Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

Virginia Department of Conservation and Recreation Adopting a Local Program in Accordance with the Revised Stormwater Regulations Appomattox County February.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Supervision and Administration
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
May 14, 2014 RAMSHORN POND DAM REHABILITATION PUBLIC INFORMATION SESSION PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
NRC LICENSE APPLICATION PROCESS
The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.
2 Lakeside Drive, Pawling NY 12564
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Compensation Easement with the Municipality as a partner.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
Certification Requirements
Module 7: Construction Phase
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
I Have Been Notified That A School in My District Needs an "ESCA"? What Does that Mean? Regional Workshop for Differentiated Accountability New York State.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Gold Ray Dam Removal Today Review RFP process and dates Touch on contract / award issues Review a few key issues as you develop your proposals Provide.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Heath Delzell – Engineering Bureau IDNR Engineering Progress to Date and Timeline for Project Completion Design and Construction Obstacles.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
By: Rick Ayers Yates County Soil & Water Conservation District
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
Department of Port Control Center for Regional Economic Initiatives February Doan Brook Stream Restoration Project Center for Regional Economic.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Planning & Community Development Department Lower Hastings Ranch Moratorium Extension City Council January 25, 2016.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Yampa River Structures Project WSRA grant application 2nd reading June 15, 2011 Prepared by Friends of the Yampa.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Tailings Dam Stability
MENTAL HEALTH CLINIC Siting Process and Analysis.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
Teacher Evaluation Timeline
Mountain Avenue West Recharge Basin Project
Measure A Financial Oversight Committee August 7, 2013
Issaquah-Fall City Road
National Association of State Conservation Agencies
INDOT Storm Water Management
Walker Street Reconstruction Project 25% Design Public Hearing
Measure – V Facilities Update April 8th, 2019
Ward Park Restroom Timeline
Design and Engineering Services
Sacramento Environmental Commission January 2019.
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Presentation transcript:

Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011

Presentation Outline  Introductions – Derek Schipper, P.E. and Greg Hunt GZA GeoEnvironmental, Inc., Norwood, MA  Existing Site Information  Project Background  Summary of Dam Breach Feasibility Study  Proposed Dam Breach Design  Permitting & Construction  Preliminary Cost Estimate  Timeline  Example Project  Questions

Existing Site

Existing Dam Pond / Impoundment Dam Spillway & Low- level Outlet with Culvert through Dam Concrete Core Wall Around Spillway

Dam Information Mahar Regional School Dam:  Dam Size: Small  Hazard Rating: Significant  Condition: Poor  Main Deficiencies:  Growth of trees throughout dam  Erosion on top of dam and near waterline  Embankment seepage

Project Background  1950s: Dam constructed  1960: Dam repaired following spillway damage  2005: New MA Dam Safety Regulations go into effect  2008: DCR Office of Dam Safety (DCR/ODS) ordered that dam be inspected by professional engineer  July 2009: GZA performed Phase I Inspection/ Evaluation of Dam; found dam to be in Poor condition  Sept. 2009: School District ordered by DCR/ODS to repair, breach, or remove dam by March 11, 2011and continue to have dam inspected every 6 months.

Project Background (Cont.)  2009 – present: GZA has performed three 6-month inspections, dam found to be in similar condition  2010: School Committee approves plan to address condition of dam through dam removal/breach  2010: GZA prepares Dam Breach Feasibility Study to evaluate potential dam breach

Dam Breach Feasibility Study GZA Scope of Work:  Extension request from DCR/ODS (11/30/2012 New Date)  Field Work – Site Survey, Wetland Resource Evaluation, Sediment Analysis  Technical Analysis – Hydrologic & Hydraulic Modeling, Conceptual Breach Design  Permitting Investigation – Estimate of project impacts and required local, state, and federal permits  Cost Estimate & Funding Sources – Cost estimate to perform dam breach & potential grants

Existing Site

Proposed Conditions – Conceptual Design Restored Wetland & Upland Vegetation Remove Existing spillway/culvert. Excavated Breach Channel. Partial Removal of Core Wall Restored Gulf Brook Stream Channel

Proposed Conditions – Conceptual Design Restored Gulf Brook Stream Channel Excavated Section of Dam for Breach Channel Concrete Core Wall to Remain Below Ground Stone Erosion Protection Grassed Slopes

Permitting & Construction Environmental Permitting:  Numerous Local, State, and Federal permits required to work in wetland resource areas  Permit process will likely lasts 9 months – 1 year Final Design and Specifications:  Prepare final design plans and specifications suitable for contractor bidding and construction Construction:  Once Final Design is complete and permits are in place, work awarded to Contractor to perform breach work  Construction to take about 4 weeks

Preliminary Cost Estimate Permitting & Final Design Engineering $ 85,000 Construction Work$ 170,000 Construction Contingency (25%)$ 43,000 Construction Engineering (5 weeks)$ 35,000 Total Estimated Cost$ 333,000

Preliminary Timeline  Spring 2011: Submit Environmental Permitting  Summer 2011: Final Engineering Design & Specifications  Spring 2012: Award Construction Contract  Summer 2012: Perform Dam Breach Work  Fall : Revegetation Monitoring & Maintenance by Contractor  Note: Under current timeline, dam breach work must be completed by November 30, 2012, and Six-Month Follow-Up Inspections of Dam must continue until work is completed.

Questions?

Before Dam Breach One Year After Dam Breach Example Project: Champlin Pond Dam Breach

Champlin Upper Pond Dam Removal Construction

From Left Abutment – April, 2005

From Left Abutment – September, 2005

From Left Abutment – November, 2005

From Left Abutment – August, 2006

Mouth of Channel – November, 2005

Mouth of Channel – June, 2006

From Right Abutment – September, 2006

Discussion/ Questions….