KEY CONCEPTS OF MITIGATION BANKING March 27, 2003 US Army Corps of Engineers Jacksonville District.

Slides:



Advertisements
Similar presentations
Stormwater Management Initiative Update. ODOTs Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Advertisements

Compensatory Mitigation Rule: Corps/EPA Notice of Proposed Rulemaking Regulatory Branch U.S. Army Corps of Engineers Office of Wetlands, Oceans and Watersheds.
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Overview of Mitigation Banking Program December 10, 2009 Robert M. Brown, Director Environmental Resource Regulation Department Robert M. Brown, Director.
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
BUILDING STRONG ® Mitigation in a Modern World or 33 CFR 332 and You Presented by Jayson M Hudson To the Texas Association of Environmental Professionals.
Modified Charleston Method (MCM)
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Removing Barriers to Wetland Restoration Facilitating Wetland Restoration Permitting Gildo M. Tori – Ducks Unlimited HOW Conference 2010.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
2014 Federal Farm Bill Overview 3/14/14. Conservation Compliance 2 “Recoupling” federal crop insurance premium support benefits to HEL and wetland conservation.
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
U.S. Department of Transportation Federal Highway Administration SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy.
US Army Corps of Engineers BUILDING STRONG ® Coordinating U.S. Army Corps of Engineers Regulatory Permits with Species Conservation Plans November 16,
Governor’s Executive Order: Supporting and Strengthening the State’s Wetland Policy 6 th Annual Wetlands Conference January 30, 2013 Dave Weirens,
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Okanagan Basin Conservation Programs (SOSCP and OCCP) 80+ organizations (government and non-government) working together to achieve shared conservation.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Defining Responsible Forest Management FSC Forest Certification Standards Defining Responsible Forest Management Version:
Wetland Monitoring and Assessment National Water Quality Monitoring Council Meeting August 20, 2003.
A Common Immigration Policy for Europe Principles, actions and tools June 2008.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
US FOREST SERVICE REGIONAL ROUNDTABLE Planning Rule Revision Photographer: Bill Lea.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Growth Management Legislative Discussion March 20, 2012.
August 2,  404 Assumption Review  Project Schedule Review  Summary of Stakeholder Outreach Meetings  Status of Assumption Effort  Statutory.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Programmatic Regulations PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
WEST EUGENE, OREGON Dedication of the Eastern Gateway and the West Eugene Wetlands Plan.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
US Army Corps of Engineers BUILDING STRONG ® Mitigation and Conservation Bank Approval in Northern California Kate Dadey Chief, CA Delta Branch Sacramento.
Central Florida Coordination Area South Florida, St. Johns River and Southwest Florida Water Management Districts.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Sample Codes of Ethics in Adventure Tourism
European Commission, DG Environment, Nature Unit
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
Proposition 1 Workshop: the Grant Application Process July 2015.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
A Jurisprudential Model for Sustainable Water Resources Governance By Professor D. E. Fisher.
NO NET LOSS of PUBLIC HUNTING LANDS in FLORIDA June 2008 Update.
Overview of Everything You Need to Know About Mitigation.
THE CORPS REGULATORY AUTHORITY
Executive Order – The Basics
Michigan Dept. of Environmental Quality Water Resources Division
Wetland Mitigation.
Joint Army-EPA Mitigation Rule
Updating the Article 6 guide Outline of envisaged changes
Proposed Mitigation Rule Amendment Rulemaking Pre-Proposal State and Local Government Outreach June 20, 2019.
Presentation transcript:

KEY CONCEPTS OF MITIGATION BANKING March 27, 2003 US Army Corps of Engineers Jacksonville District

OVERVIEW What is mitigation banking? History of mitigation banking Federal Guidance MBRT Green Book Fundamental requirements of mitigation banks Mitigation Service Area Credit Assessment Benefits/goals of mitigation banking Mitigation banks in Florida US Army Corps of Engineers Jacksonville District

Mitigation Banking Mitigation banking – wetland restoration, creation, enhancement, and preservation for the purpose of compensating for unavoidable wetland losses in advance of development actions when such compensation cannot be achieved on site or would not be as environmentally beneficial. US Army Corps of Engineers Jacksonville District

History Concept of mitigation banking has been around since the 80’s when Corps recognized onsite mitigation was not effective. Banks at that time were public for usually linear projects. EPA disagreed with Corps’ concept and promoted onsite mitigation. US Army Corps of Engineers Jacksonville District

History Mitigation MOA 1990 August 23, the Clinton Administration released package on improvements to Federal wetlands programs including support for the use of mitigation banks. Subsequently, the Corps and the EPA issued interim guidance clarifying the role of mitigation banks (RGL 93-2). US Army Corps of Engineers Jacksonville District

Federal Guidance November 28, 1995 – The Feds jointly issued Federal Guidance for the Establishment, Use and Operation of Mitigation Banks. The Guidance was provided to encourage the effective use of mitigation banks as a means of compensating for the authorized loss of wetlands and other aquatic resources. US Army Corps of Engineers Jacksonville District

Federal Guidance A key point of the Federal Guidance is that proposed mitigation banks should be evaluated by an interagency Mitigation Bank Review Team (MBRT). Banker submits a Prospectus which includes objectives and need for the bank, initiates review by appropriate agencies, and establishes bank goals. US Army Corps of Engineers Jacksonville District

Federal Guidance Federal recognition of a mitigation bank is through a mitigation banking instrument (MBI). MBI describes physical and legal characteristics of the bank. The MBI is signed by the federal MBRT members and the banker. Signature indicates concurrence on the objectives and administration of the bank. US Army Corps of Engineers Jacksonville District

MBRT Federal Representatives (e.g Corps, FWS, NMFS, NRCS, EPA) State Representatives (e.g. DEP, WMD, FWC) Tribal Representatives Local Representatives US Army Corps of Engineers Jacksonville District

MBRT Corps serves as Chair. NRCS serves as Chair if purpose of bank is for complying with FSA. If bank satisfies requirements of another program, the administering agency serves as co- Chair. US Army Corps of Engineers Jacksonville District

MBRT’s Role Facilitate the establishment of mitigation banks through development of the MBI. Signatory to the MBI. Oversees the establishment, use, and operation of the bank. Goal is to obtain consensus. US Army Corps of Engineers Jacksonville District

If no consensus is reached within a reasonable time, the Chair makes final decisions regarding the terms and conditions of the MBI. MBRT’s Goal US Army Corps of Engineers Jacksonville District

Reviewed 119 wetland fill projects over a 6 month period. 34 percent of proposed mitigation had not been constructed. The rate of noncompliance was 93 percent. The rate of actual success and the likelihood of success combined was 27 percent FDER Study US Army Corps of Engineers Jacksonville District

February 1994 – DEP and WMD’s issued rules for wetland mitigation banking. State recognition of a bank is through a Mitigation Bank Permit. US Army Corps of Engineers Jacksonville District As a follow-up to the 1991 Study…

State/Federal MBRT Process for Florida “Green Book” Serves to implement the Federal Guidance. Requirement of Federal guidelines but not of the State statute or rules. Streamlines the evaluation process and reduces redundancy between Federal and State reviews. Prevents significant time and cost expenditures. Maximizes interagency coordination. Does not preclude need for Corps construction permit or guarantee issuance of a State permit.

GREEN BOOK CONTENTS: 1997/1998 Fundamental requirements of mitigation banks MBRT process/flow chart Prospectus guidelines Mitigation Service Areas Calculating credits & credit release Various appendices including Federal Guidance, Florida Statutes, and outline of a MBI

Fundamental Requirements of Mitigation Banks  Improve the ecological conditions of the regional watershed  Provide viable and sustainable ecological and hydrological functions for the mitigation service area  Will be effectively managed in perpetuity  Will not destroy areas with high ecological value  Will achieve mitigation success

Fundamental Requirements of Mitigation Banks  Will be adjacent to lands that will not harm the viability of the mitigation bank due to unsuitable land uses or conditions  Will operate in accordance with State and Federal law  Applicant can legally and financially ensure perpetual management of the land  Can meet the financial responsibility requirements prescribed for mitigation banks

Mitigation Service Area (MSA) The designated area that a bank can reasonably be expected to provide appropriate compensation for unavoidable, authorized impacts. The MSA should be based on hydrologic and ecological criteria. US Army Corps of Engineers Jacksonville District

of the South Florida Water Hydrologic drainage basins Management District

RequestedSuggested

Credit Assessment The ecological benefits attributable to the banker’s effort are quantified using a wetland functional assessment technique. The delta is multiplied by the acreage to give the number of mitigation “credits.” Once the bank is authorized, these credits are available for purchase by a developer to fulfill their obligation in accordance with the 404(b)(1) Guidelines. US Army Corps of Engineers Jacksonville District

Credit Assessment WRAP EWRAP MWRAP WATER (Wetland Assessment Technique for Environmental Reviews) FUWMAM US Army Corps of Engineers Jacksonville District

Cost of Credits – determined by banker Loxahatchee Mitigation Bank $57,500/herbaceous & $67,500/forested Bluefield Ranch Mitigation Bank $40,000/1 agency & $55,000/both Everglades Mitigation Bank $46,000/freshwater & $75,000/estuarine

Credit Release Schedule 10% released up front10% released up front Second release following constructionSecond release following construction Remaining credits released upon attainment of success criteria which should be tied to the functional assessmentRemaining credits released upon attainment of success criteria which should be tied to the functional assessment US Army Corps of Engineers Jacksonville District

 Adjacent to protected land / corridor  Large in size  High likelihood of success  Protects rare and unique habitats  Historically appropriate  Reference wetlands to evaluate success  Provides full suite of wetland functions and values What makes a good mitigation bank? US Army Corps of Engineers Jacksonville District

Benefits of Mitigation Banking  Consolidation of several small, fragmented mitigation projects into one large, strategically located site (inherent benefits to wide-ranging species)  Increased likelihood of mitigation success  Temporal loss is minimized since the mitigation is successful in advance of wetland impact US Army Corps of Engineers Jacksonville District

Goal of Mitigation Banking To provide economically efficient and flexible mitigation opportunities while fully compensating for wetland and other aquatic resource losses in a manner that contributes to long-term ecological functioning of the watershed. US Army Corps of Engineers Jacksonville District

Questions? US Army Corps of Engineers Jacksonville District Details on this topic are found in the Joint State/Federal Mitigation Bank Review Team Process, Operational Draft, October 1998

THANK YOU US Army Corps of Engineers Jacksonville District