Domestic Hot and Cold Water Service

Slides:



Advertisements
Similar presentations
 Established in 1995  Located in Wilmington, NC with a 40,000 Sqft facility.  Specializes in the design and manufacturing of connection solutions. 
Advertisements

WEL COME TO COE RAC SECTOR. MODULE 3 BROAD BASED BASIC TRAINING IN REFRIGERATION & AIR CONDITIONING BBBT-I.
Lesson 17 Working with Copper Tubing. Next Generation Science/Common Core Standards Addressed! n CCSS.ELA Literacy.RST.9 ‐ 10.3 Follow precisely a complex.
HVAC523 Soldering.
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
Agricultural Mechanic and Technology Cluster
1 HVACR316 – Piping Tubing and Piping. 2 Purposes of Tubing and Piping Provides a path for refrigerant to take Provides a means to return oil to the compressor.
Lesson Working with Copper Tubing. Interest Approach n Why is copper tubing only used for water and fuel lines?
Compression Fittings Internal nut type. Compression fittings Rugged and durable. Firm joint using all brass construction For use with plastic and metal.
An Introduction to Commonly Used Plumbing Fittings A presentation by Douglas Webley and Debra Taylor-Croather.
Student Book © 2004 Propane Education & Research CouncilPage Installing Copper Tubing in Distribution Systems Personnel who install copper.
Trade of Plumbing – Phase 2 Module 2 – Unit 6 Module 2: Domestic Hot and Cold Water Service Unit 6 – Soldering Duration – 32 Hours.
TUBING AND PIPING.
Unit 204: Common Plumbing Processes
Trade of Plumbing – Phase 2 Module 2 – Unit 5 Module 2: Domestic Hot and Cold Water Service Unit 5 – Bronze Welding Duration – 30 Hours.
Finally, a compressed air piping system so simple…it’s EZ!
Trade of Plumbing – Phase 2 Module 2 – Unit 12 Module 2: Domestic Hot and Cold Water Services Unit 12 – Above Ground Sanitation Pipework Duration – 18.
External nut type series 43
Unit 205: Cold water systems
Unit 204: Common plumbing processes
For the interconnection of pneumatic components and systems
N Working with Galvanized Pipe. Next Generation Science/Common Core Standards Addressed! n CCSS.ELA Literacy.RST.9 ‐ 10.3 Follow precisely a complex multistep.
Thermal Process and Mild Steel Pipework
Presentation on Installation of a Domestic Cold Water Storage Cistern
Lesson Working with Plastic Pipe. Interest Approach n Why has plastic piping become so popular to use in the construction industry?
Identify typical temperatures for workshop operations, Temperature for Soldering, brazing, braze welding, welding, Hardening, Tempering and forging.
Agricultural Mechanics 1 Kingsburg High School. Identifying Metals  All metals are either ferrous or nonferrous Ferrous metals contain iron(Fe) Nonferrous.
Working with Plastic Pipe
Plumbing Plastic Pipe Plumbing Systems 20091Plumbing.
Unit 7: Tubing And Piping
Copper Pipe Plumbing Systems
Residential Plumbing Where does the water in your home come from and where does it go?
Trade of Plumbing – Phase 2 Module 2 – Unit 7 Module 2: Domestic Hot and Cold Water Services Unit 7 – Sources and Classification of Water Supply Duration.
Residential and Commercial Plumbing Mr. Lemmons Ag Mechanics.
Materials used for Plumbing. Copper Copper pipe is the most popular type of piping used in domestic hot and cold water systems. It is also used in domestic.
NGfL CYMRU GCaD PLUMBING MATERIALS, PIPE BENDING AND PRESSURE TESTING.
Domestic Hot and Cold Water Service
Introduction to Plumbing Date. Bellwork 0 Fill out your KWL sheet about plumbing 0 What do you K now about plumbing? 0 What do you W ant to learn about.
1 1 HVACR316 - Piping Safety and Overview. 2 2 SAFETY Air conditioning system installers and technicians are faced with a number of possible hazards on.
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Trade of Plumbing – Phase 2 Module 2 – Unit 9 Module 2: Domestic Hot and Cold Water Services Unit 9 – Valves and Taps Duration – 11 Hours.
Cutting and Swaging Tubing
Plumbing Tools ˚ Pipe Elbow 45˚ Pipe Elbow Making a 45 degree turn with a pipe.
Unit 35 Plumbing Objective To identify plumbing materials and perform basic plumbing procedures.
Trade of Plumbing – Phase 2 Module 2 – Unit 3 Module 2: Domestic Hot and Cold Water Service Unit 3 – Machine Bending Copper Pipe Duration – 22 Hours.
Copper Pipe Plumbing Systems
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Installing Guttering and Rainwater Systems
SECTION 2 SAFETY, TOOLS AND EQUIPMENT, SHOP PRACTICES UNIT 7: TUBING AND PIPING.
FLUID FLOW FOR CHEMICAL ENGINEERING Dr Mohd Azmier Ahmad Tel: +60 (4) EKC 212 CHAPTER 8 (PART 1) TRANSPORTATION SYSTEM.
From foukeffa.org Written by Dale Conrady Edited by Danell Woolery Plumbing.
Plumbing Unit. Purpose: Transporting liquids safely from one point to another for storage, processing, and direct use Carries fresh water from a source.
Plumbing by Dale Conrady.
Presented by.
Written by Dale Conrady
Plumbing Systems.
Copper Soldering Technique
Outcome 1 Procedures for measuring and bending plumbing tubes Unit 204: Common plumbing processes.
Outcome 1 Procedures for measuring and bending plumbing tubes Unit 204: Common plumbing processes.
Plumbing Unit.
SAFETY, TOOLS AND EQUIPMENT, SHOP PRACTICES
For the interconnection of pneumatic components and systems
Domestic Hot and Cold Water Service
PLUMBING MATERIALS, PIPE BENDING AND PRESSURE TESTING
Module 1: Thermal Process and Mild Steel Pipework
Educational Power Point by D&T Within Schools
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Presentation transcript:

Domestic Hot and Cold Water Service Module 2: Domestic Hot and Cold Water Service Unit 2 – Copper Pipe Jointing – Compression Fittings Duration – 8 Hours

In unit 2 we learn how to: Describe the various jointing methods for copper pipe. Describe the various types of compression fittings for copper pipe. Joint and assemble copper pipework projects using compression fittings.

Key Learning Points RK Copper pipe sizes, grades and applications. P Jointing methods for copper pipe. RK Sk Types and identification of compression fittings. RK Sc Corrosion and protection of copper pipe. RK Sk Tools for copper pipework. RK H Cutting, de-burring, pre-compressing and jointing copper pipe with compressed fittings. Sk Copper pipework assembly. P Communication and planning. Sk Preparation of materials lists. Sk Interpretation of drawings. Sk M Measurements, tolerances. RK Sk Bracketing and levelling copper pipework. P Working independently, good working practice.

Copper Tubing Copper tubing is supplied in three different forms to the plumbing industry, each one suitable for a different application: Light Gauge Tubing Kuterlon Copper Tubing O.D. Copper Tubing LIGHT GAUGE TUBING: Supplied in half hard temper in 6m lengths. Suitable for all above ground hot and cold water services and central heating pipework. Half hard temper means that it normally has to be annealed before bending by spring. Normally jointed by means of non-manipulative compression fittings, capillary soldered fittings and bronze welding. Available in the following sizes, all in m:- 13, 19, 25, 32, 50, 63, 75, 100, 150, etc

KUTERLON COPPER TUBING: Supplied in 18m and 36m coils in dead soft Temper. Suitable for underground mains water pipework applications. Dead soft temper means that it is normally jointed by means of manipulative compression joints. Available in the following sizes, all in mm:- 13, 19, 25, 32, 38, 50. O.D. COPPER TUBING: Supplied in 10m and 30m coils in dead soft temper. Suitable for micro, mini and small central heating applications. Easily bent by hand due to its dead soft temper and small diameter but an external spring is available for making sharp bends and bends in confined spaces. Normally jointed by means of non-manipulative compression fitting and capillary soldered joints. Available in the following sizes, all in mm:-6, 8, 10 and 12 Note: The letters O.D. stand for outside diameter.

Joining Copper Pipes The joining of copper pipes may be carried out using compression, capillary or bronze welding joints. Compression joints fall into two distinct groups: Non-manipulative fittings (Fig 1): require the ends of the pipe to be cut square before being inserted into the fitting. The joint is made watertight by a soft copper or brass compression ring being compressed into the space between the inside of the fitting and the outside of the pipe by means of tightening a nut. Manipulative fittings (Fig 2): require the end of the pipe to be flared or open up with a drift in order that part of the fitting can be inserted into the end of the pipe. It is then secured in that position by tightening a nut onto the body of the fitting. Because this type of fitting cannot pull off the tube, most water authorities insist on their use for copper pipe fixed underground.

Non-manipulative and Manipulative Fittings

Copper Tube Assembly To fit a compression fitting to a copper tube, the tube end must first be cut square with a hacksaw. Any external or internal burrs should be removed with a file. If using a copper pipe cutters, remove the burr with the integral reamer.

The compression nut and ring are fitted over the tube end in that order and the tube is inserted into the fitting, until it reaches the tube stop.

A smear of boss white is applied to the compression ring before the nut is tightened by hand onto the fitting. N.B. Ensure the nut starts on the right thread. The joint is completed by tightening the nut with the correct size spanner.