1 ESAIL proof of concept mission Juha-Pekka Luntama Pekka Janhunen Petri Toivanen.

Slides:



Advertisements
Similar presentations
GN/MAE155B1 Orbital Mechanics Overview 2 MAE 155B G. Nacouzi.
Advertisements

Space Engineering I – Part I
More Satellite Orbits Introduction to Space Systems and Spacecraft Design Space Systems Design.
LightSail.
Towards Low-cost Swedish Planetary Missions S. Barabash 1, O. Norberg 2, J.-E. Wahlund 3, M. Yamauchi 1, S. Grahn 4, S. Persson 4, and L. Blomberg 5 1.
Geospace Electrodynamic Connections (GEC) Mission The GEC mission has been in the formulation phase as part of NASA’s Solar Terrestrial Probe program for.
Babakin Space Center, Space Research Insitute, Makeev Rocket Design Bureau COSMOS ONE: THE FIRST SOLAR SAIL a project of The Planetary Society with Cosmos.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Attitude Determination and Control
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
Unit 2 GEOSTATIONARY ORBIT & SPACE SEGMENT
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
“Galileo Galilei” (GG) GG Phase A-2 Study funded by ASI ongoing at TAS-I (TO) with support from GG/GGG scientists GG target: test the Equivalence Principle.
Space Engineering Institute (SEI) Space Based Solar Power Space Engineering Research Center Texas Engineering Experiment Station, Texas A&M University.
Shu Zhang (on behalf of the HXMT team) Institute of High Energy Physics, Chinese Academy of Science The current status of HXMT and its calibrations.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Dr Mark Cresswell Satellite Sensors EG5503.
Satellite Communication
Launching, Orbital Effects & Satellite Subsystems
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Earth Observation, Navigation & Science Page 1 Capacity Final Presentation, , Estec, Noordwijk Report for WP 3300 WP 3300.
Optimal Low-Thrust Deorbiting of Passively Stabilized LEO Satellites Sergey Trofimov Keldysh Institute of Applied Mathematics, RAS Moscow Institute of.
Space Engineering 2 © Dr. X Wu, 2012
Radiation conditions during the GAMMA-400 observations:
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
CROSS-SCALE and SCOPE: The future in Space Plasma Physics Matt Taylor on behalf of Steve Schwartz, Masaki Fujimoto and the Cross-Scale and SCOPE Teams.
Attitude Determination and Control System (ADCS)
Brief introduction of YINGHUO-1 Micro-satellite for Mars environment exploration J. Wu, G. Zhu, H. Zhao, C. Wang, L. Lei, Y. Sun, W. Guo and S. Huang Center.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Polar Communications & Weather (PCW) Guennadi Kroupnik (CSA)
The Hard X-ray Modulation Telescope Mission
Rockets Need to overcome Earth's gravity Therefore need to obtain escape velocity Accelerate by throwing out mass (fuel) at very rapid speeds Newton's.
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Preliminary Design of NEA Detection Array Contractor 2 Kim Ellsworth Brigid Flood Nick Gawloski James Kim Lisa Malone Clay Matcek Brian Musslewhite Randall.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
CERES – Atelier Vol en formation pour l’astrophysique et la physique solaire 17 Octobre ASPICS 2 - Formation Flying for Solar Physics 100 m +/-
PLANETARY PROBE LASER PROPULSION CONCEPT 7 TH INTERNATIONAL PLANETARY PROBE WORKSHOP JUNE 2009, BARCELONA LE, T. (1), MOBILIA, S. (2), PAPADOPOULOS,
Chapter 12 Universal Law of Gravity
ORBITALS Phase A Extended Interim Meeting U of A Phase A2 Work Update ORBITALS Science Team, University of Alberta CSA HQ, St. Hubert, 2010/03/17.
Solar Orbiter Mission (ESA) - The near-Sun phase  approach the Sun as close as 48 solar radii (~0.22 AU). At these distances, the angular speed of a spacecraft.
CLUSTER AT THE EARTH’S BOW SHOCK André Balogh Imperial College, London or how Cluster saw this important boundary of the the Earth’s space environment.
Minimalist Mars Mission Establishing a Human Toehold on the Red Planet Executive Summary DevelopSpace MinMars Team.
Low Thrust Transfer to Sun-Earth L 1 and L 2 Points with a Constraint on the Thrust Direction LIBRATION POINT ORBITS AND APPLICATIONS Parador d'Aiguablava,
Space platform and Orbits Introduction to Remote Sensing Instructor: Dr. Cheng-Chien LiuCheng-Chien Liu Department of Earth Sciences National Cheng Kung.
Introduction to satellite Communications Lecture (11) 12/24/20151Dr. Hassan Yousif.
THE RESEARCH OF AEROBRAKE TECHNOLOGY USING ELECTRODYNAMIC TETHER
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
Satellite Climatology - Orbits Geostationary orbits Sun synchroneous orbits Precessing orbit Discussion.
Categories of Satellites
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Ares V an Enabling Capability for Future Space Science Missions H. Philip Stahl, Ph.D. NASA MSFC.
Workshop on Science Associated with the Lunar Exploration Architecture - Earth Science Subcommittee Theme: A Lunar-Based Earth Observatory Science Observations.
Look Angle Determination
Forecasting the Perfect Storm
Requirements, Alternatives, & ConOps
P2-SWE-X Enhanced Space Weather Monitoring System ESWW13
V. M. Lipunov, E. S. Gorbovskoy
Scientific Mission Applications
Launch and On-orbit Checkout
CubeSat vs. Science Instrument Complexity
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

1 ESAIL proof of concept mission Juha-Pekka Luntama Pekka Janhunen Petri Toivanen

2 Outline 1.Introduction 2.Mission objectives 3.Magnetosphere 4.Mission elements 5.Expected mission results 6.Demo mission schedule 7.Summary

3 Introduction The physical background of the electric sail concept has been carefully studied and simulated Sail manufacturing and deployment techniques are under development Remaining problem: Electric sail can not be tested or demonstrated on the Earth surface => A concept demonstration mission is needed to verify the analysis and the simulation results to demonstrate the feasibility of the sail deployment and control to test advanced concepts to improve electric sail efficiency

4 Mission objectives Main objectives: –Successfully deploy and operate an electric sail in space –Measure the acceleration of the spacecraft in different solar wind conditions –Test enhancement of the sail efficiency by electron heating Secondary objectives: –Many technical and scientific objectives considered: Monitoring of the electric sail behaviour in the dynamic solar wind conditions Spacecraft attitude control Characteristics of the solar wind near the sail Dust particle monitoring … –The secondary objectives will be carefully assessed and selected based on the mission partners and main mission profile => focus in strictly on the main mission

5 Earth’s magnetosphere Electric sail does not work (at least well) within the magnetosphere Even outside the magnetosphere the solar wind is disturbed e.g. in the foreshock region  apogee of the test mission orbit has to be well outside the magnetosphere  the shortest distance to undisturbed solar wind is towards the sun

6 Elements of a proof of concept mission Pre-phase A analysis –Payload –Spacecraft bus –Orbit –Launcher –Ground segment –Lifetime –Budget

7 Test mission payload Main payload: Electric sail prototype –Sail: 8 X 1 km aluminium four-fold Hoytethers –Mass estimates: Tethers: < 0.1 kg (25 µm) Reels: 4.0 kg Electron gun + radiator: 1.5 kg (40 kV & 1kW) High-voltage power source: 2.0 kg tether direction sensor: 2.0 kg Spinup thrusters: 3.0 kg Accelerometer: 0.5 kg Ion and electron detector: 1.5 kg PCU: 0.5 kg Total: 15 kg 2 km

8 Spacecraft bus requirements Essential requirements: –Spinner: spin rate 3 min per rotation –200 W electric power –Spin control during sail deployment –Ground link from 46 R e (telemetry and telecommand) –Propulsion for reaching final orbit –Tether reels minimum of 30 cm radial distance from the spin axis –Cooling for the electron gun Other requirements –Depend on the mission secondary objectives

9 Spacecraft requirements analysis Spinner => symmetrical spacecraft, fixed solar panel Very small payload => spacecraft mass impacts mostly perigee kick motor sizing Electronics radiation hardened due to solar particles and Earth radiation belts Spinup thrusters and tether reels benefit from the radial distance from the spacecraft rotation axis Spacecraft spin axis points approximately to the sun direction during the main mission => spacecraft body can be used to shield the electron gun

10 Test mission spacecraft outline Mission requirements can be fulfilled with a relatively simple, small weight spacecraft Spacecraft body should have a relatively large diameter and a large sun pointing surface => spherical or octagonal cylinder with a diameter of  1 m Payload constraints on the spacecraft body are modest => final design will depend on the launch vehicle and potential secondary payload instruments

11 Orbit selection criterias Essential requirements: –Apogee well outside the magnetosphere –Mission life time minimum of 1 month –No passes through densely populated satellite orbit regions (our spacecraft has effective diameter of 2 km) Important aspects: –No need for orbit maintenance –Simple spacecraft design => spin axis point to the sun –Minimize launch cost Nice to have: –Option to perform other space science observations

12 Other orbit aspects Extremely elliptical orbits unstable due to the Moon => either active orbit control or short mission lifetime Final orbit not reachable without a perigee kick motor => Spacecraft design more complex => Up to 75% of launch mass fuel => Longer and more complex LEOP phase due to orbit manoeuvres High initial orbit (e.g. GTO) => less fuel needed => higher launch costs Satellite visibility => ground station antenna location

13 Orbit candidates Equatorial orbit Low/medium inclination orbit Apogee radius:47 R e Perigee height:2800 km Inclination: 00 0  - 45  Orbit period:7 days Sun Moon orbit Bow shock Deceleration zone Acceleration zone

14 Launcher options Final orbit requires the use of a perigee kick motor => launch to either LEO or GTO Demo mission spacecraft: –dry mass << 100 kg –fuel from LEO to final orbit: 75% of the launch mass => launch mass 200 – 400 kg Piggy-back opportunities to be exploited => GTO orbit orientation potential limitation Dedicated small launcher allows mission lifetime optimisation

15 Ground segment Apogee height of 47 R e allows spacecraft control even from a high latitude station No satellite link during the perigee pass => Single ground station, operations during “office hours” One potential scenario: –Satellite ground station in Sodankylä, Finland –Mission control center at FMI premises –Mission operations by FMI staff –LEOP supported by launch provider –Data processing and analysis by mission partners

16 Mission lifetime Main limiting factors: –Orbit stability –Apogee direction Main mission objectives can be achieved during one month of experiments Conservative mission plan: => a three month mission with the “prime time” during the second month Next suitable observation period in 9 months => main mission objectives do not support extension of the mission life time beyond 3 months

17 Mission “prime time” definition Prime time Mission start Mission end Launch and LEOP

18 Mission budget estimate Spacecraft bus: 2 M€ E-sail payload: 1.5 M€ Launch: 1 M€ Mission operations: 0.5 M€ Notes: –The budget outline has been estimated by assuming that all components can be procured based on competitive tenders. –Maximize the use of existing facilities –The spacecraft bus and the payload are produced and tested with reduced requirements policy

19 Expected mission results Main mission objectives Successful deployment of E-sail tethers Successful observation/direction sensing of tethers Detected spacecraft acceleration: > 4E-6 m/s 2 Validation of E-sail theory: Dependence of acceleration on voltage and solar wind conditions Electron heating test: Dependence of acceleration on A/C modulation of electron beam, for different frequencies Secondary objectives E.g. monitoring of the dust particle hit rate and size distribution (effective detector area 1.7 m 2, i.e. largest ever flown)

20 Demo mission schedule One of the main schedule drivers is the development of the tether production line Estimated payload delivery time after the tether production capability exists is 1 – 1.5 years Launch could take place within 6 months from the payload delivery Nominal mission duration including LEOP is 4 months Satellite will be deorbited at the end of the mission

21 Summary Electric sail concept requires a test mission to: –Demonstrate deployment and operations of the sail in space –Measure the acceleration of the spacecraft in different solar wind conditions –Test enhancement of the sail efficiency by electron heating Demonstration mission can be performed with a reasonably small, simple and inexpensive spacecraft mission design driver is the need to fly outside the magnetosphere Life time of the demonstration mission is only 4 months E-sail demonstration can be combined with other space physics observations Mission can be performed in 2 years from development of the tether manufacturing capability