1 Building Use Study Plattsburgh City School District Advisory Committee Meeting November 20, 2013 Castallo and Silky- Education Consultants Bill Silky.

Slides:



Advertisements
Similar presentations
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Advertisements

BOE PRESENTATION – TONA 2020 UPDATE JANUARY 30, 2014 PRESENTED BY: CARRIE OLIVER, LISA DRMACICH, BRIAN MISLIWY AND JAMES NEWTON.
1 Building Use Study Plattsburgh City School District Presentation to the Board January 9, 2014 Castallo and Silky- Education Consultants Bill Silky and.
Consolidation Study Recommendations and Possible Timeline
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
I.The Building/Remodeling/ Renovating Project NSSED North Shore Academy (NSA) and Administration Office Building/Remodeling/Renovating Project.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
BOE Information Session Evolving Plan to Address Student Enrollment Challenges as of November 9, 2011.
BOE PRESENTATION – TONA 2020 UPDATE June 24, 2014 PRESENTED BY: CARRIE OLIVER, LISA DRMACICH, BOB STARR, DIANE MISNER AND JAMES NEWTON.
UNIT 5 REDISTRICTING COMMUNITY FORUM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm.
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
SHARON CITY SCHOOL DISTRICT Page 1 of 18. SHARON CITY SCHOOL DISTRICT Page 2 of 18 OPTION 1C – New Building on Case Avenue Site  Building Grades: K-6.
The Roll of GIS In School Board Planning. Presentation Overview ► Introduction ► Board’s Roll in the Planning Process ► GIS at York Catholic ► GIS At.
School District Efficiency Study Morrisville-Eaton Central School District Advisory Committee Meeting FINANCES AUGUST 20, 2014 Castallo and Silky Education.
School District Efficiency Study Morrisville-Eaton Central School REVIEW OF REPORT October 15, 2014 Castallo and Silky Education Consultants
GUIDELINES FOR DEVELOPMENT OF STUDENT ASSIGNMENT BOUNDARIES Board of Education Meeting Eugene Street Board Room July 12, 2011.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting August 21, 2013 Castallo and Silky- Education Consultants Bill Silky and.
School District Efficiency Study Morrisville-Eaton Central School District Advisory Committee Meeting REVIEW OF DRAFT REPORT SEPTEMBER 17, 2014 Castallo.
Review the administrative team findings in regard to the recommendation with our two smaller schools at Lincoln Park and West Wyomissing. Review and explain.
BVUSD Facility Workshop September 17, Board Policy-BP 7110 The Board of Trustees recognizes the importance of long-range planning for school facilities.
Planning Today For Our Children’s Future CCS Facilities Study Follow-Up Informational Presentation February 4, :00 PM - CHS.
Long Range Facility Planning assisted by Silver Falls School District.
LOCKPORT CITY SCHOOL DISTRICT Washington Hunt Elementary School Michelle T. Bradley Superintendent of Schools Deborah Coder Assistant Superintendent for.
Steindorf Tenant Relocation Jason E. Vann, CFO September 18, 2014.
Space Utilization Project Chandler Unified School District 2010.
MIDDLE SCHOOL CONCEPT FOR THE RUTHERFORD SCHOOL DISTRICT.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Analysis of Salvador and El Centro School Boundaries SEPTEMBER 16, 2015.
1 Patterson Unified School District Presentation to staff Governor’s proposed Budget for Presented by Esther Corral-Carlson Superintendent & Steve.
Demographic Advisory Committee Thomas BarryRebecca Kalagher LeAnn BeaulieuBonnie Mazzoli Maureen BrennanTimothy Neville Daniel CooganJennifer Rancourt.
1 School District Efficiency Study Morrisville-Eaton Central School District Advisory Committee Meeting April 23, 2014 Castallo and Silky Education Consultants.
Development Committee School Usage and Building Recommendations Big Walnut School District Board of Education Meeting June 9, 2008.
Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.
Should We Conduct a Preliminary Study? Dansville and Keshequa Central School Districts December 3, 2013 William D. Silky and Alan D. Pole Education Consultants.
11 School Board Monitoring Report: Capacity Update Arlington Public Schools April 29, 2010.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting November 20, 2013 Castallo and Silky- Education Consultants Bill Silky.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Warren Township Study To Examine Enrollment Project (STEEP) Project Plan & Criteria High Level Timeline Sub-Committee Goals & Deliverables Revised October.
OCTOBER 15, 2015 SCHOOL CONSOLIDATION & REDISTRICTING Dr. Karen M. Couch, Superintendent Ron Kauffman, RK Educational Planning, LLC.
Operating Budget Funding Sources State Appropriations - General Revenue Formula Funding, Special Items, Benefit Cost Sharing THECB Transfers TX Grant,
Recommendation of the Facilities Utilization Advisory Committee Strongsville City Schools March 11, 2010.
School District Merger Study Crown Point Central School and Ticonderoga Central School December 4, 2012 Castallo and Silky Education Consultants.
UPDATING 5-YEAR/10-YEAR FACILITY PLAN PLANNING FOR SUCCESS.
Financial Update and Impact Pinconning Area School District January 2010.
Facilities Study Committee September 20, Meeting 1 Agenda Introductions Committee Makeup Parents Staff Community Members Goal Process Middle School.
Train Station Project Update Report from Ad Hoc Committee December 11, 2007.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Wahoo Public School District Facility Planning Update April 18, 2016.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Hillsborough County Public School Siting MPO SCHOOL TRANSPORTATION WORKING GROUP
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
UPDATE: 8/8/2011 Batavia City School District
School #1 Ballot Question and Proposal
Blackhawk School District
Castallo and Silky LLC Jessica Cohen and Alan Pole, Consultants
Castallo and Silky LLC Jessica Cohen and Alan Pole, Consultants
Dublin Unified School District
Castallo and Silky LLC Jessica Cohen and Alan Pole, Consultants
Referendum Discussion
Fair Lawn BOE: Concept Planning
Castallo and Silky LLC Jessica Cohen and Alan Pole, Consultants
Castallo and Silky LLC Jessica Cohen and Alan Pole, Consultants
Oak Park School District 97
Castallo and Silky LLC Jessica Cohen and Alan Pole, Consultants
Pillager Public School District Community Survey Results
Facility and Grade Organization Study Massena Central School District
City Council Meeting April 29, 2019
Presentation transcript:

1 Building Use Study Plattsburgh City School District Advisory Committee Meeting November 20, 2013 Castallo and Silky- Education Consultants Bill Silky and Phil Martin, Consultants

Purpose of Study 1.Given the practical capacities of the existing schools and in light of future enrollment projections, is it feasible to reduce the number of operating school buildings and continue to maintain the quality of the educational program? If so, how might the buildings best be utilized and what might the fiscal implications be? If not, what building modifications, if any, should be made, and why? 2.Is it feasible to relocate district office functions to another school building? If so, what are the options for their relocation? 2 Castallo & Silky-Education Consultants

Enrollment History and Projections: Update 3 Castallo & Silky-Education Consultants

Updated Enrollment Projections 4 Castallo & Silky-Education Consultants

Facilities 5 Castallo & Silky-Education Consultants

2013 Building Conditions Survey: Elementary Schools 6 Castallo & Silky-Education Consultants

Building Utility Costs 7 Castallo & Silky-Education Consultants

Space Utilization 8 Castallo & Silky-Education Consultants

High School Room Utilization Castallo & Silky-Education Consultants

10 Castallo & Silky-Education Consultants K-5 Enrollments and Sections

Projected Number of Elementary School Grade Sections 11 Castallo & Silky-Education Consultants

Findings Except for special education students, all students walk to school K-12 enrollment has declined by 1.6% over the past five years, from 1,833 to 1,804 K-12 enrollment is projected to increase by 3.4% over the next five years, to 1,865. K-5 enrollment has increased by 1.9% over the past five years, from 829 to 845. K-5 enrollment is projected to increase by 7.7% over the next five years to Castallo & Silky-Education Consultants

Findings Middle school enrollment has declined by 4.4% over the past five years, from 408 to 390. Middle school enrollment is projected to remain stable for three years, then increase to 420 (+7.7%) in five years and back to 414 in seven years. High school enrollment has declined by 4.5% over the past five years, from 596 to 569. High school enrollment is projected to decline by 6.0% in five years to 535, but then increase to 563 in seven years. 13 Castallo & Silky-Education Consultants

Findings There is potential for residential development in the city similar to the development 5-8 years ago, with about 40 lots being developed The elementary school instructional programs are very similar; however, student performance at Bailey/Oak is somewhat higher than Momot. This most likely is attributed to socio-economic differences in the attendance areas served. All buildings in the district need some structural improvement. 14 Castallo & Silky-Education Consultants

Findings Over the next five years the three elementary schools will need the same number of classrooms as this year, but no more than this year. Except for Stafford Middle School, school parking areas are adequate for current use. Relocating students to Bailey or Stafford would require additional parking. The boundaries of Stafford Middle School do not permit the construction of additional parking. 15 Castallo & Silky-Education Consultants

Findings Construction of additional classrooms at Bailey may require acquisition of park property from the City. The legality of acquiring park property from the City is uncertain, even if the City is willing to release the property. Additional classrooms at Bailey could present safety concerns regarding the increased influx of vehicles at the beginning and end of the school day. 16 Castallo & Silky-Education Consultants

Options: Advantages & Disadvantages 17 Castallo & Silky-Education Consultants

Options 18 Castallo & Silky-Education Consultants 1.Continue current grade and building configuration 2.Keep all classroom buildings open; relocate district office functions to middle/high schools; sell, lease, or maintain Duken building 3.Sell Duken or swap for city park property; close Oak; construct 20-classroom addition to Bailey; relocate district office functions to middle/high schools, or Oak, or Bailey; sell, lease, or maintain Oak 4. Construct 8-classroom addition to Bailey; close Oak; reconfigure grade alignment to PK-4, 5-8, 9-12; realign attendance zone with one-quarter of Bailey to Momot; relocate district office functions to Oak or Middle/High Schools

Option 1 Continue current grade and building configuration 19 Castallo & Silky-Education Consultants AdvantagesDisadvantages Keeps all classroom buildings open to accommodate possible enrollment increase Avoids any negative reaction to change Does not make efficient use of current building space Does not reduce operational costs

Option 2 Keep all classroom buildings open; relocate district office functions to middle/high schools; sell, lease, or maintain Duken building 20 Castallo & Silky-Education Consultants

Option 2 Keep all classroom buildings open; relocate district office functions to middle/high schools; sell, lease, or maintain Duken building 21 Castallo & Silky-Education Consultants AdvantagesDisadvantages Keeps all classroom buildings open to accommodate projected enrollment increase Increases efficiency of space utilization if Duken is sold or leased If Duken is sold, an annual operational savings of approximately $71,825 - $84,600 is generated (current assessed valuation of Duken is $1,879,200) Avoids any negative reaction to change in student building assignments Diminishes communication effectiveness among district office personnel Reduces available classroom space at the middle school and high school should student enrollment increase substantially

District Office Function Relocation 22 Castallo & Silky-Education Consultants

23 Castallo & Silky-Education Consultants District Offices At High School

Option 3 24 Castallo & Silky-Education Consultants a. Sell Duken or swap for city park property; close Oak; construct 20-classroom addition to Bailey; relocate district office functions to high school and middle school; sell, lease, or maintain Oak b. Sell Duken or swap for city park property; close Oak; construct 20-classroom addition to Bailey; relocate district office functions to Oak; lease or maintain remaining space at Oak c. Sell Duken or swap for city park property; close Oak; construct 20 plus classroom addition to Bailey; relocate some district office functions to Bailey, and some to high school and middle school; sell, lease or maintain Oak

25 Castallo & Silky-Education Consultants Additional Classrooms at Bailey Should Oak Close

26 Castallo & Silky-Education Consultants Cost Estimate for Addition to Bailey

27 Castallo & Silky-Education Consultants K-5 Staffing and Estimated Cost Saving Should Oak Close

Option 3a Sell Duken or swap for city park property; close Oak; construct 20-classroom addition to Bailey; relocate district office functions to high school/middle school; sell, lease, or maintain Oak 28 Castallo & Silky-Education Consultants

Option 3a Sell Duken or swap for city park property; close Oak; construct 20-classroom addition to Bailey; relocate district office functions to high school/middle school; sell, lease, or maintain Oak 29 Castallo & Silky-Education Consultants AdvantagesDisadvantages Increases staffing efficiency Provides annual cost saving of at least $212,820 Reduces the number of building transitions for students Enhances parent involvement (B/O) Enhances curriculum articulation (B/O) Increases total district student capacity if Oak not sold Provides possible revenue generation from sale/lease of Oak and/or Duken If Oak is leased or maintained, provides margin of safety for location of district offices if enrollment increases Legality of property swap or sale with City & interest of City is uncertain Approval of 20-classroom addition by S.E.D. is uncertain Some staff would lose jobs Increases debt service approximately$100,000/year for 20 years Vehicular traffic at Bailey would increase substantially Parking lot at Bailey could need expansion Could generate negative reaction to change Diminishes communication effectiveness among district office personnel

Option 3b Sell Duken or swap for city park property; close Oak; construct 20-classroom addition to Bailey; relocate district office functions to Oak; lease remaining space at Oak 30 Castallo & Silky-Education Consultants

Option 3b Sell Duken or swap for city park property; close Oak; construct 20-classroom addition to Bailey; relocate district office functions to Oak; lease remaining space at Oak 31 Castallo & Silky-Education Consultants AdvantagesDisadvantages Increases staffing efficiency Provides annual cost savings of at least $132,800 Reduces the number of building transitions for students Enhances parent involvement Enhances curriculum articulation Increases district’s total student capacity if Oak is not sold Provides possible revenue generation from sale or lease of Duken and lease of space at Oak Maintains communication efficiency among district office personnel Legality of property swap or sale with City & interest of City is uncertain Approval of 20-classroom addition by S.E.D. is uncertain Some staff would lose their jobs Increases debt service approximately$100,000/year for 20 years Vehicular traffic at Bailey would increase substantially Parking lot at Bailey could need expansion Could generate negative reaction to change Does not take advantage of revenue from sale of Oak

Option 3c Sell Duken or swap for city park property; close Oak; construct 26-classroom addition to Bailey; relocate some district office functions to Bailey and some to high school and middle school; sell, lease, or maintain Oak 32 Castallo & Silky-Education Consultants

Option 3c Sell Duken or swap for city park property; construct 20- classroom addition to Bailey; close Oak Street; lease, sell, or maintain Oak; relocate district office functions to Bailey. 33 Castallo & Silky-Education Consultants AdvantagesDisadvantages Increases staffing efficiency Provides annual cost saving of at least $185,300 Reduces the number of building transitions for students Enhances parent involvement (B/O) Enhance curriculum articulation (B/O) Increases district’s total student capacity if Oak is not sold Provides possible revenue generation from Oak and/or Duken Legality of property swap or sale with City & interest of City is uncertain Approval of 20 plus classroom addition by S. E. D. at Bailey is uncertain Increases debt service approximately$125,000/year for 20 years Vehicular traffic at Bailey would increase substantially Parking lot at Bailey could need expansion Requires minimal initial cost to relocate district office functions Could generate negative reaction to change Diminishes communication effectiveness among district office personnel

Option 4 Construct 8-classroom addition to Bailey; close Oak; reconfigure grade alignment to PK-4, 5-8, 9-12; realign attendance zone with one-quarter of Bailey to Momot; relocate district office functions to Oak or Middle/High Schools This option is not feasible because: 1- A lack of instructional classroom space for additional grade and lack of parking space. Assessment of possible space availability at Stafford finds that a maximum of six classrooms could be made available. Over the next seven years a minimum of seven to eight classrooms would be necessary for the building to serve grades The parking lot is inadequate to accommodate staff currently, with no room for expansion. Accordingly, the lot could not accommodate increased staff for a 5-8 middle school. 34 Castallo & Silky-Education Consultants