Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project.

Slides:



Advertisements
Similar presentations
Blind Slough Restoration Project Project Sponsors:Clatsop Diking Improvement Company # 7 U.S. Army Corps of Engineers Columbia River Estuary Study Task.
Advertisements

Deep ExperienceLocal Focus Widest Range of TechnologiesBroad Customer BaseGrowth Platform Global Scale SEE goes north of the polar circle Christian Sigmund,
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Grade Control Structures Chris Shrimpton and Jonathan McIntosh CIVE 717 River Mechanics Spring 2012.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Enbridge Northern Gateway Project Marine Mammal Protection Plan June 6, 2013 – WWF Ocean Noise Workshop.
3-Dimensional Views Existing spillway construction.
Lake Mary Jane - C-30 canal on south end looking northwest - Lake Hart in the distance NOTE: to forward these slides, click the Arrow or Page Down buttons.
Elkhorn Slough Tidal Wetland Plan Barb Peichel October 13, 2004 Tidal Wetland Plan Coordinator Elkhorn Slough National Estuarine Research Reserve.
1 Pile Installation Pile installation is as important as design. In this section, two types of methods: a)Installation by Driving b)Installation by Boring.
Sample Crane Letters in the Northern California Ports Attached are samples of the Crane Letter of Operation, or Flow Sheets for each of the Stevedores.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
Finding Your Way in the World
Construction Noise.
Channel Cross-section Methods Purpose/Objective: Channel cross-sections provide useful information on the 3D development and geomorphological changes to.
Basic Civil Engineering-Foundation
FfFfFfFf Pile Positioning Engineering and Construction Division.
USING COLLEGE PROGRAMS OF STUDY TO HELP CHOOSE HIGH SCHOOL COURSES.
Joint Nature Conservation Committee Support Co. Peter Bridgewater Chairman Marcus Yeo Chief Executive Senior Civil Servant Grade 2 Grades and numbers of.
Latitude and Longitude
Europe Review. What do you remember What can you tell me about Southern Europe? What can you tell me about West-Central Europe? What can you.
13 Colonies Webquest Ms. Maneck US History. Welcome! The English Crown Needs Your Help! Your expertise is needed immediately! The Royal Family has commissioned.
Intrusive Igneous Activity Plutons result from the cooling and hardening of magma within the earth Exposed at surface after uplift and erosion Pluton refers.
CURRENT PORT OPENING COMPANY DESIGN. PORT OPENING COMPANY MISSION: PROVIDE SPECIALIZED ENGR SUPPORT IN OPENING, REHABILITATING, MAINTAINING PORT FACILITIES,
Of An Evaluation of Performance Measures for Prefabricated Submerged Concrete Breakwaters: Section 227 Cape May Point, New Jersey Demonstration Project.
Do now 1.If I am traveling at 60 mph for 3 hours, how far can I travel? 2.How much force is needed to lift a 5kg object 8 m? 3.How much power is created.
© 2015 EarthCon Consultants, Inc. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior.
Wisdom G4 Gravity Anomaly Note: NAD 83 CONUS not NAD27 W. USA
CANADA ’ S ECOZONES Grade 9 Academic Geography Class Notes.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
Formation of the American Southwest (including Nevada) Basin and Range Geology.
This week on social media Oct 29 th -Nov 4 th. General stats.
Cloud Contact Center Software Checkpoint Meeting For.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
Ice Age in Wales Michael J. Hambrey Centre for Glaciology, IGES, Aberystwyth University.
Electric Circuit Types Series and Parallel Circuits.
Calendar Item No. 104 California State Lands Commission Adjourned to August 20, 2012 Central Coastal California Seismic Imaging Project R/V Marcus G. Langseth.
Without RR Retention First Grade Second Grade Special Education 98% Successfully Promoted With RR Reading Skills Class Average.
Elkhorn Slough Tidal Restriction and Sediment Deposition 1870s.
Item Th10b (City & County of San Francisco, DPW) 1 No (San Francisco Dept. Public Works) Coastal Commission Hearing July 2011 Agenda.
BUILDING CONSTRUCTION
COFFERDAMS.
PORT OF TACOMA. Request authorization to expand the scope and increase the authorized amount of Contract No , for work associated with the WUT.
Marine Dock Facilities. Marine Dock Facilities Project Experience  Design and inspection of construction of New Oil Docks – Port of CC  Rehabilitation.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
1 Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Europe Geography-Mapping #2. The Land Europe is part of a large landmass called Eurasia.
Concrete Lesson 2: Site Preparation
Using the Globe.
PREPARE BY : ENROLLMENT NO.
SS6G7b Political Regions (Countries)
SKANSKA Backup Water Supply – Lessons Learned
Basics of Magnetism Ch. 1.
EGGW Groundwater Impacts
Marine Mammals. OTARIIDAE FAMILY PHOCIDAE FAMILY.
American History Unit: Review of Civil War Lesson Plan #7: Civil War Map Project Objective SWBT identify Northern and Southern states during the Civil.
Hemispheres, Latitude & Longitude
1. A flow in permeable layer of soil like figure below
Site Based Preconstruction – Enabling Work
Global Map Skills Second Grade Common Assessment
اصول گودبرداری و ایمن سازی
The Mormon Trail.
Name Your State.
LESSON 6-1 Creating a Worksheet
Monterey County Project Report for Measure X Expenditures
This is my sheet And this is my sheet.
Presentation transcript:

Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project

Preparation on the RR tie-in at the southern end of the sill

Completion of the RR tie-in at the southern end of the sill

Work on the RR tie-in at the northern end of the sill, including installation of sheet pile with the vibratory hammer

Installation of sheet pile across Parsons channel with the vibratory hammer

Surveying the sill across the channel before dropping the sheets to grade to grade

Installation of the H piles with the impact hammer

Placing the rock ramp

The marine mammal monitoring post on the west side of the sill