAV ASU AEROS Displays: RAF / USER Cylinders: Power Distribution:

Inlets / Apertures CVI – L1 / max 4 –Anderson (2) –Prather (1) –DeMott (1) –DMT (1) Wyoming Heated – R2 –Demott (1) –DMT (2) –Prather (1) GNI – R1 ASU - L2 aft facing gooseneck –Streaker –Impactor UV Hygrometer – L3 DRI CCN – Belly1: aft facing goose neck (1) RAF CN – BellyL: SMAI1 RAF Chemistry – BellyL: aft facing goose neck (2) Clarkson – BellyR: SMAI2; Clarkson special; NASA

ICE-T C-130 Payload Cabin & Pod Instrumentation NCAR-suppliedUniversity of Wyoming-suppliedUser-supplied / Data Channels CVI / PREDICT channelsWCR – w/CMIGITSHudson: DRI CCN1-2 / none Fast O3 / PLOWS channelsWCL-IHudson: DRI Cal / none CO & CO2 / WAMO channelsWCL-IIDeMott: CFDC/ 1 serial string - 7 variables Manual GNI / 1 analogAerosol Science / approvedPrather: TOF-AMS / none UV Hygometer / 3 analog Clarkson Aerosol / 15 analog; 2 cnts; net serial NCAR CN Kok: DMT CCN-200 / pending / none Remote surface & sky tempsWyoming Heated Inlet / 5 analogKok: DMT Polarized Aeosol Particle Spectrom / pp Digital Video / fwd & dwn Kok: DMT SP-2 / pending / none King Probe & RICE OPHIR - in cloud temp / RWP Anderson: ASU Filter Packs / 2 analog TDL Hygrometer / RWP Toohey: Isotopic Water Analyzer / pending /none Wing Store Instrumentation - 9 maximum* NCAR-supplied (7)Options (for 1 open slot): LPOUser-supplied (1) / status / Data Channels RPO: 2D-P - w/modsWind Gust Pod / needs GPS feedLPI: DMT CPSD / pending / serial RPI: 3V-CPIHOLODEC-2 / cable conflict w CPSD LWI: CDP – w/modsSID-3H / cable conflict w CPSD LPC: 2D-C-25 / NCAR tipsSPP-300 RWI: SID-2HPVM-100 RWO: SPP-200 LWO: SPP-100 / no shroud

C-130 Performance / ICE-T Research fuel load for 6 hrs (150,000 GW) Fuel Burn: 5000 lbs / hr Service Ceiling: 20 – 25 Kft with burn-off Std Turn Rate: 3 deg / s (360 deg in 2 min) Research Airspeed: 200 KIAS (~110 M/S) Rate of Climb: –SFC to 10 Kft: 1800 – 1500 FPM –10 Kft to 15 Kft: 800 – 600 FPM –15 Kft to Ceiling: 500 – 300 FPM

C-130 Flight Operations Max Endurance 9 hours Range: 1800 nmi Descent Rate for good winds – 1000 FPM Limited FBO access in San Juan