1 The 2 nd Green Mekong Forum International Conference on “Green Mekong Initiative” Water Resources Management in Lao PDR By: Mr. Phousavanh Fongkhamdeng.

Slides:



Advertisements
Similar presentations
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
Advertisements

FLOODS AND DROUGHTS IN 2002 IN THE CAMBODIAN PARTS OF THE MEKONG BASIN — EXPOSURE, RESPONSE AND LESSON LEARNED — Prepared for THE SECOND ANNUAL FLOOD FORUM,
Hydropower Development: Experience of Nepal
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 3: Climate resilience and low carbon strategies developed Activity Progress and Component Strategy.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component.
MINERAL RESOURCES DEVELOPMENT POLICY(2013) 14 th February 2014 MINISTRY OF MINES, ENERGY AND WATER DEVELOPMENT 1.
IWRM as a Tool for Adaptation to Climate Change
VIETNAM Water Resources Demand Management for Irrigation Workshop on Water Resources Demand Management Learning Forum for Irrigation July 2011, Bangkok.
Chemical Management in Laos
«Проект по экономической реабилитации и построению мер доверия» Integrating interests and institutions in water resource management 25 th June, 2013 Eng.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
ASEAN WORKING GROUP ON WATER RESOURCES MANAGEMENT (AWGWRM)
1 The 14 th Meeting of the ASEAN Working Group on Water Resources Management (AWGWRM) Increasing Long Term Awareness Knowledge and Community Participation.
Regional Forum on Environment and Health in Southeast and East Asian Countries HomeGovernancePolicy documentsScientific panelThematic working groupsKnowledge.
Preliminary theory of change for the South China Sea Project Cluster Neeraj Negi Reference Group Meeting Bangkok, Thailand September 27, 2010.
GHANA Developing CSA within the National Agriculture Sector Investment Plan while reinforcing inter-sectoral consistency: progress, bottlenecks and support.
Proposed plan to implement Capacity Development for CDM project in the forthcoming period Dr. DAO DUC TUAN Eng. NGUYEN KHAC HIEU National Office for Climate.
Scoping Assessment on Climate Change Adaptation: Thailand.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
Summary of Recommendations on Data Availability, Access and Use by Leisa Perch MACC PDF-B Technical Coordinator, Organization of American States.
Agenda 6.7- Exchanging Information and Creating Awareness in a Structured Basis between Peak Bodies 12 th Meeting AWGWRM Vietnam, 25 – 26 July 2012 Exec.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
Supporting Integrated and Comprehensive Approaches to Climate Change Adaptation in Africa AAP Country Conference “Celebrating our Successes” 12 th - 16.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Looking Forward the Post-2015 Sustainable Development Goals (SDGs) UNSD-DFID Project on National Development Indicators: Country Director's Meeting, New.
Drought Management in Lao PDR Department of Water Resources (DWR) Ministry of Natural Resources and Environment (MONRE) Lao PDR ASEAN Drought Workshop.
1 The 13 th Meeting of the ASEAN Working Group on Water Resources Management (AWGWRM) By: Phousavanh Fongkhamdeng Department of Water Resources, Ministry.
Trade Union Training on employment policies with a focus on youth employment 11 July, 2007 Turin, Italy.
Adaptation in Mozambique. Vulnerable sectors Agriculture Agriculture Water Water Health Health Infrastructure Infrastructure Ecosystems Ecosystems Tourism.
MAINSTREAMING CCA Into Development Policy and Planning in Vietnam: Current Status, opportunities and challenges Asia Pacific Adaptation Forum 2011 Bangkok,
Seminar on the role of ecosystems as water suppliers CONCLUSIONS AND RECOMMENDATIONS.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
The Mekong River Commission Presented by Mr. Detsada Soukhaseum, Mekong River Commission Secretariat, 16 November 2015.
Opportunities and Challenges of Water Resources Management in Lao PDR
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
DISASTER RISK MITIGATION IN MALDIVES MAJOR WAIS WAHEED TRAINING AND COORDINATING OFFICER NDMC/MALDIVES Regional Conference: Hazards of Nature, Risks and.
GEF-Assisted Integrated Ecosystem Management Project In The Trans- Boundary Areas Between Nigeria and Niger Republic.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
The Mekong River Commission: Challenges, Mission, and Strategies.
Group Work IWRM Integrated River Basin Management.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
6Standards for the planning, design and construction of ports and terminals OBJECTIVE: To ensure that Ports and Terminals are planned, designed and constructed.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Mekong River Basin Transboundary Waters Management: Innovative Tools for Collaborative Decision-making World Water Forum March 21, 2009.
From developing to implementing a National Action Plan for Adaptation in Tunisia Lessons Learnt Supported by:
The Mekong River Commission: Challenges, Mission, and Strategies.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Outcomes of the Namibia Water investment Conference Mr Abraham Nehemia Under Secretary for Water Affairs and Forestry 14 September 2012 Ministry of Agriculture,
A Presentation to the Kenya Water Towers, Forests and Green Economy National Dialogue; By: Eng. Philip J. Olum CEO- Water Resources Management Authority.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Project Debriefing Debriefing meeting on the implementation status of two ADB- JFPR funded projects: (i) Technical Assistance Strengthening Coordination.
Cooperation between Government Authorities and Agencies to Achieve the Sustainable Development Goals by the Republic of Belarus Yelena Kukharevich National.
Preliminary theory of change for the South China Sea Project Cluster
Institutional Strengthening Support
Overview Rationale Context and Linkages Objectives Commitments
Integrated Water Resources Management Nam Ngum River Basin – Pilot Project Lao PDR Nam Ngum River Basin Committee Secretariat & Department of Water Resources.
Viet Nam Water Management Country Status Factsheet
Honduras Water Management Country Status Factsheet
Overview Rationale Context and Linkages Objectives Commitments
Kazakhstan Water Management Country Status Factsheet
Guatemala Water Management Country Status Factsheet
Ghana Water Management Country Status Factsheet
Natural Resources and Environment Vision, Strategy and Action Plan
Presentation transcript:

1 The 2 nd Green Mekong Forum International Conference on “Green Mekong Initiative” Water Resources Management in Lao PDR By: Mr. Phousavanh Fongkhamdeng Department of Water Resources, Ministry of Natural Resources and Environment 21 October 2013, Bangkok, Thailand

Overview- Water Resources in Lao PDR  Lao PDR is located in South-East Asia with Area of 236,800 km2, approx. 6.2 Mil. people;  90% of the country are in Mekong Basin;  Water resources per capita is around 55,000 m 3 per year;  35% of annual flow (or equal 270,000 mil. m 3 ) in Mekong is from Lao tributaries;  The monthly rivers flow by the pattern of rainfall is around 80% during the rainy season and 20% in the dry season.

Geography Mekong Basin Lao PDR Nam Ngum Nam Xong sub-Basins IWRM instruments Mekong IWRM Strategy Mekong IWRM-based BDP National Water Resources Strategy 2020 and Action Plan Nam Ngum IWRM Plan Nam Xong sub-basin plans WatershedsIntegrated Watershed Management Plans (Nam Po) IWRM IN LAO PDR

IWRM Progress & Cooperation in Lao PDR Institutional Aspects: The government is working very constructively to improve the water resources planning and management system in Lao PDR; IWRM responsibility (Ministry of Natural Resources and Environment (MONRE) + 17 PONRE DONRE countrywide); Department of Water Resources is one of 17 Departments in MONRE; Water & Water Resources Law (revising, next month pass GOL Roundtable and expect that end of 2013 pass National Assembly); Water Resources Strategy 2020 (in place, indicated 12 major programmes).

National Water Resource Strategy Institutional Strengthening & Coordination; 2.Legislation, Plans and Implementation; 3.RB and Sub-RBs WR Planning; 4.Groundwater Management; 5.Data & Information Management; 6.Water Allocation; 7.Protection of WQ and Ecosystems; 8.Wetland Management; 9.Flood and Drought Management; 10.WR Risk Mgt. & CC Adaptation; 11.IWRM Financing; 12.Awareness, Participation & Capt. Building. 3

IWRM Progress & Cooperation in Lao PDR (cont.) Technical Aspects: Applied IWRM in RB/sub-basin planning & Mgt. – first 5 basins mentioned in NSEDP & more (Nam Ngum, Nam Theun-Kading, Sebangfai, Sebanghieng, Sekong, Sedone…); National IWRM Support Programme - IWRM Capacity & Awareness Plans, RBM+ IWRM Curriculums Development, IRBM Guidelines, Water Resources Inventory & Modeling, Groundwater Management, Climate Change to Water, etc (implementing); Pilot project on WQ monitoring in RB/sub-basin (Nam Lik, Nam Ting-Nam Chat, Nam Kho, etc & expanding to others) + guidelines development; National IWRM Demonstration Site and training centre in Vangvieng District, Vientiane Province (approx. 8,000 ha, benchmarking, designing); Lao IWRM Financing Study – water use fee, WR fund options, etc. (putting into Presidential Decree on Natural Resources Charges -ongoing) Public-Private-Community IWRM Awareness and Participation.

“Consultation & Public Awareness”

“e.g. River Clean Up Day – Nam Xong”

“e.g. Gender Mainstreaming in IWRM”

Some Challenges  New institutional arrangement & establishment;  Legislations need to improve, IWRM-based plans (still limited understanding of stakeholders-public, private, communities);  Limited capacity of concerned staff on RB planning & management + public awareness & local participation on IWRM;  Lack of efficient & accurate WR data & information;  WR development increased -WQ and ecosystems has been degraded in some areas;  Natural disaster frequently occurred and more severe - floods, drought & CC impact on water countrywide;  Limit financial support & sustainable mechanism;

Milestones )Implement and disseminate the National Water Resource Strategy 2020 (12 programmes); 2)Continue to update and implement WR law + its supported legal documents – decree, regulations, etc; 3)Carry out IWRM-based planning & management in basins including (NN, NT-KD, Sekong, Sebangfai, Sebanghieng, Sedone, Nam Ou) & other tributaries; 4)Create and improve water database & link with RBs & related line agencies; 5)Study and establish WR fund, water use fee/benefit sharing for IWRM and testing its operation;

Milestones (cont.) 6)Implement the capacity development & awareness raising plan on IWRM (plan in placed); 7)Prepare and implement WQ, wetlands and groundwater mgt. plan, profiles and guidelines; 8)Flood and Drought Management; 9)Create demonstration site, training centre on IWRM + awareness + Capacity Development.; 10)Encourage more stakeholders in IWRM incl. hydropower, mining and related issue forums; 11)Promote more investments for conservation and rehabilitation of WR & response to CCA on water (small infrastructure, etc)..

Priority Needs for Cooperation Lao PDR needs to have appropriate management approach, policy suit to Laos context and capacities for IWRM including technical capacity and funding. Participate in regional and global cooperation & exchange in IWRM in all aspects (trainings, exchange, meetings, forums, etc).

Thank You Contact: Mobile: Office Contact: Tel: ; Fax: