Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood.

Slides:



Advertisements
Similar presentations
Head cuts and Knickpoints Identify, Prevent & Stop Georganne Bowman September 30, 2011.
Advertisements

Characteristics of High Gradient Streams
Treatment of Slaughterhouse Wastewater
Lower Yellowstone River Diversion Dam Project – Phase II - Physical Modeling of the Rock Ramp BRT, COE, MTAO Update Meeting November 4, 2010.
Surface Water Chapter 9.
HATCH, NM, Background Information Village of Hatch Case Study.
Wetland: Functions and Values
Drainage Rights Dr. Matt Helmers Assistant Professor and Extension Agricultural Engineer Department of Agricultural and Biosystems Engineering Iowa State.
Grade Control Structures Chris Shrimpton and Jonathan McIntosh CIVE 717 River Mechanics Spring 2012.
Chapter 13 Worksheets Section 1-4.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
Gravel Mining Ryan Kindt Kristina Lowthian CIVE 717 April 9, 2012 Gualala River, California fly-over, Courtesy: Jamie Hall.
River Systems - Runoff.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Env 247 Overview of Stormwater Management March 1, 2011.
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Design of Open Channels and Culverts
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
Design of Grass Swales Norman W. Garrick
Coastal & Port Engineering Considerations of the Jacksonville Harbor Deepening Study Kevin Bodge, Ph.D., P.E. Port & Coastal Engineer Senior Vice President.
1 Erosion and Sedimentation Processes, Factors and Impacts on the Environment Issued May 2009 Level IA: Fundamentals Seminar Education and Training Certification.
BUILDING YOUR RAIN GARDEN. Garden Location Where does water flow from? Where does water travel or collect? Observe your yard during a rainfall event.
Running Water Day 1.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Formation and Treatment
OPTIMAL STRATEGIES FOR ECOLOGICAL RESTORATION UNDER CLIMATE CHANGE Koel Ghosh, James S. Shortle, and Carl Hershner * Agricultural Economics and Rural Sociology,
Level IB: Advanced Fundamentals Seminar
RIVER PROCESSES Introduction to Watershed Science Merritt College Marc Epstein, Instructor.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Flooding New Orleans, Aug Flooding –Varies with intensity and amount of rainfall –Perhaps the most universally experienced natural hazard Flood.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Unit 10 - Water Part I: Water Supply, Use and Management.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Setback Levees: Hydraulic, Ecologic and Economic Benefits Tony Melone, PhD, PE, CFM 2011 ASFPM National Conference.
Urban Stormwater Retrofit Friendship Park – Winchester, VA K. Choi, K. Davis, and D. Laird Biological Systems Engineering, Virginia Tech Introduction Exposed.
Chapter 7.3 (cont.) surface water Glen Canyon Dam was completed in 1963 designed to generate hydropower and create a reservoir to supply water to Arizona,
Understanding Creeks, Rivers, and Riparian Areas.
© 2015 EarthCon Consultants, Inc. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior.
Streams (Rivers) Sci 6.1. Runoff: H 2 0 that does not sink into ground Most ends up in streams.
Natural vs. Accelerated Soil Erosion Natural geologic erosion has occurred at a relatively slow rate since the earth was formed. Natural erosion produces.
Urban Storm Water Runoff and Inland Lakes: A Tale of Two Cities Jarron D. Hewitt and Martin T. Auer Department of Civil and Environmental Engineering,
Section 13.1 Streams and Rivers
Stream Erosion and Transport
Rivers.
Coos Watershed Association Watershed Restoration Projects.
Lesson 1.5 Pg
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
Expected Long Term Site Evolution of Alameda Creek and former Salt Ponds following Tidal Marsh Restoration Matt Wickland Philip.
Describe the features and characteristics of the Three Gorges Dam.
Basic Hydrology & Hydraulics: DES 601
Transpiration Similar to evaporation, this is the loss of water through plants. – Pores in leaves (stomata) are opened to release oxygen and water vapor.
Natural Riparian Resources Water Landscape & SoilVegetation.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Culler Lake Bathymetry: Potential Changes Following Dredging Spring 2013 Sampling Methods Class: J. Bruland, M. Dybala, N. Gunther, A. Hoffman, J. Jones,
Tim Clark King County Department of Natural Resources Water and Land Resources Division Impacts of Saltwater Intrusion into an Urban Freshwater Lake.
Interpreting a contour map
Bridges Reach analysis Fundamental tool for design
Presentation - Streams
Groundwater Learning objectives
General theory “Water seeks it’s own level”, i.e. if there is a hydraulic connection, total energy will be uniform throughout the fluid “Inverted siphon”
Continuing Authorities Program
Effects of persistent drought on Lake Mead and the Las Vegas Valley
Storm Water Storage and Treatment
Warm-up What are four things that impact INFILTRATION? (the answer is in your notes) After you finish the warm-up put your river basin project in the inbox.
The Work of Streams.
Water Cycle, Groundwater, Aquifers, Caves
Freshwater Systems = <1 % of Earth’s total water!
Presentation transcript:

Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood

Problem Statement Turbidity in Onondaga Creek too high to support species historically present Sediment load to the creek from mudboils has been identified as major contributor to turbidity Turbidity in Onondaga Creek too high to support species historically present Sediment load to the creek from mudboils has been identified as major contributor to turbidity

Goals and Objectives Improve Onondanga Creek to support fish species present upstream of the mudboils – Intercept 100% of sediment load from mudboils. This will protect river ecosystem from ever being affected by mudboil sediments that increase turbidity

Design Constraints Landowner – Honeywell Hydrogeology – Unclear Environmental Energy Cost – Dredging may be required

Potential Solutions (1) One Large Relief Well – Attempt to create mudboil in the existing area to control source of sediment “One Well to Rule them All” Advantages: Control source Easier to design sediment abatement Disadvantages: Unclear if control is possible Low flexibility if other mudboils appear

Potential Solutions (2) Divert Creek around mudboils, Contain mudboils – Build impoundment around entire area – Move creek channel into field adjacent Advantages: Creek avoids sediment loading (never impacted) Mudboils potentially capped by hydraulic head Disadvantages: Expensive May create mudboils down gradient Creek channel may migrate back to mudboil area

Potential Solutions (3) Impoundment around rogue mudboil, Wetland for smaller particle removal, relief wells – Build impoundment around rogue mudboil followed by wetland – Surround impoundment by relief wells – Construct levee to protect creek Advantages: Protects creek from incoming sediment Provides ecological and aesthetic service Flexible design Disadvantages: Storm events could decrease sediment capacity Annual dredging required Large land area required

Design Overview Relief Wells assumed to control flow from mudboils to not exceed 400 gpm Impoundment designed to contain particles > 4 μm Wetland designed to remove smaller particles (< 2 μm) Levee high enough to protect creek from storm events

Relief Well Design Install 4 relief wells surrounding impoundment berm – 5” diameter with screens excluding sand size particles – Installing 1 well next to mudboil can potentially reduce hydraulic head by 15 ft. – Install wells 20 ft. from mudboil vent to prevent intercepting sediment flow in vent

Impoundment Design (1) Dredging is unavoidable – Annual dredging – Design to remove 4 μm particles Settling velocity of 6 x cm/s 38 hr detention design driven by solids dredging annually, not settling time requirements

Impoundment Design (2) 35 meter diameter 6 ft high 3 feet water level design walls are 3 foot wide top, 3:1 slope, 13 ft bottom

Profile View: Impoundment Mudboil cone Drains to Wetlands

Wetland Design (1) Sheet flow over vegetation to remove particles smaller than 2 μm. 155 acres size driven by solids limit to 2 cm/yr depth <1 acre needed for solids removal retention time

Profile View: Wetland 4 % slope

Design Overview

Estimated Cost $45,000 based on $15/cu. yd. – Includes berms for access to impoundment and levee $5 million for bio-swale – Based on estimated cost per acre of $35,000

Other Considerations Problem of source too large to contain Salinity diluted in stream to lower levels – Salinity in relief wells presumed to decrease (drawing from freshwater aquifer) – Not included in treatment goal Snowfall my decrease residence time in winter Do relief wells control flow from mudboils to below historic high flows? – Studies on effects of relief wells on mudboil flow should be done Pilot-scale study on effectiveness of wetland – Vegetation response to sediment over time – Fine particle removal rates Construction should occur in phases – Install relief wells first, allow some time for mudboils to react (1-2 years) – Build levees and impoundment around stabilized mudboils (1-2 years) – Construct wetland, route water from impoundment through wetland (20-year design life)

Summary As designed, sediment load from mudboils intercepted before entering Odondanga Creek – Ecological buffer (wetland) between mudboils and creek should enhance recovery of fish populations – Levee would prevent resuspension and conveyance of sediment to creek during storm events – While dredging required, sediment has astringent qualities that could have market value as a cosmetic product