Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area Phil Waller, P.E.

Slides:



Advertisements
Similar presentations
w-fn005 1 Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008.
Advertisements

This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Moving to the Next Level of Water Use Efficiency in Florida Janet G. Llewellyn, Director Division of Water Resource Management Florida Department of Environmental.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Michele Robertson, PG Is Deep Injection a Disposal Option in Arizona? GATEKEEPER REGULATORY ROUNDUP 2011 February 16, 2011.
Water Quality Credit Trading Florida League of Cities 2013 Annual Meeting.
© 2009 Malcolm Pirnie, Inc. All Rights Reserved An Assessment of Aquifer Storage and Recovery in Texas 66 th Annual Convention Texas Water Conservation.
© 2009 Malcolm Pirnie, Inc. All Rights Reserved The State of Aquifer Storage Recovery in Texas Texas Innovative Water 2010 Advancing the Development of.
Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Shell and Prairie Creek Watershed Management Plan – Reasonable Assurance Documentation And Agricultural Reservoirs Southwest Florida Water Management District.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
Presented by Ralf Topper, CPG 30 th Colorado Water Workshop July 28, 2005.
Effective Use Of Peracetic Acid to Reduce Effluent Disinfection Byproduct in Water Resource Recovery Facilities Isaiah Shapiro, EIT Dimitri Katehis PhD,
Making the Linkage Between Water Management & Planning Rita P. Maguire, President and CEO ACMA 2006 Summer Conference July 27, Tucson, AZ.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 Recycled Water Program for the City of Los Angeles.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Feasibility of Aquifer Storage and Recovery in the Upper Colorado River Basin Presented by: Western Water & Land, Inc. Grand Junction, Colorado.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption Hearing May 19, B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption.
Application CPA (Large Scale Map and Text Amendment): A request initiated by Alachua County to amend Conservation and Open Space Element as follows:
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
AQUIFER VULNERABILITY ASSESSMENT: PROJECT REVIEW COLUMBIA COUNTY June 11, 2009 Columbia County, Florida Advanced GeoSpatial Inc. Alan Baker, P.G. James.
How do 210 Water Reuse Authorizations relate to O&G Development? Jaya Zyman-Ponebshek, P.E. Assistant Director Water Quality Division.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Approaching Water Sustainability through Water/Wastewater Reductions William Fifty and Laura Lokey-Flippo USACHPPM - Surface Water and Wastewater Program.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Seacoast Utility Authority Water Use Permit Steven Memberg, Section Leader Water Use Regulation Division, Water Supply Department January 26, 2009.
Reuse of Treated water for Aquifer Recharge in the East Snake River Plain Eric Collins, R.G. GSI Water Solutions, Inc. May 1, 2008 Waste.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
Board of County Commissioners October 14, 2008 Vinzant Landing Swallet Santa Fe River.
Dan Pennington Florida Department of Economic Opportunity Division of Community Development.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
1 GE-Sw011 Southern Regional Wastewater Treatment Plant Ocean Outfall Rule Change Pilot Testing Plan of Study Development Monday, February 13, 2012.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
The Future of Sustainable Water Initiatives in North Carolina PENC Engineering Leadership Conference Tuesday, December 2, 2013 Donald L. Safrit, P.E.,
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
Development and Application of a Groundwater-Flow Model of the Atlantic Coastal Plain aquifers, Aiken County, South Carolina to Support Water Resource.
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Florida and Reclaimed Water
Reuse and Wastewater Disposal
CP-TXT Water Supply Facilities Work Plan Amendment
City of Sunrise Wastewater Reuse Program
July 1, 2019 City of Sunrise Floridan Aquifer Test Program Searching for Sustainable Water Quality and Yield Imagine the result.
CENTRAL FLORIDA POTABLE REUSE TEST PROJECTS .
August 30, 2019 Robert Beltran, PE , BCEE
Presentation transcript:

Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area Phil Waller, P.E.

Project Overview – SWUCA and MIA

Project Scope of Work Technical Memorandum 1- Hydrogeology, Water Quality and Permitting –Previous Project Review –Regulatory Review –Reclaimed Water Quality –Hydrogeology and Aquifer Water Quality –Indirect Aquifer Recharge Feasibility Mapping – Permitted Groundwater Users –Aquifer Contamination Site Review –Evaluate Indirect Recharge Technology Issues –Evaluate Direct Recharge Technology Issues

Project Scope of Work TM 2- Water Level Improvements/Impacts –SWFWMD Rule Summary –Direct Recharge Groundwater Modeling –Indirect Recharge Groundwater Modeling TM 3- Economic Analyses Final Report

Project Schedule

Summary of Similar Projects 75 reclaimed water recharge projects were identified globally Projects were identified by: –Reclaimed water as recharge source water –Groundwater credits or exchange –Wastewater treatment processes –Ultimate recharge purpose Groundwater level mitigation Groundwater replacement Salinity barriers Long term storage Indirect potable reuse

Summary of 16 Relevant Projects Indirect Recharge Projects Water Conserv II RIBs - Orange County and the City of Orlando Old Winter Garden Road South WRF RIBs - Orange County Utilities Beardsley Road and Butler Drive WRF RIBs - City of Peoria, AZ Tucson Sweetwater Wetlands and RIBs - Tucson Water, AZ Oak Hill Estates RIBs - Polk County Utilities Lake Marden Recharge Project w/wetland - Orange County Utilities Project RENEW Irrigation – Orlando Utilities Commission Wetlands-Based Water Reclamation Project - City of West Palm Beach Orlando Easterly Wetlands - City of Orlando Green Cay Wetlands - Palm Beach County Water Utilities Department

Summary of 16 Relevant Projects Combined Indirect and Direct Recharge Projects Arrowhead Ranch Recharge Facility ASR System, Vadose wells, and RIBs - City of Glendale, AZ GW Replenishment District RIBs and Salinity Barrier - Orange Co Water District, CA Direct Recharge Projects Kanapaha WRF Injection Well - Gainesville Regional Utilities, FL West Basin Reclamation Project Salinity Barrier - West Basin Municipal Water District, CA Hueco Bolson Recharge Project Recharge Wells - El Paso Water Utilities, TX Bolivar Reclaimed Water ASR System - Adelaide Water Works, South Australia

Conclusions Derived from Projects Florida - Reclaimed water has been used for groundwater exchange: –SJRWMD and SFWMD have approved projects for permitted groundwater exchanges –Level of treatment predominantly is secondary treatment with filtration and high level disinfection –Providing reuse water for irrigation to minimize surficial aquifer pumping for irrigation –RIBs that recharge the surficial aquifer to offset future surficial aquifer withdrawal impacts –RIBs that recharge the surficial aquifer to restore/mitigate wetlands from Floridan withdrawals –Wetland recharge where excess wetland sheetflow water can be used for surface water supply augmentation

Conclusions Derived from Projects Arizona Groundwater Recharge –Arizona Water Banking Authority established in 1980 to restore basin groundwater supply with Colorado River surface water and reclaimed water –Deep unconfined aquifer and recharged reclaimed water undergoes Soil Aquifer Treatment –Reclaimed water meets reuse and AWT standards –RIBs, Vadose wells, wetlands, and injection wells are used –Wetland restoration and treatment –Groundwater recharge for intentional recovery by drinking water wells –Long term storage credits to be used for withdrawal during drought conditions

Conclusions Derived from Projects California Groundwater Recharge –Colorado River is a major component of water imported to Southern California. River allocations are being reduced due to low river flows. –California uses reclaimed water for salinity barriers and aquifer recharge for water supply well withdrawal (Groundwater Replenishment Project, West Basin Reclamation Project) –RIBs and injection wells are used –Reclaimed water meets Full treatment standards Membranes (multiple barriers) UV disinfection AOP (hydrogen peroxide) –Groundwater recharge for intentional recovery by drinking water wells. –Recharged water retention time is a minimum of 6 months before being captured by drinking water wells

Applicable Aquifer Recharge Regulations 62-4, FAC – Permits 62-40, FAC – Water Resource Implementation Rule , FAC – Ground Water Classes, Standards, and Exemptions , FAC – Wellhead Protection Rule , FAC – Groundwater Permitting and Monitoring Requirements , FAC – Underground Injection Control , FAC – Water Well Permitting and Construction Requirements , FAC – Drinking Water Standards, Monitoring, and Reporting , FAC – Domestic Wastewater Facilities , FAC – Domestic Wastewater Treatment Plant Monitoring , FAC – Reuse of Reclaimed Water and Land Application , FAC – Wetlands Application , FAC – Wastewater Facility and Activities Permitting , FAC – Generic Permits – (2)(b), FAC – Generic Permit for Rapid Infiltration Basins

Groundwater Recharge Treatment and Disinfection Requirements Type of Recharge System Required Treatment LevelComments and Applicable Rules Injection to G-II in the Floridan aquifer or Biscayne aquifer (<500 mg/L TDS) Secondary treatment & filtration TOC: The lesser of 5 mg/L average or background; 9 mg/L max TOX: 0.2 mg/L average, 0.3 mg/L max. TN: 10 mg/L (average) Drinking water standards and HLD Multiple barriers (for organics & pathogens) Mutagenicity testing approved by FDEP. Activated carbon adsorption or approved alternative. Full scale operational testing for 2 years. Approved standby disposal or storage facilities. Additional pollutant reduction for parameters reasonably expected to pose a risk to public health due to acute or chronic toxicity (Rule (3)(b), FAC). Rule (3), FAC. Rule , FAC at a minimum. Possible pilot testing reductions are outlined in Rule (5), FAC. ERC will hold a public meeting following pilot testing or full scale operational testing. Full-scale operational testing complete and national expert review before any permit is issued. Injection to G-I, F- I, G-II (<3000 mg/L TDS) Secondary treatment & filtration TOC: 3 mg/L average, 5 mg/L max. TOX: 0.2 mg/L average, 0.3 mg/L max. TN: 10 mg/L (average) Drinking water standards and HLD Multiple barriers (for organics & pathogens) Pilot testing for 1 year. Additional pollutant reduction for parameters reasonably expected to pose a risk to public health due to acute or chronic toxicity (Rule (3)(b), FAC). Alternate TOC and TOX limits can be obtained if all public supply wells within 1 mile are owned by applicant, and other users are prohibited or have RO treatment in place (Rule (3), FAC). Possible pilot testing reductions are outlined in Rule (5), FAC.

Groundwater Recharge Treatment and Disinfection Requirements (continued) Type of Recharge System Required Treatment LevelComments and Applicable Rules ASR using G-I, F-I, G-II (<3000 mg/L TDS) Secondary treatment & filtration TOC: 3 mg/L average, 5 mg/L max. TOX: 0.2 mg/L average, 0.3 mg/L max. TN: 10 mg/L average DWSs and HLD Multiple barriers (for organics & pathogens) Lesser standards (principal treatment; see >3000 mg/L below) if applicant can demonstrate that the groundwater is between 1,000 and 3,000 mg/L, not currently used as a source of public water supply and is not reasonably expected to serve as a future source of public water supply. Secondary DWSs, TN limit, and HLD fecal coliform standards shall not apply in this case. (Rule (9), FAC). Recovered water must demonstrate standards for BOD5 (20 mg/L), TSS (5 mg/L), and FC (absence). Injection for salinity Barriers (G-II having TDS mg/L & not used for potable purposes) Secondary treatment & filtration Primary DWSs and drinking water disinfection ZOD for secondary DWSs TN: 10 mg/L average) 1000 ft. setback from potable supply wells Treatment requirements are consistent with injection to G-II having TDS > 3000 mg/L.

Groundwater Recharge Treatment and Disinfection Requirements (continued) Type of Recharge System Required Treatment LevelComments and Applicable Rules Part IV systems (e.g., RIBs) in unfavorable conditions such as highly karstic or over-lying public water supplies Secondary treatment & filtration Primary and secondary DWSs and HLD TN: 10 mg/L average Rule , FAC. Also applies to RIBs with loading rates >9”/day. Projects are considered as reuse for groundwater recharge. Allows ZOD for secondary DWSs with affirmative demonstration (Rule (8)(b), FAC). Discharge to wetlands that percolate to ground water Wetlands discharges are regulated under Chapter , FAC Percolation can be regulated under ground water rules. Chapter , FAC. RIBs and other rapid-rate systems with favorable conditions Secondary treatment (BOD5 and TSS <20 mg/L) Basic disinfection (FC 0.5 mg/L) Nitrate: 12 mg/L (max. as N). Demonstration of <10 mg/L nitrate at edge of ZOD may allow nitrate limit of 12 mg/L to be waived (Rule (1), FAC).

Projects Ranked by Permitting Difficulty Projects ranked from simplest to most complex –Direct recharge or ASR into a G-IV aquifer containing greater than 10,000 mg/L TDS –RIBs located in areas without direct connection to the Floridan aquifer with no potable water supply expected in the underlying aquifer –RIBs located in areas with direct connection to the Floridan aquifer and with potable water supply occurring or expected to occur from underlying aquifers in the project area –ASR completed into an aquifer containing between 3,000 and 10,000 mg/L TDS –ASR completed into an aquifer containing between 1,000 and 3,000 mg/L TDS that are not reasonably considered to be used for public water supply

Projects Ranked by Permitting Difficulty Projects ranked from simplest to most complex (continued) –Direct recharge into an aquifer containing between 3,000 and 10,000 mg/L TDS (e.g., salinity barriers) –ASR in an aquifer containing less than 1,000 mg/L TDS –Direct recharge into an aquifer containing between 500 and 3,000 mg/L TDS –Direct recharge into an aquifer containing less than 500 mg/L TDS More complex permitting projects generally require more stringent water quality standards

SWFWMD Groundwater Permitting Minimum aquifer level in most impacted area of the Southern Water Use Caution Area Net Benefit concept Other regulatory requirements

Level of Treatment from Area Utilities Hillsborough County - Advanced Wastewater Treatment –Falkenburg AWTP –Valrico AWT –South County AWTP City of Tampa - Advanced Wastewater Treatment –Howard F. Curren AWTF City of Plant City- Advanced Wastewater Treatment –Plant City Water Reclamation Facility Polk County - Secondary Treatment –Many WTFs (11 in all) City of Lakeland - Secondary Treatment –Northside WWTP –Glendale WWTP

Direct Recharge Project Areas

Direct Recharge Projects – 40 MGD Coastal Scenario

Direct Recharge Projects – Model Summary Table

Direct Recharge Projects - Withdrawals

Floridan Aquifer Vulnerability Assessment Evidential Theme (data layer) –IAS thickness –Hydraulic head difference (UFA-SAS) –Proximity to karst features –Soil permeability Training points (occurrence) –Wells with WQ data indicative of vulnerability Response Theme (output map) –Model output of relative vulnerability

FAVA Evidential Themes Soil Permeability Proximity to Karst Features Intermediate Aquifer System Thickness SAS-FA Head Difference Model Output = Relative Vulnerability

FAVA Response Theme – Floridan Aquifer An output map of the probability of vulnerability Calculated by estimating the combined weights of the data layers Output theme is displayed in classes of relative vulnerability (one area is more vulnerable than another)

Floridan Aquifer Favorability Assessment

Indirect Recharge Next Steps The Lakeland and Lake Wales Ridges in the north may be sites of interest for indirect recharge. Availability of land will affect the selection of sites. Potential opportunities to use mining lands as recharge sites Conduct groundwater modeling on selected sites

Indirect Recharge Site Selection

Recharge Feasibility Next Steps Technical Memorandum 2 will summarize numerical groundwater modeling of recharge and withdrawal to quantify the net aquifer benefits to the Upper Floridan aquifer. Evaluations will be made to rank the recharge scenarios based on the improvements in water level and the additional withdrawal available to be captured. Technical Memorandum 3 will summarize estimated costs for projects that are identified to have a greater aquifer improvement and additional groundwater availability. Final report summarizing findings on study.

Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area The End Phil Waller, P.E.