QIBA FDG-PET ROI subgroup Goals Determine current basic ROI capabilities common to all (or large subset of commercial workstations) –Prepare survey –Make.

Slides:



Advertisements
Similar presentations
Designing Data Services for People ICPSR Data Services Preservation Services User Services Collection Services Access Services Four Services.
Advertisements

So, What Happens Now? The Summary and Implementation Reports and Implementation of Initiatives and Outcomes.
Cooperation Framework for Member States under ESS VIP SIMSTAT ESSnet Workshop, Rome Dec Georges Pongas (slides by Mushtaq Hussain)
Congressional Committees. Standing committees Select committees Joint Committees Conference Committees.
Church Council Report October 1, 2012 SEVERNA PARK UNITED METHODIST CHURCH Capital Campaign Planning Activity CommunityNexus Consulting.
TINA G. BUTCHER NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (NIST) WEIGHTS & MEASURES DIVISION (WMD) SEPTEMBER 2011 TALKING FREIGHT SEMINAR Developing.
Introducing the New College Scheme Seevic Performance Appraisal.
Promoting Classroom Use of Public Opinion Data Developed by The Roper Center of the University of Connecticut Public Opinion.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Working Group #3 E9-1-1 Location Accuracy December 16, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
Organizational Design, Diagnosis, and Development Session 11 Organizational Diagnosis, I.
Venture Finance Fall 2002 Slide 1 Class 6 – Class Project PolyTronics and Project Overview © Andrew W. Hannah.
A-16 Portfolio Management Plan Update Adrian Gardner, CIO, NASA Ivan DeLoatch, Executive Director, FGDC OS September 12, 2013 Steering Committee Meeting.
GANTT CHART DecemberJanuary February Week 3Week 4Week 5Week 6Week 7 Week 8 First Discussion : Outline of the research (Introduction, research.
Mailer Barcode Quality Industry Best Practices MTAC November 6, 2002.
1-2 Training of Process FacilitatorsTraining of Coordinators 5-1.
1-2 Training of Process FacilitatorsTraining of Coordinators 4-1.
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
The Institutional Effectiveness Plan An Excellent Way to Convey Evidence of Assessment Ellen M. Boylan, Ph.D. Marywood University NEAIR – 33 rd Annual.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Reuse Standards Dr. Carma McClure Extended Intelligence, Inc. Copyright (c) 1998 by Extended Intelligence, Inc.
FDG-PETCT Technical Committee Subcommittees Progress to Date (summary version) Software Version Tracking – Ling Shao Team: Ling Shao, Mike Casey, Steve.
Training of Process Facilitators Training of Process Facilitators.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Problem Identification
LN on TN MOBILITY MEASURES for DISADVANTAGED YOUTH and YOUNG ADULTS ________________________________________ Task E Developing a proposal for efficient.
Pre Conference Seminars 1 Arc Hydro Development in Florida James Cameron South Florida Water Management District.
Update from ICANN staff on SSR Activities Greg Rattray Tuesday 21 st 2010.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
One Common Voice – One Plan School Improvement Module 2
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
FAO/WHO Codex Training Package – Module 2.2 FAO/WHO CODEX TRAINING PACKAGE SECTION TWO - UNDERSTANDING THE CODEX ORGANIZATION 2.2 What is Codex?
Graduate Assistant compiles raw data for Assessment Committee by survey (where appropriate) and by curricular objective Assessment Committee reviews compilation.
Assessment of Portal Options Presented to: Technology Committee UMS Board of Trustees May 18, 2010.
Tracy Blackmer Peter Kyveryga Advancing Agricultural Performance ® 1 Iowa Soybean Association On-Farm Network®
APEC-TEL Broadband Study TEL03/2009A – status report Bangkok, May 20 th.
Comité de deuda pública Public Debt Committee Strategic Plan Presented by Richard Domingue Office of the Auditor General of Canada.
® MTAC Satisfaction Survey May ® Respondents * 89 Respondents * Primarily MTAC representatives (64%) * Association Executives (24%)
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Organized by UNICEF ___RO and HQ Day, Month, Year.
Community Assessment Training 3- Community Assessment Training 6-1.
Digital Reference Object Subcommittee Goals 1.Build a common reference DICOM test object (digital reference object or DRO) that can be generated by each.
Session A5/B4 Mother Rule Updates 2015 GaPSC Certification and Program Officials Conference December 2, 2015 Julie Beck, Angie Gant, and Penney McRoy.
FEATS Project Zambia: Draft Terms of Reference for Second Phase Research Study A Policy Study of the linkages between Agricultural Productivity and Rural.
1 Summary of the Geospatial Transportation Data Needs for Federal Agencies Meeting Lynda Liptrap, U.S. Census Bureau November 3, 2009.
Status Report #3 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
Project Management Group (PMG) Status Report to the Commercial Mobile Service Alert Advisory Committee September 19, 2007 Jeffery Goldthorp, PMG Leader.
Facilitating UFE step-by-step: a process guide for evaluators Module 4: Steps 8-12 of UFE Checklist.
Turning our Action Plan into Action. Acronyms: FACA – Federal Advisory Committee Act WRDA 1996 – Water Resources Development Act of 1996.
ACTI-OCI working group Optimizing Computing Infrastructure Working Group Status Report Robin Ying Jan 10, 2012.
1 NG9-1-1 Initiative Action Team Conference Call #6 November 1,
Project Operating Guide. Purpose of Projects To advance the mission of the organization To provide value to ICIS Members.
Photos by Susie Fitzhugh Bell Times Analysis Task Force Review, Update and Recommendation Subgroup 5/14/2015.
New Haven, A City of Great Schools MOVING FROM COMPLIANCE TO COHERENCE IN EVALUATION AND DEVELOPMENT: THE IMPACT OF THE E3 PROGRAM NEW HAVEN PUBLIC SCHOOLS.
Supporting & Encouraging the Development of Robust & Proportionate Quality Assurance Systems in all parts of the Youth Service Guidance Documentation Developed.
EMPOWERMENT THROUGH EDUCATION Business Retention and Expansion Task Force Workshop Joe Lucente Assistant Professor and Extension Educator OSU Extension.
Geospatial Line of Business FGDC Steering Committee Meeting October 24, 2007.
Who Are We? A Forum of Stakeholders Who Come together to Develop Science-based Solutions.
2-D Bar Coding Indiana use of 2-D Bar Coding in 1999 filing season with market partners Results positive - utility proven in tax return processing Indiana.
Implementation Strategy July 2002
Planning for end-of-life decisions with your patients
Annex 5: Milestones Action Determine sticker label design / features
Summary of JIP Objective:
به نام خدایی که یاد او، مایه ی آرامش واقعی است.
Overview of WMO Strategic Planning Initiative
Planning for end-of-life decisions with your patients
Digital Reference Object Subcommittee
Compliance procedure under the Protocol on Water and Health
Urban Waste Water Reporting: a common approach!
EDI-Optique Contact lens project EUROM Contact
Microsoft AZ-203 Dumps PDF
Presentation transcript:

QIBA FDG-PET ROI subgroup Goals Determine current basic ROI capabilities common to all (or large subset of commercial workstations) –Prepare survey –Make ROI methodology recommendations for trials Guide workstation vendors in the adaptation of standardized ROI capabilities. Guide workstation vendors in the implementation of more advanced ROI capabilities T. Turkington 2008/3/6

QIBA FDG-PET ROI subgroup Current Status Committee include reps of three scanner vendors, two 3 rd party workstation vendors, and four non-vendors. Survey is being drafted; final draft ready mid-March.

QIBA FDG-PET ROI subgroup Tasks planned Completion of survey Distribution of survey to vendors Collection of survey and summary –Determination of features common to all (or most) platforms Begin discussion of desired new features and determination of optimal ROI techniques for specific applications –CT-based ROI’s –More objective ROI analysis

QIBA FDG-PET ROI subgroup Resources Needed Continued commitment of vendors to process –Scanner manufacturers –3 rd party workstation vendors Occasional head-to-head meeting of ROI group members Facilitation of conference calls, including polling committee members for availability Possible non-disclosure agreement for survey?