Long-Term Leachate Management at the Tom Howe Landfill Site Kaela Roelens Haldimand County MWA Spring Workshop May 2014.

Slides:



Advertisements
Similar presentations
Arsenic/Iron Co-Precipitation and High Rate Filtration in the City of Portage Christopher Barnes, P.E., City of Portage Kendra Gwin, P.E., City of Portage.
Advertisements

Timothy Townsend, PhD, PE Associate Professor
LEACHATE MANAGEMENT AND TREATMENT
TRP Chapter Chapter 6.3 Biological treatment.
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Community Land-Based Wastewater Disposal in Pennsylvania Prepared by: Mr. Brian Oram, PG Wilkes University
Anne Arundel County Department of Public Works
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Herwig Goldemund, Ph.D. Geosyntec Consultants Atlanta Regional Office
Leachate Treatment at Virginia Landfills By: Bob Gardner, PE, BCEE Senior Vice President SWANA Old Dominion Conference Wintergreen, VA August 7, 2014.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Environment Engineering I
Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009.
SESSION: DEICER MANAGEMENT SOLUTIONS Salt Management Research in Virginia Jimmy White, Virginia Center for Transportation Innovation & Research The Virginia.
COLEGIO CRISTIANO AVIVANDO EL FUEGO
On-Site Wastewater Treatment Conventional Systems, Existing Alternatives, and Research Needs Harold W. Walker, P.E., Ph.D. Professor and Director Civil.
Moving Bed Biofilm Reactor MBBR for Nitrification/Denitrification
By: Audella Eid Advisor: Dr. R. Zurayk Constructed Wetlands for Wastewater treatment.
Wastewater Storage Pond Design
On-Site Leachate Management RM of Tache Pilot Study.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates October 14, 2014 West Point Wastewater Treatment Plant, Seattle.
Phytotechnologies for Environmental Restoration and Management Micah Beard, M.S. Shaw Environmental, Inc.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
Attached Growth Biological WW treatment Systems
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
PINEY POINT Water Management Plan FY04/05.
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
SWANA Chapter Conference 2008 West Edmonton Landfill Leachate Treatment Plant By Steve Johnson M.Eng, P.Eng.
Wastewater Treatment Plant Overview Adapted from May 2009 presentation UIUC Researchers: Poust, Somers, Poole.
Land Application Wastewater Systems Provides 2 o Treatment (Biological) Used in combination with pretreatment and primary treatment Often called Natural.
I-70 Greenfield Rest Area Constructed Wetland Wastewater Treatment System Research Project (SPR-2455, SPR-2456, SPR-2487) R. S. Govindaraju, J. E. Alleman,
1 IV. Wastewater Treatment technologies Topic IV. 9. Wastewater Treatment Facilities with Suspended Biomass - Aerated Tanks: Kinds, Structures, Basic Technological.
LAND APPLICATION SYSTEMS
Landfill Processes. Objectives  Describe the physical, chemical, and biological processes occurring in a landfill  Describe leachate quality (Table.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
The values are expressed in mg/L  Biological treatment  To remove the organic matter and nitrogen  involve one or more of the following techniques:
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Adam MP Canfield.
Blackstone River Users Conference September 16, 2011.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
TREATMENT OF A DAIRY FARM WASTEWATER USING A PILOT SCALE UPFLOW ANAEROBIC SLUDGE BLANKET (UASB) PROCESS By Ashveen Deerpaul & Arvinda Kumar RAGEN.
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
TURNING BROWNFIELDS. Definition US EPA 1997 abandoned, idled or under-used industrial and commercial facilities where expansion or redevelopment is complicated.
WASTEWATER LAGOONS POPLAR IRRIGATION EXPERIENCIES FROM HUNGARY Osztoics András, Szabó Anita, Szilágyi Ferenc.
NATURAL WASTEWATER TREATMENT  Pollutant removal by minimal energy utilisation and chemicals  Usage of natural processes (natural resources)  Low cost.
Soroca WWTP Project - Constructed Wetlands as a Locally Appropriate Technology Dr. Konrad Buchauer Soroca, Moldova SOROCA PROJECT LAUNCH WORKSHOP.
Utilities Department Solid Waste Transfer Station Update December 1, 2009.
Environmental Toolbox. Technical Module Introduction.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
Photo Placeholder Bloedel Donovan Park Stormwater Retrofit Alternatives and Analysis May 31 st 2013.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
Oregon Natural Treatment Systems for Wastewater Natural Treatment Systems – A Water Quality Match for Oregon’s Cities and Towns June, 2014 Oregon Department.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Public Information Meeting Wastewater Treatment January 26, 2016.
COMPARISON OF MBBR AND Suspended growth BNR Performance at the HRWTF
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Robert Rice.
Am I Surface Water Scientist ? Specific to Hydrology, water shed, pollution but not limnology Specific to Hydrology, water shed, pollution but not limnology.
WATER MANAGEMENT.
Welcome to the Key Largo Wastewater Treatment Plant.
Low Cost Wastewater Treatment by Biofilm Technologies : Trickling Filter Dr.-Eng. Noama Shareef Senior Wastewater Engineering & lecturer at Al-Balqa’
Attached Growth Biological WW treatment Systems
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Reduction of Accumulated Solids
Natural Wastewater Treatment Systems
Storm Water Storage and Treatment
LAND POLLUTION.
Big Sky Wastewater Facility Plan Update
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

Long-Term Leachate Management at the Tom Howe Landfill Site Kaela Roelens Haldimand County MWA Spring Workshop May 2014

Background Owned by Haldimand County & Norfolk County Location: Part Lots 7&8 Concession 15 Walpole Incoming waste from Haldimand County, Norfolk County, & Mississaugas of the New Credit First Nations. Annual waste tonnage ~35,000 tonnes; anticipated closure: December Current on-site leachate storage: 6 x 57m³ tanks = 342m³. Controlled by SCADA. From average hauled annual leachate volume: 67,000m³ Leachate Quality – ammonia is the key loading parameter in terms of WWTF impact, ~285 mg/L

MWA Spring Workshop May 2014 Managing Leachate On-Site Need: free up WWTF capacity, reduce hauling/ treatment costs, and accommodate leachate treatment post closure. How? Options - 1.Reduce volume of leachate through evapo-infiltration ponds; spray irrigation; poplar tree plantation 2.Manage peak leachate volumes through additional on-site storage tanks; leachate ponds; hauling schedule 3.On-Site treatment through mechanical/ chemical/ biological system; pre-treatment wetland; treatment lagoon; air stripping; breakpoint chlorination

MWA Spring Workshop May 2014 Preferred Approach The following combination of options are explored for use at Tom Howe: 1.On-site pre-treatment Pre-treatment wetland Pre-treatment aerated lagoon (which may be used in combination with wetland) 2.On-site recirculation/irrigation Other alternatives will not reduce overall hauled leachate volumes, or involve treatment systems requiring significant operator control not appropriate at a closed landfill site.

MWA Spring Workshop May 2014 Leachate Pre-Treatment Wetland Sub-surface System: Leachate trickles through a media filter and wetland and is collected in a lagoon Anticipated 50% reduction of influent leachate flow rate Allows for reduction of ammonia loading through biological nitrification to WWTF

MWA Spring Workshop May 2014 Leachate Pre-Treatment Wetland Design based on: Influent flow of 220m³/day Influent ammonia of 285 mg/L *Effluent ammonia target of 50 mg/L Effluent flow target of ~110m³/day Leachate temperature of 5ºC This would result in a wetland with surface area of 6,300m², 1m depth Preliminary construction cost: $1,280,000 Annual O&M costs: $80,000

MWA Spring Workshop May 2014 Leachate Re-Circulation & Poplar Plantation Leachate re-circulation: re-applying collected leachate to the waste fill areas to reduce volume through evaporation, transpiration and infiltration.  Examples include: injection, surface drip application/ irrigation, spray irrigation, surface evapo-infiltration ponds, mix leachate with incoming waste. Leachate percolates through waste which may improve leachate quality overtime by slowly degrading the waste mound. Poplar plantation can be used in combination or alone  Alternate cap; intercept leachate plumes; leachate irrigation plantation.

Leachate Re-Circulation & Poplar Plantation Cont’d Poplar trees – 4,000/hectare or 1.5m spacing Long-term leachate production – ~6,000m³/month Residual leachate uptake L/tree/month # of trees required to manage leachate on-site – 20,000 or 5 hectares of trees Cost to purchase tree & prep ground – ~$120,000 Total Cost of whips and drip irrigation system - $740,000 If combined with pre-treatment wetland, total costs would be reduced to $370,000

Summary Combination of pre-treatment wetland and poplar plantation: TOTAL Construction: $2,140,000 TOTAL Annual O&M: $160,000 Next Steps Pilot project to determine feasibility at Tom Howe Benefits Frees up capacity at WWTF’s Less ammonia loading to the WWTF’s Reduction in hauling/ treatment costs Less truck traffic

MWA Spring Workshop May 2014 Questions? Kaela Roelens – Waste Mgmt Tech. Haldimand County P: Ext E: OR Bruce Gall – UEM Consulting E: