Bill Bruce 30 June 2010 Appendix B Revisions for Twenty-First Edition of API 1104 Proposed Letter Ballots.

Slides:



Advertisements
Similar presentations
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Advertisements

STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Why Is There Weld Testing? ASM – AWS (NTX) Joint Meeting Michael S. Beaton, PE 17 February, 2011.
API Specification 6A Furnace Calibration Requirements
American Welding Society Nashville Section
AGENDA 1. Qatar Petroleum (QP) Standardization and Standards Development. 2. Qatar Petroleum Efforts in Corporate National, Regional and International.
PHMSA Perspectives Construction Process & Standards
API - WI 2348 Methodology to provide Mechanical Assurance in DCB test
AWS Fundamental Terms and Definitions
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
Gas Transmission Pipelines
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
Sikorsky A United Technologies Company FAA / NASA Workshop, Chicago, IL – August 6-8, 2002 Review of FAA Material Specification Guidelines Document John.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
For the benefit of business and people
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Update Kenneth Y. Lee Engineering & Research Division
"Welder Certification" The purpose of this presentation is to introduce you to the various aspects of welder certification. This is not intended to cover.
New Item API Specification 6A Furnace Calibration Requirements Tim Haeberle 30 June 2011.
Tim Haeberle API SC Winter Meeting
API Standard 6X: Design Calculations for Pressure-Containing Equipment
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
US BASED B31.3 PROCESS PIPING SECTION COMMITTEE, INTERNATIONAL REVIEW GROUP, AND INTERNATIONAL WORKING GROUP BY REX W ENGLE CURRENT VICE CHAIR- ASME B31.3.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Rulemakings. Change in Derating Factor for PA-11 From.32 to.40.
Welding Inspection and Metallurgy
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
Update on the API Work Group Activities on Pipe Markings.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
PIPELINE SPECIFICATIONS
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
Welding Inspection and Metallurgy
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
Bede CIMETRIX Ltd. Hardness testing systems give an economical and fast way to test mechanical properties. Hardness testing can be done for all materials.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
"Welder Certification" Weldertraining.org The purpose of this presentation is to introduce you to the various aspects of welder certification. This is.
WELDING PROCEDURES and WELDERS QUALIFICATION
Supply Chain Management Report for SC 18 January 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Destructive Testing The mechanical testing of weld samples to determine their strength and other characteristics. Performed on test specimens taken from.
New Business – Proposal For Approval of SR3 For Addendum to API 6ACRA
مرکز پژوهش و مهندسی جوش ايران تابع سازمان گسترش و صنایع نوسازی ایران
Updates from SC18 Summer Meeting
PIPELINE SPECIFICATIONS
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Implementing the Transportation/Land Use Connection Program
May 26, 2014 EFFECT OF EXPLOSION CLADDING INDUCED HARDNESS ON SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING RESISTANCE OF INCONEL 625 Outline:
API Standard 6X: API/ASME Design Calculations
API STANDARD 1104 Welding of Pipelines and Related Facilities
Specification on float equipment
Weld Hydrogen Cracking Risk Management Guidance (MAT-1-1)
PRESSURE EQUIPMENT REPAIRS API 510/570 and ASME PCC-2 are both PCCs
Specification on float equipment
API 10 F.
Dennis Harwig and Bill Mohr, EWI
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
CSOEM Materials Advisory Resource Group
PIPELINE SPECIFICATIONS
Gas Transmission Pipelines
Fiber Reinforced Polymer Systems
Presentation transcript:

Bill Bruce 30 June 2010 Appendix B Revisions for Twenty-First Edition of API 1104 Proposed Letter Ballots

© Det Norske Veritas AS. All rights reserved. Appendix B Revisions for 21st Edition of API June Proposed Revisions to Appendix B  Eight letter ballot items pertaining to revisions to Appendix B for Twenty-First Edition of API 1104 are proposed - Seven pertain to various technical issues discussed at New Orleans meeting in January - Eighth letter ballot pertains to incorporating weld deposition repair into Appendix B - Includes MS Word document of Appendix B revised using “Track Changes” and “Insert Comment” features  Proposed ballot items were developed by a working group established at New Orleans meeting  Have since been distributed to Maintenance Welding sub-committee members  No comments were received - Ready for discussion

© Det Norske Veritas AS. All rights reserved. Appendix B Revisions for 21st Edition of API June Proposed Revisions Pertaining to Various Technical Issues  Proposed revisions include: - Clarify the definition of in-service weld as being welds that include fusion into the carrier pipe - Heat input ranges for each layer to be specified for procedures using temper bead - Procedures that rely on tempering and weld deposition sequence should include tolerance for bead spacing to assure tempering - Carbon equivalent for pipe and attachments is an essential variable - For in-service fillet welds, SMYS is not an essential variable - For non-fillet welds, the completed weld should meet or exceed the SMYS of the pipe. - A change in the bead spacing beyond the limits specified in the WPS constitutes an essential variable - Determine the maximum hardness of the coarse grained HAZ of the pipe and attachment - For temper bead procedures, include requirement for welder to demonstrate the ability to make welds within the specified heat input range

© Det Norske Veritas AS. All rights reserved. Appendix B Revisions for 21st Edition of API June Proposed Revisions to Incorporate Weld Deposition Repair  Weld deposition repair is a useful pipeline repair technique for applications where repair by welded full-encirclement sleeves and fiber reinforced composites is difficult or impossible, such as corrosion-caused loss of wall thickness in bend section, elbows, and tees  The use of this technique is addressed in ASME B31.4, ASME B31.8, CSA Z662, and ASME PCC-2  Proposed revisions include: - Procedure and welder qualification - Essential variables - What test welds need to be made - How many test specimens need to be extracted - What tests the specimens should be subjected to - Suggested in-service welding practices for weld deposition repair  Letter ballot consists of MS Word document using “Track Changes” and “Insert Comment” features

© Det Norske Veritas AS. All rights reserved. Appendix B Revisions for 21st Edition of API June Safeguarding life, property and the environment