LEADER Project: Task 5.4 Analysis of Representative DBC Events of the ETDR with CATHARE G. Geffraye, D. Kadri – CEA/Grenoble G. Bandini - ENEA/Bologna.

Slides:



Advertisements
Similar presentations
TRANSIENT EVALUATION OF A GEN-IV LFR DEMONSTRATION PLANT THROUGH A LUMPED-PARAMETER ANALYSIS OF COUPLED KINETICS AND THERMALHYDRAULICS ANALYSIS OF COUPLED.
Advertisements

Idaho National Engineering and Environmental Laboratory SCWR Preliminary Safety Considerations Cliff Davis, Jacopo Buongiorno, INEEL Luca Oriani, Westinghouse.
INRNE-BAS MELCOR Pre -Test Calculation of Boil-off test at Quench facility 11th International QUENCH Workshop Forschungszentrum Karlsruhe (FZK), October.
Relevant Thermal-Hydraulic Aspects in the Design of the RRR A. Doval, C. Mazufri F.P. Moreno Bariloche, Rio Negro, Argentina.
Author: Cliff B. Davis Evaluation of Fluid Conduction and Mixing Within a Subassembly of the Actinide Burner Test Reactor.
Jiří Duspiva Nuclear Research Institute Řež, plc. Nuclear Power and Safety Division Dept. of Reactor Technology 11 th International QUENCH Workshop Karlsruhe,
Safety analysis of supercritical-pressure light-water cooled reactor with water rods Yoshiaki Oka April 2003, GIF SCWR Mtg. at Madison.
Thermal-Hydraulic Transient Analysis of the Missouri University Research Reactor (MURR) TRTR Annual Meeting September 17-20, 2007 Dr. Robert C. Nelson1,
Preliminary T/H Analyses for EFIT-MgO/Pb Reactor Design WP1.5 Progress Meeting KTH / Stockholm, May 22-23, 2007 G. Bandini, P. Meloni, M. Polidori Italian.
EUROTRANS – DM1 RELAP5 Model Evaluation with SIMMER-III Code and Preliminary Transient Analysis for EFIT Reactor WP5.1 Progress Meeting KTH / Stockholm,
LEADER Project: Task 5.4 Analysis of Representative DBC Events of the ETDR with RELAP5 G. Bandini - ENEA/Bologna LEADER 5 th WP5 Meeting JRC-IET, Petten,
HTTF Analyses Using RELAP5-3D Paul D. Bayless RELAP5 International Users Seminar September 2010.
Thermal-Hydraulic Analysis Results of a Seismically-Induced Loss of Coolant Accident Involving Experiment Out-of-Pile Loop Piping at the Idaho.
EUROTRANS WP 1.5 Meeting FZK – Karlsruhe, November 27-28, 2008 FPN-FISNUC / Bologna EUROTRANS – DM1 EFIT Transients Analysis with RELAP5, SIMMER-III and.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Lyon, October Sophie.
EUROTRANS – DM1 Preliminary Transient Analysis for EFIT with RELAP5 and RELAP/PARCS Codes WP5.1 Progress Meeting Empresarios Agrupados - Madrid, November.
EUROTRANS: WP1.5 Technical meeting, Karlsruhe, November 27 – 28, XT-ADS DHR Conceptual Design L. Mansani
“Design and safety analysis of ALFRED”
1 Safety studies for MYRRHA B. Arien, S. Heusdains, H. Aït Abderrahim on behalf of the MYRRHA Team and Support IP-Eurotrans Workshop DM1-WP1.5Brussels,
Forschungszentrum Karlsruhe Technik und Umwelt IRS /FzK W.M.SchikorrEUROTRANS WP1.5 Safety Meeting : Karlsruhe, Nov 27-28, EFIT-Pb Transient Analysis.
Forschungszentrum Karlsruhe Technik und Umwelt IRS /FzK W.M.SchikorrEUROTRANS WP1.5 Safety Meeting : Madrid, Nov XT-ADS Transient Analysis.
WP 1.5 Progress Meeting ENEA – Bologna, Italy, May 28-30, 2008 FPN-FISNUC / Bologna EUROTRANS – DM1 Analysis of EFIT Unprotected Accidental Transients.
Nuclear Fundamentals Part II Harnessing the Power of the Atom.
Investigation into the Viability of a Passively Active Decay Heat Removal System In ALLEGRO Laura Carroll, Graduate Physicist Physics & Licensing Team,
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Argonne National Laboratory 2007 RELAP5 International User’s Seminar
Thermal hydraulic analysis of ALFRED by RELAP5 code & by SIMMER code G. Barone, N. Forgione, A. Pesetti, R. Lo Frano CIRTEN Consorzio Interuniversitario.
Thermal Hydraulic Simulation of a SuperCritical-Water-Cooled Reactor Core Using Flownex F.A.Mngomezulu, P.G.Rousseau, V.Naicker School of Mechanical and.
17th Symposium of AER, Yalta, Crimea, Ukraine, Sept , 2007.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
LEADER, Task 5.5 ETDR Transient Analyses with SPECTRA Code LEADER Project JRC, Petten, February 26, 2013 M.M. Stempniewicz NRG-22694/
Analyses of representative DEC events of the ETDR
1 IAEA INPRO - PGAP Project – 5 th Consultancy Meeting – Vienna (Austria), December, 2011 RELIABILITY ANALYSIS OF 2400 MWTH GAS-COOLED FAST REACTOR.
Department of Mechanical and Nuclear Engineering Reactor Dynamics and Fuel Management Group Comparative Analysis of PWR Core Wide and Hot Channel Calculations.
Development of a RELAP5-3D thermal-hydraulic model for a Gas Cooled Fast Reactor D. Castelliti, C. Parisi, G. M. Galassi, N. Cerullo (San Piero A Grado.
ALFRED and ELFR design overview Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European LFR Industrial Plant.
EUROTRANS – DM1 ENEA Activities on EFIT Safety Analysis ENEA – FIS/NUC Bologna - Italy WP5.1 Progress Meeting Tractebel / Brussels, March 17, 2006 G. Bandini,
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
IAEA Meeting on INPRO Collaborative Project “Performance Assessment of Passive Gaseous Provisions (PGAP)” December, 2011, Vienna A.K. Nayak, PhD.
Safety Analysis Results of the DEC Transients of ALFRED LEADER Lead-cooled European Advanced DEmonstration Reactor G. Bandini (ENEA), E. Bubelis, M. Schikorr.
Safety And Power Multiplication Aspects Of Mirror Fusion-Fission Hybrids K. Noack 1, O. Ågren 1, J. Källne 1, A. Hagnestål 1, V. E. Moiseenko 2 1 Uppsala.
1 Kaspar Kööp, Marti Jeltsov Division of Nuclear Power Safety Royal Institute of Technology (KTH) Stockholm, Sweden LEADER 4 th WP5 MEETING, Karlsruhe.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Simulations of Coupled Core and Steam Generator Dynamics (Contribution to Task 4.4: “Preliminary definition of the Control Architecture” Status Report)
ERMSAR 2012, Cologne March 21 – 23, 2012 ESTIMATION OF THERMAL-HYDRAULIC LOADING FOR VVER-1000 UNDER SEVERE ACCIDENT SCENARIO Barun Chatterjee 1, Deb Mukhopadhyay.
LEADER Project Analysis of Representative DBC Events of the ETDR with RELAP5 and CATHARE Giacomino Bandini - ENEA/Bologna Genevieve Geffraye – CEA/Grenoble.
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
Analysis of Representative DEC Events of the ETDR with RELAP5 LEADER Project: Task 5.5 G. Bandini - ENEA/Bologna LEADER 5 th WP5 Meeting JRC-IET, Petten,
Modeling a Steam Generator (SG)
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
KIT TOWN OFFICE OSTENDORFHAUS Karlsruhe, 21 st November 2012 CIRTEN Consorzio universitario per la ricerca tecnologica nucleare Antonio Cammi, Stefano.
C N S Presentation T E A M B. Malfunction A #1 (Drop of all control rods in CBA)
Institute of Safety Research Member Institution of the Scientific Association Gottfried Wilhelm Leibniz DYN3D/ATHLET AND ANSYS CFX CALCULATIONS OF THE.
ERMSAR 2012, Cologne March 21 – 23, 2012 OECD Benchmark Exercise on the TMI-2 Plant: Analysis of an Alternative Severe Accident Scenario G. Bandini (ENEA),
Italian National Agency for New Technologies, Energy and Environment Advanced Physics Technology Division Via Martiri di Monte Sole 4, Bologna, Italy.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
EUROTRANS – DM1 Preliminary Transient Analysis for EFIT Design WP5.1 Progress Meeting AREVA / Lyon, October 10-11, 2006 G. Bandini, P. Meloni, M. Polidori.
ERMSAR 2012, Cologne March 21 – 23, 2012 ASTEC V2.0 rev 1 Reactor Applications French PWR 900 MWe Accident Sequences Comparison with MAAP4 V. Lombard,
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
(NURETH-16)-Chicago, Illinois
EP4P03 Nuclear Power Plant Systems and Operation
EP4P03 Nuclear Plant Systems and Operation
Cooling down of W7-X coils with/without casing circulation
Analysis of Reactivity Insertion Accidents for the NIST Research Reactor Before and After Fuel Conversion J.S. Baek, A. Cuadra, L-Y. Cheng, A.L. Hanson,
Lesson 24 NATURAL CIRCULATION
Reactor Experiments Instructor: Prof. Kune Y. Suh T/A : Sang Hyuk Yoon
Session Name: Lessons Learned from Mega Projects
R. B. Vilim Argonne National Laboratory
Egyptian Atomic Energy Authority (EAEA), Egypt
Presentation transcript:

LEADER Project: Task 5.4 Analysis of Representative DBC Events of the ETDR with CATHARE G. Geffraye, D. Kadri – CEA/Grenoble G. Bandini - ENEA/Bologna LEADER 5 th WP5 Meeting JRC-IET, Petten, 26 February 2013

2 Outline  CATHARE code for LFRs  CATHARE modelling  Steady-state at EOC  Analysed DBC transients  Transient results  Conclusions

3 CATHARE code for LFRs  The CATHARE code is the result of a joint effort of CEA, EDF, Framatome ANP and IRSN  The CATHARE system code is commonly used for thermal-hydraulic transient analysis and best-estimate safety analysis of light water reactors. The CATHARE V2.5_2/mod5.1 can be also applied for safety analysis of gas-cooled and sodium-cooled fast reactors  The lead-bismuth eutectic (LBE) and lead thermo-physical properties have been recently implemented in the CATHARE code, in the frame of a bilateral collaboration between ENEA and CEA, for the safety analysis of lead-cooled fast reactors  Some validation works have been performed or are in progress at ENEA on the basis of:  The experiments conducted in the Korean LBE-cooled HELIOS loop in the frame of the OECD LACANES benchmark, including a comparison with RELAP5 code;  The experiments carried out in the LBE-cooled NACIE facility of ENEA/Brasimone;  The experiments carried out on the LBE-cooled TALL loop of KTH/Stockholm within the on-going activities of the THINS European project.  The whole core, primary system and secondary system discretization of the ALFRED reactor used in the CATHARE simulation has been harmonized with the one used in the RELAP5 simulation performed by ENEA, in order to better compare the code results  The systematic comparison of CATHARE results with the results of the more validated RELAP5 code, regarding both DBC and DEC transient analysis, has confirmed the good applicability of CATHARE for ALFRED transient simulations

4 ALFRED modelling ALFRED Nodalization scheme with CATHARE Primary circuit 2 Secondary loops (weight 4) 2 IC loops (weight 4) Cold pool modelled by two 1D axial elements

5 Steady-state at EOC ParameterUnitCATHARE Reactor thermal powerMW300 Total primary flowratekg/s25740 Active core flowratekg/s25460 Average FA flowratekg/s148.7 Hottest FA flowratekg/s176.8 Pressure loss through the primary circuitbar1.5 Pressure loss through the corebar1.0 Core inlet lead temperature°C400 Average FA outlet lead temperature°C480 Hottest FA outlet lead temperature°C483 Upper plenum lead temperature°C480 Average pin max clad temperature°C508 Hottest pin max clad temperature°C518 Average pin max fuel temperature°C1635 Hottest pin max fuel temperature°C1985 SG inlet lead temperature°C480 SG outlet lead temperature°C400 Total SG feedwater flowrate (8 SGs)kg/s196.6 SG feedwater temperature°C335 SG steam outlet temperature°C451 SG inlet pressurebar188 SG outlet pressurebar182 Steam line outlet pressurebar180

6 Main events and reactor scram threshold Analysed DBC transients

7 TD-1: Spurious reactor trip (1/2) Total reactivity and feedbacks ASSUMPTIONS:  Reactor scram at t = 0 s  Reactivity insertion of at least 8000 pcm in 1 s  Secondary circuits are available  constant feedwater flowrate  Core power reduced down to decay level at t = 0 s  Power removal by secondary circuits reduces with decreasing primary temperatures Core and MHX powers

8 Core temperatures  Initial temperature gradient on the fuel rod clad is about -8 °C/s  No risk for lead freezing since the feedwater temperature (335 °C) remains above the solidification point of lead (327 °C) TD-1: Spurious reactor trip (2/2) Primary lead temperatures

9 TD-3: Loss of AC power (1/2) Active core flowrate ASSUMPTIONS:  At t = 0 s  Reactor scram, primary pump coastdown, feedwater and turbine trip  At t = 1 s  DHR-1 system activation (4 IC loops  risk of lead freezing) Core temperatures  No initial core flowrate undershoot (lead free levels equalization)  No significant clad temperature peak in the initial phase of the transient

10 TD-3: Loss of AC power (2/2) Core decay, MHX and IC powers Primary lead temperatures  After the initial transient the natural circulation in the primary circuit stabilizes around 2% of nominal value  DHR power (7 MW) exceeds the decay power after about 15 minutes  After 3 hours the minimum lead temperature at MHX outlet is still far enough from the lead solidification point (mixing in the cold pool around MHXs is effective) Active core flowrate

11 TD-7: Loss of primary pumps (1/2) ASSUMPTIONS:  At t = 0 s  All primary pumps coastdown  Reactor scram at t = 3 s on second scram threshold (Hot FA ΔT > 1.2 nominal value)  At t = 4 s  DHR-1 system activation (3 IC loops  maximum temperatures) Active core flowrateCore temperatures  No initial core flowrate undershoot (lead free levels stabilization)  More significant clad temperature peak than in case of LOOP transient due to delayed reactor scram

TD-7: Loss of primary pumps (2/2) Active core flowrate Core decay, MHX and IC powers Primary lead temperatures  After the initial transient the natural circulation in the primary circuit stabilizes around 1.5% of nominal value  DHR power (5 MW) exceeds the decay power after about 45 minutes  No risk of lead freezing at MHX outlet in the short and medium term (mixing in the cold pool around MHXs is effective)

13 TO-1: FW temper. reduction (1/2) ASSUMPTIONS:  Loss of one preheater (FW temperature from 335 °C down to 300 °C in 1 s)  reactor scram at t = 2 s on low FW temperature  At t = 3 s  DHR-1 system activation (4 IC loops) Primary lead temperatures  DT through the core and the MHX reduces quickly down to few degrees  After some fluctuations the primary lead temperatures stabilizes around 425 °C

14 Core decay, MHX and IC powers Primary lead temperatures TO-1: FW temper. reduction (2/2)  No risk of lead freezing in the initial phase of the transient due to prompt reactor scram  After about 15 minutes the DHR power (7 MW) exceeds the decay power  No risk of lead freezing in the sort and medium term (mixing in the cold pool around MHXs is effective)

15 TO-1: FW flowrate +20% Core and MHX powers Primary lead temperatures ASSUMPTIONS:  Feedwater flowrate +20% in 25 s  No significant perturbations on both primary and secondary sides  The system reaches a new steady-state condition in about 10 minutes without exceeding reactor scram set-points  Slight increase in core power (+4%) leads to max fuel temperature increase of 40 °C

16 Maximum core temperatures Transient DescriptionCode SystemMax Temperatures [°C] FuelCladdingCoolant NominalSteady state, peak pin - ENEACATHARE TD-1Spurious reactor tripCATHARE TD-3Loss of AC powerCATHARE TD-7Loss of all primary pumps (PLOF)CATHARE TO-1Reduction of FW temperatureCATHARE TO-4Increase of FW flowrate by 20 %CATHARE

17 Conclusions In all analysed DBC accidental transients the protection system by reactor scram and prompt start-up of the DHR-1 system for core decay heat removal is able to bring the plant in safe conditions in the short and long term. The core temperatures (clad and fuel) always remain well below the safety limits and no significant vessel wall temperature increase is predicted. The time to reach lead freezing at the MHX outlet after start-up of DHR-1 system strongly depends on the assumptions taken on the lead mixing in the cold pool surrounding the MHX that involves the largest part of the primary lead mass inventory. In the CATHARE calculations the cold lead flowing out of the MHX mixes with hotter lead of the cold pool surrounding the MHX, before to move downward into the lower plenum towards the core inlet. Therefore, in the calculations of TD-1, TD-7 and TO-1 transients, the decrease of lead temperature in the primary system is significantly delayed by the coolant mixing in the cold pool, that increases noticeably the effective thermal inertia of the primary system. This cold pool mixing effect (not observed in the analysis with the RELAP5 code by ENEA) mainly explains the large difference between CATHARE and RELAP5 results, regarding the time needed to approach the risk of lead freezing following DHR-1 start-up.