Upper San Joaquin River Regional Flood Management Plan Regional Flood Protection Now and in the Future Workshop 7: Financial Planning Wednesday April 16.

Slides:



Advertisements
Similar presentations
Watershed Approaches and Community Based Planning
Advertisements

Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
1 Floodplain Management SESSION 25 Rivers as a Legal Battleground Special Districts and Landowners Prepared by Elliott Mittler, Ph.D.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Tracie Billington, P.E. Chief Financial Assistance Branch Department of Water Resources.
1 Rebuilding the System Reducing the Risk California Water Plan – Advisory Committee August 16, 2007.
Western States Energy & Environment Symposium October 27, 2009.
Watershed Management Framework Mission of watershed management –Coordinate and integrate the programs, tools, and resources of multiple stakeholder groups.
What’s next in California's flood future? Finding answers: California Water Management Investment Strategy FEMA Region IX - CHARG Stakeholder Meeting July.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
1 Overview CA Department of Water Resources CCTAG Meeting March 30, 2012.
1 Regional Report San Joaquin River Hydrologic Region.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Burl Carraway. Purpose of Redesign Shape and influence use of forest land on a scale and in a way that optimizes public benefits from trees and forests.
Marin County Watershed Stewardship Plan
NRCS Watershed Rehabilitation
CALFED Finance Planning. Need for Finance Planning Status quo approach to rely so heavily on State bond funds unlikely in the future Existing funding.
Fresno County Water Crisis and Opportunities. The Delta And Our Water Supply In August 2007 the Federal Court ruled that the Delta Smelt was in danger.
California’s Flood Future Recommendations for Managing the State’s Flood Risk National Association of Flood & Stormwater Management Agencies December 10,
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Integrating Water Management Statewide Integrated Water Management (IWM) Gary Bardini, Deputy Director IWM Rijkswaterstaat & California Coordination Kickoff.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
1 The Rise of Regionalism in Water Resources John K. Woodling California Department of Water Resources North Bay Watershed Association Conference April.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Sierra Water Workgroup Water Summit Kings Beach, California June 11, 2013 Barry Hill, Hydrologist Pacific Southwest Region USDA Forest Service.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Watershed Council June 25, DWR Funding and Bay Area IRWMP Project Selection Background Regional Acceptance Process (RAP) Regional Projects North.
1 Status of AC Input from Last Meeting. 2 Overview  Input received on Strategic Planning Elements (Mission, Vision, Guiding Principles) & the 7 Key Content.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Proposition 1 Workshop: the Grant Application Process July 2015.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Terri Wegener, P.E., DWR Briefing for Central Valley Flood Protection Board.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Regionalism in Water Resources Management
California Water Plan Update Advisory Committee Meeting January 20, 2005.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Water Plan Old and New Steve Macaulay, Executive Director.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
picture Renee Purdy, Environmental Program Manager Los Angeles Regional Water Quality Control Board Renee Purdy, Environmental Program Manager Los Angeles.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
Fish Migration Improvement Opportunities in CVFPP Conservation Strategy Planning Areas Department of Water Resources A. Marc Commandatore Senior Environmental.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Integrated Regional Water Management Grant Program Implemented Jointly by Department of Water Resources and State Water Resources Control Board.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Draft Central Valley Flood Protection Plan Investment Strategy
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Agriculture and Land Stewardship Planning
Washington State Infrastructure Financing
California Water Commission
Presentation transcript:

Upper San Joaquin River Regional Flood Management Plan Regional Flood Protection Now and in the Future Workshop 7: Financial Planning Wednesday April 16 th, 2014 Lower San Joaquin Levee District Henry Miller Ave Dos Palos, CA 93620

Workshop Protocols Use Common Conversational Courtesy Humor Is Welcome Be Comfortable Spelling Doesn’t Count Electronics Courtesy Avoid Editorials 2

Agenda Introductions RFMP Status Update LSJLD Finance Merced Stream Group Finance Madera County Finance RFMP Financial Planning 3

Local Agency Flood Management Operations and Maintenance Operations – Coordination with State Flood Operations Center and upstream reservoir operators – Patrols of flood facilities – Stockpiling flood fighting materials – Flood fighting – Control gates Maintenance – Facilities inspections – Levee and structure repairs – Channel stabilization – Vegetation control & removal – Sediment removal – Rodent control 4 RFMP Status Update

RFMP Evaluation Process

Proposed System Improvements 87 proposed system improvements All proposed system improvements must have: – Local sponsor – Willing participants – Flood management nexus Short-term within 5 years (critical fixes) Long-term 5 to 10+ years Develop multi-benefit system improvements to improve funding opportunities

System Improvements List System Improvement List is composed of: – Capital Improvements – O&M Activities – Emergency Management Activities – Integrated Water Management – Studies – Recommended Actions – Conceptual Ideas

System Improvement Projects 87 Potential System Improvement projects identified 58 are short-term projects 29 are long-term projects $821M in system improvements identified – $55M short-term – $766M long-term – 26 projects not defined well enough to develop cost estimates

System Improvement Prioritization 9 Reviewing criteria based on stakeholder comments Score system improvements based on evaluation criteria System improvements sorted based on ranking for: – Public Safety – Environmental Stewardship – Economic Stability – Regional Issues – Overall Total

System Improvement Groupings Organize improvements to provide a menu of options Groupings provide flexibility to: – Mix and match high priority system improvements to create multi-benefit projects and meet funding opportunities – Put together specific reach or geographic options – Put together system improvements that are similar in benefit (levee improvement, invasive species, etc.)

Local Agency Flood Management Operations and Maintenance Operations – Coordination with State Flood Operations Center and upstream reservoir operators – Patrols of flood facilities – Stockpiling flood fighting materials – Flood fighting – Control gates Maintenance – Facilities inspections – Levee and structure repairs – Channel stabilization – Vegetation control & removal – Sediment removal – Rodent control 11 LSJLD Finance

Local Agency Flood Management Operations and Maintenance Operations – Coordination with State Flood Operations Center and upstream reservoir operators – Patrols of flood facilities – Stockpiling flood fighting materials – Flood fighting – Control gates Maintenance – Facilities inspections – Levee and structure repairs – Channel stabilization – Vegetation control & removal – Sediment removal – Rodent control 12 Merced Stream Group Finance

Local Agency Flood Management Operations and Maintenance Operations – Coordination with State Flood Operations Center and upstream reservoir operators – Patrols of flood facilities – Stockpiling flood fighting materials – Flood fighting – Control gates Maintenance – Facilities inspections – Levee and structure repairs – Channel stabilization – Vegetation control & removal – Sediment removal – Rodent control 13 Madera County Finance

Local Agency Flood Management Operations and Maintenance Operations – Coordination with State Flood Operations Center and upstream reservoir operators – Patrols of flood facilities – Stockpiling flood fighting materials – Flood fighting – Control gates Maintenance – Facilities inspections – Levee and structure repairs – Channel stabilization – Vegetation control & removal – Sediment removal – Rodent control 14 Finance Plan

Financial Planning Steps Describe the current financial condition Refine flood management investments Define values to be used to prioritize investments Explore financing mechanisms Evaluate affordability and need for phasing

There are several aspects involved in describing the current financial condition Economic health of the local economy Assessed value of the property in the service area Major commitments already in place – May be maintenance costs for existing infrastructure – Is there capacity to take on more debt?

USACE Funding is expected to be low

DWR funding has been driven by bonds

The RFMP’s help refine the SSIA investments The SSIA would prefer to spend on the tails of the historical investment trend The RFMP’s can indicate their preferences for assistance

RFMP project prioritization needs to reflect local values RFMP’s need to use this opportunity to inform DWR of their highest ranking projects Besides identifying high risk projects, prioritization process should consider multi-benefit projects – Multi-benefit projects bring more financing opportunities into the picture

Traditional financing mechanisms Traditional flood investment financing was primarily USACE funding along with local property assessments SPFC facilities had access to some additional state funds Proposition’s 13, 218, and 26 have severely restricted the ability for local entities to raise money for flood protection

Proposed statewide financing mechanisms being explored State is evaluating a state flood insurance program – Is it advantageous to move from the NFIP? Possible changes to the Proposition 218 restrictions – Should flood protection should be similar to water, sewer, and garbage? The challenge -- “Are new mechanisms trying to generate money from the same rate payers, or(picking apples from the same tree)?

Multi-benefit projects have the advantage of having access to more funding sources There are several programs that fund protection and restoration of habitat (e.g. NRCS) Multi-benefit projects could potentially attract philanthropists There should be a focus on financing mechanisms that are funded, have larger awards, and have reasonable applications

There are several sources available for state and federal financing

Federal Restoration Programs PROGRAMSCOPE Wetland Reserve Program (USDA NRCS) Protection and restoration of wetlands Emergency Wetland Protection – Floodplain Easement Program (USDA NRCS) Protection and restoration of floodplain habitat Environmental Quality Incentives Program (EQIP - USDA NRCS) Restoration of wetland habitat on private lands North American Wetland Conservation Act (NAWCA – USFWS) Protection and restoration of wetlands and riparian habitats Land and Water Conservation Fund (USFWS) Protection, restoration and recreation around rivers and other public lands

Federal Restoration Programs PROGRAMSCOPE Central Valley Project Implementation Act (CVPIA) – Habitat Restoration Program and Conservation Program (USFWS and USBR) Protection and restoration of habitats impacted by the CVP (wetland/riparian, ES, uplands) Anadromous Fish Restoration Program and Anadromous Fish Screen Program (USFWS) Protection and restoration of anadromous fish habitat, screening existing diversions San Joaquin River Restoration Program (USBR, USFWS, NMFS, DWR and CDFW) Actions that contribute to the restoration of native fish population sin the San Joaquin River Endangered Species Act Section 6 Grand Program (USFWS and CDFW) Planning and implementation of actions that recover endangered species

State Restoration Programs PROGRAMSCOPE Habitat Conservation Fund (CA WCB) Protection and Restoration of sensitive habitats in CA California Riparian Habitat Conservation Plan (CA WCB) Protection and Restoration of riparian habitats Inland Wetlands Conservation Program (CA CB) Protection and Restoration of wetland habitats San Joaquin River Conservancy Act (CA WCB) Protection and Restoration of riverside lands within the San Joaquin River Parkway Prop 84 – California Conservation Corps funding (CA CNRA) Conservation activities implemented by the CCC or regional/local corps River Parkways, Urban Greening, Environmental Enhancement and Mitigation Program (CA CNRA) River-related and transportation-related conservation projects and activitie4s Watershed and Environmental Improvement Program (SFPUC) Protection and restoration of riverside lands within the Tuolumne River watershed

FloodSAFE Implementation Programs PROGRAMSCOPE Early Implementation (EIP)Repair and improve urban levees to 200-year level of protection, and repair non-urban levees to 1955/57 standard. Flood Control Subventions (FCP) Cost share with locals toward capital cost of non-SPFC USACE projects construction (acquisition of land, easement, right of way, relocation and disposal) Flood Corridor (FCP)Non-structural flood risk reduction projects containing ecosystem and/or agricultural land conservation components Local Levee Assistance (LLAP)Evaluation of levees and critical repair and improvement of levees USACE/CVFPB ProjectsCost share with USACE on SPFC USACE projects USACE/CVFPB StudiesCost share with USACE on SPFC USACE

FloodSAFE Implementation Programs PROGRAMSCOPE Yuba Feather Flood Protection (YFFPP) Evaluation of levees, design of flood structures, critical repair and improvement of levees within the Yuba Feather River Systems and Colusa Basin Small Community Flood Risk Reduction (SCFRR) Repair small community levees to 100-year level of protection Systemwide Flood Risk Reduction (SWFRR) Implement recommendations of Basin-wide Feasibility Studies Urban Flood Risk Reduction (UFRR) Repair and improve urban levees to 200-year level of protection Flood System Repair Project (FSRP) Evaluate (feasibility), design, and construct repairs of non-urban SPFC Facility (levees, channels, structures, etc.) deficiencies

FloodSAFE Implementation Programs PROGRAMSCOPE Flood ER – DeltaERProvide support for local EAPs, and Fund communications equipment to further interoperability Flood ER – Forecast- Coordinate Operations To further participation of reservoir operators (affecting CV) in the F-CO program, especially in obtaining necessary decision support system tools & equipment and field measuring equipment Flood ER – Statewide ER Grants Provide support for local EAPs or related Flood Preparedness and Response activities

Financing will be evaluated using a scenario approach Costs will be allocated among local, state, and federal entities to assess impacts Scenarios will be based on historical participation, then varied as appropriate

Affordability will be critical to the finance plan Affordability is a function of the region’s capacity to generate revenue for flood management, as well as the ability attract state and federal funding Affordability also is influenced by other competing needs, such as water supply Existing financial commitments should be addressed before new projects are added to the portfolio

Affordability will take into account the impacts of potential project phasing

Finance Plan Summary Finance planning is an iterative process As projects are refined, possible financing sources for that project can be investigated Affordability will dictate the magnitude and phasing of projects

Local Agency Flood Management Operations and Maintenance Operations – Coordination with State Flood Operations Center and upstream reservoir operators – Patrols of flood facilities – Stockpiling flood fighting materials – Flood fighting – Control gates Maintenance – Facilities inspections – Levee and structure repairs – Channel stabilization – Vegetation control & removal – Sediment removal – Rodent control 35 Schedule

Status of RFMP Process RFMPTimeline Document Regional Setting and Identify Flood Management Issues (Land Use, Environmental, O&M, Emergency Management) Summer 2013 Identify Potential Actions/ System Improvements/studiesFall Winter 2014 Develop Prioritization ProcessFall Winter 2014 Prioritization of System ImprovementsSpring 2014 Develop Finance PlanSpring 2014 Finalize RFMPSummer 2014

Questions?