MÁV Co. Transport Safety Project (KözOP) Video Track Inspection System (VPR) Installed Vehicle Diagnostic equipment Tamás Both commissioned head of department.

Slides:



Advertisements
Similar presentations
Terje Andersen 06 May 2011 Analysis of past derailments Information from data bases, investigation reports and surveys.
Advertisements

Gavin Astin/ Terje Andersen 06 May 2011 Survey of Existing measures.
Background Presenters Work done in preparation for WHS changes
Dynamic monitoring of traffic signs on roadways. INTRODUCTION TRAFFIC SIGNS ALONG ROADWAYS Approximately half of traffic accidents in developed countries.
Prospectus about Land Rover type reconnaissance car.
ADR company checks in Romania
[Organisation’s Title] Environmental Management System
Traction Control of Electric Locomotives
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Transport Railways Incident Procedures. Aim To give students information about the emergency procedures to be adopted at incidents involving railways.
Smart Sensor Technology For Rail Network health Hawk Measurement Systems.
Vertical Solutions.
WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli.
Road Safety Review and Aggressiveness in road traffic– Experience from the Republic of Serbia Mag. Dragoslav KUKIĆ Chief Engineer for planning and development.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Certification of railway equipment. JSC VNIIZhT Test Centre Speakers: Alexandr Savin Eduard Gunchenko 17 October 2012 VNIIZhT (JSC Railway Research Institute)
Design, Implementation and Maintenance
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Driven By Safety Ron Salter Salters Cartage Ltd. Driver Selection and Health 1. driver application form to contain history 2 Drug test on site 3 Medical.
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
VIKING Workshop – Hamburg, DE, March 2007 Best Practices in Monitoring Deployment, Hamburg, Germany Innovation in Monitoring VIKING Workshop “Best.
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
ISO OPERATIONAL CONTROL
Safety of Train Traffic in Time of Strike István Gaskó President of Free Trade Union of Railway Workers Hungary Denver 2008 october.
UIC ERTMS World Conference
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
TSI WAGONS (321/2013) modifications BEWAG 27/04/2015.
Increasing of level crossing safety. Protecting modes of level crossings on MÁV network.
1 N700-I Bullet Contribution to strengthen the relationship between US and Japan Katsuhiko Ichikawa General Manager Central Japan Railway Company (CJR)
Drill 2012 Adelaide “Drilling into the Future” CHAIN OF RESPONSIBILITY & FATIGUE REGULATIONS PRESENTER: PAUL QUILLIGAN.
20/06/051 Technology Challenges for 350 km/h EurailSpeed 7-9 November 2005 Session E1 Louis-Marie CLEON I&R Technical Director.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
Ministry of Industry and Trade of Russian Federation June 2013 Deputy director of the Department of transport and special engineering industry V. Kaganov.
Development of Agreement Concerning the Adoption of Uniform Conditions for Periodical Technical Inspections of Wheeled Vehicles and the Reciprocal Recognition.
Name Of The College & Dept
Session 11 & 12. Auditing standard of I.A. & A.D. Prescribes: Auditor should report about weakness in Internal Control of management (Para 7.1.) Weakness.
Detector Derailment Device (&) Frenado (Braking) Automatic Train
International Railway Safety Conference 2008 A regulator’s challenge – inspecting the right things Allan Spence HM Deputy Chief Inspector (Operations)
Scientific Production Company Dneprspetsmash Ukraine, Dnipropetrovsk Heavy-duty multifunctional track motor vehicle AD-01.
LIFETIME ENGINEERING of Buildings and Civil Infrastructures Thematic Network LIFETIME in figures: Working period: 1/6/ /5/2005 Participation: 96.
CE2303 Railway Engineering
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport Bilateral screening:
1 DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT Digital Tachograph : Information Seminar Budapest, 25-26/02/20009 Digitac.
SIAFI, Paris, Infrastructure Activities Databases and Benchmarking  Franco SCHIAVI: Senior Advisor  Aleksandra PERKUSZEWSKA: Database Administrator.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
השוואת תנאי עבודת עתקים ודרישות בטיחות נעשתה בהתאם לדו"ח מבקר 3/13. ISRAEL RAIL COMPANY General Overview Udi Kaplansky (MSc. Safety Engineering) VP Safety,
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
V6 Safe loading. Fleet Operator Recognition Scheme (FORS) FORS is important to our company because it helps.
ROAD PROFILING-ROUGHNESS Presentation by Niranjan Santhirasegaram
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Developments aiming to improve traffic safety on the network of GYSEV Zrt Február 7. Gócza József.
1 Address: UIC Safety Database (SDB) System and Results.
Virtual Track Surveying Paul Furniss. An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System?
Regional Road Safety Workshop
GRRF Ad-Hoc Working Group
Guide for the application of the CSM design targets (CSM-DT) Annex 3 – Fitting existing passenger trains with an onboard Hot Box Detection system.
Today´s Challenges of the Rail Infrastructure Industry
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
PRESENTATION OF MONTENEGRO
PRESENTATION OF MONTENEGRO
UIC 518.
Student’s Name with USN No.
SPECIAL LEGISLATION & REGULATION IN SPAIN
I&C requirements and configuration management
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

MÁV Co. Transport Safety Project (KözOP) Video Track Inspection System (VPR) Installed Vehicle Diagnostic equipment Tamás Both commissioned head of department 7th February 2013

Elements of the present track inspection system Inspection on foot –inspection on foot by patrolmen –Inspection on foot by track-master, chief track-master, section engineer Examinations and measurement in turnouts Line inspection on railway vehicles Inspection of engineering structures ( bridges, culverts, tunnels, etc.) Track geometrical measurements Ultra sonic rail inspection Clearance gauge measurements and examinations 2

VPR structural scheme 3

Main features of video track inspection system (VPR) Able to execute the examinations without disturbing the traffic till the speed of 120 km/h with self-propelled diesel vehicle Measurement by non-contact method, with l aser optic principle, on the base of video records Able to take clear pictures by digital high-speed and low-noise cameras Minim um examination width counted from the track axis 1,75-1,75 m Its two main functions : recording the structural elements of the railway track and panoramic record Able to examine and automatically evaluate m easuring parameters Able to supply local fault list Makes a statistical list for a chosen measuring length 4

Aim of VPR Decreasing of the risk of transport safety and work safety Updating of track inspection activity, track inspection system and procedures, Increasing the objectivity of track inspection examinations, Accurate and traceable documentation of the track state and its change, Accurate identification of the structural elements of te railway track, 5

Advantages of VPR State of the a rt technology Decreases the subjectivity of track inspection Suitable for objective qualification of the structural state Early recognition of rail faults with cracks (Head Check) Suitable for objective examination of high-speed lines Live-labour and cost-efficient solution Risks of traffic safety and work safety decrease Enables the accurate documentation of track state and its change, the more efficient designing of elimination of faults and disturbances Ensures the classification of local faults, and supplies the fault list depending on the speed and size-limit category 6

7 Realisation of VPR 1.) Vehicle _1 1.) Vehicle _2 1.) Vehicle _3 VPR Recording Cars and measuring systems VPR-1 VPR-2 VPR-3

Realisation of VPR Incorporation 3 pcs VPR recording cars into system Within the frames of KÖZOP supporting contract : –Procurement of 3 pcs VPR vehicles –Procurement of 3 pcs VPR measuring systems Tender calling for public procurement of negotiation Tes ting, training of the structural elements of MÁV Co’s lines Further development of VPR measuring system and evaluation software Modification of track inspection regulation (D5), approval by the authority Incorporation VPR into system 8

Characteristics of VPR measuring system 3 pcs VPR measuring systems Contact free examination Its external measuring boxes ( beams ) are located inside the railway clearance gauge. It can examine and supply measuring data at least at 120 km/h s peed range Each record is synchronised with the railway chainage Applies the MÁV database Recording the structural elements of the railway track Panor amic record Determination of the faults of the structural elements Office evaluating and processing system 9

Characteristics of VPR vehicle 3 db d iesel railcars transformed according to the requirements of VPR recording car serves as accommodation for VPR measuring system and staff Ensures connecting points for mounting the VPR measuring system With two engine driver’s cabins 120 km/h allowed and measuring speed Ensures the accommodation of 6 persons Air-conditioned M easuring room, sleeping compartments, dining room, lavatory, technical rooms Supplying the electric energy necessary for the operation of VPR m easuring system 10

VPR evaluation, examination report 11

VPR evaluation, examination report 12

Installed vehicle dynamic equipment Hazard point Sensor Hot bearing ( vehicles with hot box ) Hot bearing signal Jammed, stickked brakes ( braked wheels ) Flat wheel D y nami c wheel load meter and wheel flat detector Overloaded vehicles Moved consignment, uneven consignment distribution Broken axles, body-springs Over-reaching the loading gauge Loading gauge checker Wheels under tolerances Wheel flange checker Faulty pantograph Pantograph detector Contact pressure ( between pantograph and contact wire ) 13

Accident occurred due to hot bearing in Italy –June 29th :48 Viareggio (IT): –32 victims, 267 seriously injured people –Due to the breaking of an axle pivot the first 7 wagons of the freight train consists of 14 wagons derailed, from these 5 overturned, one tank ripped, gas (but ane ) spread, then blow up. – Victims emerged from the population, rescue teams found 7 victims under the collapsed h ouses. 14

Hot-bearing detectors operating on MÁV Co’s network 15 Rétszilas Rajka Hegyeshalom Szob Székesfehérvár Hatvan Cegléd Győr Tatabánya Szajol Szombathely Zalaegerszeg P.szabolcs Kunszentmiklós Mezőtúr Püspökladány Füzesabony Szerencs Kisvárda Nyírbogdány

Necessity and aim of dynamic wheel-load measurement Development of such a diagnostic equipment which registers and filters out the running of vehicles dangerous from transport safety aspect. Operation of the system enhances the safety of railway transport, Decreases significantly the maintenance costs of the railway network and accident damage restoration costs originating from the technical state of the vehicles, or improper loading. Gives information concerning the actual mass of the coach and train- set which is a relevant element of the statement of network access fee (track access fee). 16

Loading gauge monitoring equipment 17

Thank you for your attention