DAVOS, 29-30 November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos 29-30 november 2010 Présenté par : JP. Marcovici Sigle.

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
1 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES.
Electronic Measure and Test Unit 53 Task 4 (P4).  A plan that clearly details the tests that will be performed  What to test  How to test (step by.
July 2010 D2.1 Upgrading strategy Javier Soto Catalog Release 3. Communities.
Analysis Modeling.
This presentation is intended as a detailed WebEx, to bring potential customers to an understanding of Dream Report capabilities. This presentation focuses.
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
DCS Architecture Bob Krzaczek. Key Design Requirement Distilled from the DCS Mission statement and the results of the Conceptual Design Review (June 1999):
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
SDW2005, juin, Taormina The Corot Space instrument.
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
SSFS Test Plan/Report Overview of the test cases What “success” means for a data format type test How the tests were conducted Key results and conclusions.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Steps to the Preliminary Design Review (PDR) ACES Presentation T. Gregory Guzik January 28, 2003.
Technological Design STS-118 Lunar Plant Growth Chamber Challenge © 2013 International Technology and Engineering Educators Association STEM  Center for.
EUSO-SODC status report M.C. Espírito Santo Huntsville, May 2003.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
Requirements Engineering CSE-305 Requirements Engineering Process Tasks Lecture-5.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
2-1 DMS Requirements Status Daryl Swade DMS Systems Engineer Nov. 6, 2013 S&OC Data Management System Design Review 3.
Live Simulations Featuring: FSI: Tranquility Base.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Getting Ready for PICARD Helioseismology Program – Decembre NICE THE PICARD PAYLOAD DATA CENTER Grégory PRADELS
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Picard Consortium meeting – PMOD/WRC, Davos, Nov 2010 Instrument SOVAP ( IRMB A. Chevalier pour S. Dewitte)  Flight operations  Right shutter status.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 10 Slide 1 Chapter 13 Finalizing Design Specifications.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
LHC Collimators Low Level Control Commissioning Status A Masi, LHC Collimators Low Level Control Commissioning Status LHC Collimators Low Level Control.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Common Alerting Protocol (CAP) v. 1.0 Emergency Management Technical Committee.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
Davos consortium discussion. Possible topics 1.Interests common to PREMOS, SOVAP, SODISM 1.New lab experiments 2.cross calibration 3.Onboard synchronisation.
GEtServices Purchasing Units & Materials Training For Suppliers Request.
Introduction to Interactive Media Interactive Media Tools: Authoring Applications.
Requirement Engineering. Recap Elaboration Behavioral Modeling State Diagram Sequence Diagram Negotiation.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
Corot:Ubatuba Nov The Ground Segment: Data Processing. Software development in laboratories. Brazilian contribution. Michel Auvergne Réza Samadi.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
Chapter 29: Program Security Dr. Wayne Summers Department of Computer Science Columbus State University
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
Instrument Teams to SOC Test Specifications
The Solar Oblateness Measured On Board The PICARD Spacecraft,
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
GLAST Large Area Telescope:
Launch and On-orbit Checkout
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
Presentation transcript:

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle : LATMOS GETCU (Groupe d’Expertise Technique de la Charge Utile)

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 2 SUMMARY GETCU in the PICARD ORGANIZATION LIST OF TASKS CONTROL THE HEALTH STATUS OF THE PAYLOAD NEW PAYLOAD OPERATIONS SUPPORT FOR SPECIFIC PAYLOAD OPERATIONS MEMBERS ORGANIZATION ACTUAL STATUS FOR EACH TASK

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 3 GETCU IN THE PICARD ORGANIZATION GETCU LATMOS IRMB PMOD

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 4 LIST OF TASKS OF THE GETCU The tasks of the GETCU concerns the 4 instruments PGCU, SODISM, SOVAP and PREMOS The main tasks of the GETCU are : -Analyze the data periodically in order to have a payload health status report -Define a new payload configuration after data analysis and in order to get a more optimize configuration -Give technical support for testing new procedures (Mission Center or Command Control Center) -Correct and update the flight operating software

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 5 PAYLOAD HEALTH STATUS REPORT (1/3) The health status report contains - an excel file with the main status for operating modes - values of housekeeping for PGCU, SODISM, PREMOS, ALIM (text and grafics) - alarms produced at CMSP - List of science TM which are missing The study consists in examining this report in order to - alert the expert if something seems not normal - anticipate an alert an decide for instance to change the configuration (example deviation between the SES and SODISM etc…) The report is produced each week for GPOM and each month

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 6 Example of content : array about SODISM shutter PAYLOAD HEALTH STATUS REPORT (2/3)

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 7 Example of graphics : PREMOS Heater Temperatures PAYLOAD HEALTH STATUS REPORT (3/3)

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 8 NEW PAYLOAD CONFIGURATION SODISM Adjust Thermal parameters for SODISM Adjust parameters of survey (Flight and ground) Adjust some TC parameters (duration of open shutter, etc…) SOVAP Calibration sequence PREMOS Calibration sequence Backup of detector Thermal parameters Heater configuration

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 9 SUPPORT FOR SPECIFIC OPERATIONS (AT CMSP) It is necessary to separate minor procedure changes (example to test a period of 10 minute for open/close PREMOS shutters) From major procedure changes (example to have a new scientific mode) Major changes: must be approved by GEVP at least and it must be checked that there is no significant impact on the payload (thermal, electrical) What is written in the SIO 1.LATMOS provides a description of the requested operations in simple terms 2.CMS-P translates it into a detailed text procedure 3.LATMOS validates the detailed procedure 4.CMS-P generates the TC groups corresponding to the valid procedure 5.LATMOS validates the TC groups on the LATMOS test bench (PGCU-SODISM EM, SOVAP MQ, PREMOS EM) and gives a report 6.If OK the new procedure is ready to be uploaded on satellite

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 10 MEMBERS OF GETCU FonctionNom% Affecté Manager of the group Flight software, programming new procedures Analyze housekeeping and preliminary report Command control payload expert JP Marcovici100% (included PICARD Sol) Expert SODISM instrument Thermal payload Electric consumption payload M Meftah 85% (is also project manager of PICARD Sol) Quality Plan Electronic support for mechanisms SODISM S Abbaki50% (included PICARD sol) Expert Flight software Analyze housekeeping and preliminary report AJ Vieau20% (40%  31/12/2010) Expert SOVAP (IRMB)A Chevalier Expert PREMOS (PMOD)D. Pfiffner Support for analyze of data and test for new procedures at LATMOS LATMOS engineer >=20% from 1/1/2011

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 11 CNES Technical support for the flight software Alimentation and thermal of the payload Manager for PICARD MIGS OPS service GEVP Support data treatment Optical support OTHER External expertise (electronic PGCU, expertise SODISM, flight software…) EXTERNAL SUPPORT

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 12 Interface LATMOS with SOVAP and PREMOS Permanent dialog by , and contact Necessity to have monthly teleconferences (LATMOS, SOVAP and PREMOS) in the future The next one must be organized before end of January In the commissioning period, LATMOS had three meetings but concerning only SODISM, and CNES dialogued directly with SOVAP and PREMOS ORGANIZATION OF THE GROUP

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 13 STATUS FOR EACH TASK OF THE GETCU GROUP (1/2) Health status report We must add a SOVAP report status and a report about the quality of SODISM images PASS New payload configuration Well defined in ICD document OK Specific operation Wish to adapt GETCU (LATMOS) contribution PASS Correct and update the flight software Quality and validation test well defined No correction to do OK Dynamic of the group It is really necessary to have Meeting with IRMB and PMODPASS

DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 14 STATUS FOR EACH TASK OF THE GETCU GROUP (2/2) About new procedure and the flight operating software 1) The flight software was specified in order to allow a lot of possibilities (SODISM test mode for instance) 2) SODISM SOVAP and PREMOS are driven independently (except synchronization possibilities) Even with this two facilities, it seems not easy to play new modes or new procedures due to different constraints