Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.

Slides:



Advertisements
Similar presentations
Geospace Electrodynamic Connections (GEC) Mission The GEC mission has been in the formulation phase as part of NASA’s Solar Terrestrial Probe program for.
Advertisements

07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
Icarus Student Satellite Project Hannah Goldberg Dr. Brian Gilchrist BT Cesul Student Space System Fabrication Lab (S 3 FL) University of Michigan, College.
ESA SSA SWE element status and near future plans 7th European Space Weather Week November, Brugge, Belgium Juha-Pekka Luntama Space Weather.
Icarus Student Satellite Project
Mission Operations in Small Satellite Projects Making Mission Operations Effective J. Burkert Colorado Space Grant Consortium.
National Aeronautics and Space Administration Centennial Challenges Program Space Technology Mission Directorate Cube Quest Challenge Lunar Derby and Deep.
Satellite communications and the environment of space Images: NASA.
Radio-amateurs have always been involved and are willing to pursue research on ionospheric propagation. AMSAT-Italia since the end of the year 2000 initiated.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
Aerosonde User’s Workshop Wallops Aerosonde UAV Facility Mission Proposing And Costing Factors Chuck Williams.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
SVY 207: Lecture 4 GPS Description and Signal Structure
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
BRITE-Constellation consists of six nano-satellites: UniBRITE and BRITE-AUSTRIA (TUGSAT-1) are funded by Austria, two more by.
IMPRS June Organigram of ESA, in the late 1980s
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
Cubesats A spacecraft concept to provide advances in international cooperation From: Doug Rowland, NASA GSFC Alexi Glover, ESA.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
The Hard X-ray Modulation Telescope Mission
上海天文台 Shanghai Astronomical Observatory e-VLBI Progress in China Zhang Xiuzhong, team of Chinese VLBI Network Shanghai Astronomical Observatory Chinese.
Space Geodesy (1/3) Geodesy provides a foundation for all Earth observations Space geodesy is the use of precise measurements between space objects (e.g.,
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Bits and Pieces. Spacecraft Systems Propulsion –Already discussed Communications Science instruments Power.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
By: Christiano Daniel Abadi. Deliverables/Achievements in Spring 2000: 8 Systems Engineering Documents Overall and power budgets Gantt Chart for Preliminary.
China National Report , Uppsala, Sweden China National Space Administration.
29 August, 2011 Beijing, China Space science missions related to ILWS in China
WMO Cliquez pour ajouter un texte GLOBAL CRYOSPHERE WATCH CryoNet Asia Workshop in Beijing, China - Report - CryoNet Team Meeting, Reykjavik, Iceland
SOWG # 6, 20/01/2015 ESAC Agenda  Finalization of the service 20 specifications  Test plans for the service20 at spacecraft level  Instruments.
Astronomy Class Lecture. What is the Sun? Is a ball of hot gases. Is 70% hydrogen, 28% helium, 1.5% carbon, nitrogen, and oxygen, and 0.5% all other elements.
AAE 450 – Senior Design J. Darcey Kuhn ERV Team – Communications January 23, 2001.
NPOESS Transmission Frequency Issues Satellite Direct Readout Conference for the Americas 11 December 02 David F. McGinnis.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
© ИАЦ КВНО ЦНИИмаш Собственность ИАЦ. All rights reserved GLONASS Status and Progress Sergey Revnivykh CGSIC Meeting , Savannah, GA, US.
LISA News from ESA O. Jennrich LISA Project Scientist.
NEWLY COMMISSIONED OFFICER VACANCY ANNOUNCEMENT NEW YORK AIR NATIONAL GUARD 174th ATTACK WING 6001 EAST MOLLOY ROAD SYRACUSE, NY ANNOUNCEMENT#:
This document contains proprietary and controlled information of National Space Organization (NSPO) of Taiwan and shall not be duplicated in whole or in.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
An inspirational space mission we can all be part of!
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
Mission: Moon!. What is it like on the Moon? Length of Day Atmosphere Temperature Water Radiation Gravity Landscape.
한 미 려 – Introduction (1) 2.Instrument & Observe 3.Science 2.
Korea Aerospace Research Institute (KARI)
Preliminary Platform Design for KuaFu-A
USNA Next Generation Ground Station
Bureau of International Cooperation Chinese Academy of Sciences (CAS)
Maxim Pathfinder Prework 16 August 1999
How NASA communicates with spacecraft
Launch and On-orbit Checkout
The STEREO Space Weather Broadcast
EagleSat 2 – Mission and Development Overview
The Challenges of 24/7/364 Day Operations A Spacecraft Operator’s View
Types of Spacecraft The FRAME Routine Key Topic is about…
Main information on the «WORLD SPACE OBSERVATORY» project
Space Weather and HI Richard A. Harrison, RAL
Presentation transcript:

Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology

Q1: Is a 3-axis stabilized Sun-Pointing Spacecraft, like STEREO and SOHO feasible? A: It could be feasible, but depends on the scientific requirements Confirmed later: Near earth orbit Promised precision: degree/s In reality 1arcsec/s (no experience for L1)

Q2: What would be the orbit? A: Lissajous or Halo, also depends on the mission requirements

Q3: What is the available electrical power? A: The conceptual answer would be around 60~70W at least for all payloads.  confirmed later: W

Q4: What is the maximum payload mass? A: The conceptual answer would be around 100kg at least for all payloads.

Q5: Fuel is needed for station keeping. For how long time can the mission be maintained? We dream of a time of about 6 years minimum, beginning near solar activity maximum though the next minimum! A: If it is necessary and we have enough money we could do that. confirmed later: Life time, limit 3 years for design (?)

Q6: Some pointing stability is needed, in particular for the optical instruments. We have to find a compromise such that the cost for spacecraft pointing remain within limits and that the effort for internal pointing provisions inside the instruments also remain within limits. A: Thank you for your very kind consideration.

Q7: Are there already plans for a project structure: program/project manager - Project scientist - Science Working Team – PIs- etc? A: We have not any formal organization of the project by now. Not only for scientists group but engineers group.

Q8: What will be the telemetry rate? Will it be continuous (optimum), or buffered on board? For which time periods (that probably depends on the number of available ground stations)? At which rates? A: Sorry, no idea at moment. But the continuous downlink could be impossible because we need real time support from the deep space network if that. confirmed later: data rate could be a few Mbps in near earth orbit satellites. No experience for L1 satellite yet.

Q9: A minimum uninterrupted telemetry rate is highly desired for transmitting most essential data in near real-time, for on-line space weather monitoring. Is that possible? A: As above, if we need the support from Deep Space Network, we need the involvement of the government.

Q10: Telescopes need some space, in particular: length, say 1.5 m maximum. Possible? A: Conceptually no problem

Q11: For the radio antennae one should also look for the STEREO example. A: Conceptually yes

Q12: The magnetometer should be located on a little boom, probably extendable, probably in the permanent spacecraft shadow. See STEREO. A: OK, we will have the shadowed side of the 3-axis stabilized spacecraft.

Q13: The normal procedure for a project like this one would be: Call for ides (done)- Call for mission proposals (assessment study by interested scientists with modest engineering advice, (at present) Selection by agency for Phase A study Public AO (Announcement of Opportunity) Instrument proposals submitted and selected Final approval by agencies to begin Phase B (hardware) Etc. In this context: Is an AO (i.e., contest!) foreseen? If yes: who writes it and who selects? A: Who will write the AO I think it is not very urgent at the moment. If it is very clear and ready, Chinese colleagues could do that. But may we need a template of that because we have no experience on that.

Q14: What are the main project mile stones: Prepropsal submission, Approval for Phase B and Issue of AO, Final Mission approval, Malor reviews, Instrument delivery, Launch A: At the moment I can not answer your question. But generally we need following high level reviews for spacecraft:  Phase 0 review  Phase A review  Phase B review  Delivery review  Preshipment review  Launch ready readiness review  Commissioning and go-ahead review

Q15: Where is mission control and which are its duties? A: If the mission control center is in China, there should be two centers: For spacecraft operation, they should do: Routine tracking; Spacecraft status monitoring; Spacecraft control; Contact with the payload center. For payload operation, they should do: Payload operation and control; Payload status monitoring; Cooperation with the spacecraft operation center; Communication with the different ground station and issue the tracking planning.

Q16: What do we do with the data on ground? What will be the role and the responsibility of the Europeans after launch? Is there a dedicated space weather warning center foreseen?  May we need some data centers to distribute the scientific data. At least one center in China, at least one center in Europe.  The role and the responsibility (only payloads) could be:  The routine support of the payload operation;  Joint scientific team activities;  Mutual support between the spacecraft and payloads.  There is not a dedicated space weather center in China formally at this moment. But several institutions are trying.