Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.

Slides:



Advertisements
Similar presentations
Special Construction.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Building Codes, Zoning Ordinances
Contents: Cover
Carriage house expansion at the Grover Cleveland birthplace
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Division 17 Organizational Model for Technology and Communication Systems prepared by Tom Rauscher Archi-Technology.
Los Alamos NATIONAL LABORATORY 6/25/02, Sheet 1 UniFormat, OmniClass, MasterFormat UNIFORMAT II -- an org system for building “Elements” Elements: foundation;
Testing & Inspection Services - REF March 10,2010 Preproposal Presentation.
MasterFormat™ April 7, 2005 Kevin R. Miller.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
Construction Methods and Materials Equipment Equipment.
MasterFormat™ March 17, 2004 Kevin Miller.
Study of Top 500 Design Firms’ Plans to Adopt MasterFormat™ 2004 Kevin R. Miller, Ph.D. D. Mark Hutchings, Ph.D. Brigham Young University.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Chapter 9. Please read chapter 9.  Please review, know and understand the terms related to fire protection page 284.  Know the Classifications of.
Introduction to Engineering. Engineering (defined) 1.The art of applying scientific and mathematical principles, experience, judgment, and common sense.
Employment Level: 375+ Contract Relationships: 300+ Midwest Operations: 4 States (IA, IL, OK, CO) Sow Inventory: 60,000+ Finish Inventory: 750,000+
Physical Security Chapter 9.
1 CE 303: Introduction to Construction Blueprint Lab.
CONTRACT DOCUMENTS DISCREPANCY IN THE ROYAL COMMISSION BUILDING PROJECTS AT JUBAIL By: AHMAD SAID AE-KHAMIS CEM 520 Presented by Abdul-Mlik M Al-Saeed.
Construction Contract Documents
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Free industrial areas. OJSC Financial-Leasing Company «Electron- Leasing» Enterprise activity: wide range of leasing services, company works in effective.
Construction Document Technology (CDT)
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Construction Specifications Foreman’s Development Series
Construction Unit 5, Lesson 3 Explanation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching and Learning™
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
Division 17/25 Organizational Model for Technology and Communication Systems “What has changed – What has not” James C. Waddell, RCDD Formare Technica,
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Fire Prevention for Construction. Four classes of fires  A, B, C, and D 1a.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
News  /new_england_sending_a_crowd_to_climate_talks/
1 Project Planning Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 4 2 nd Semester 2008/2009 UP Copyrights 2008 Construction.
ET 493 Senior Design Spring 2013 By: Justin Cifreo, Benjamin Gabriel, Nathan Taylor Instructor: Dr. Cris Koutsougeras Advisor: Dr. Junkun Ma Mechanical.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Construction Drawings
Chapter 44 Building Codes and Commercial Design. 2 Links for Chapter 44 Building Codes Design Categories Using the Codes Related Web Sites.
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
1 SPIRIT Silicon Prairie Initiative on Robotics in Information Technology Engineering Disciplines.
Welcome CUTTING TO THE CHASE Identifying opportunities to reduce cost.
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
Once the designer has decided to use and selected the correct Magna 3 pump in a specific application they must communicate these decisions to the contractor.
Construction Unit 5, Lesson 3 Explanation Presentation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
The Federal Green Construction Guide for Specifiers Implementing Your Green Building Goals and Mandates Alison Kinn Bennett US EPA Environmentally Preferable.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
Estimating and Scheduling CEE 492
Agriculture Mechanics as a Profession Mechanics A branch of physics that deals with motion and the action of forces on bodies.
1 JCI 1 1 An engineer is someone who can do for $5,000 what any damn fool can do for $50,000. Anonymous.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
What is MasterFormat?. “MasterFormat is a master list of numbers and subject titles classified by work results or construction practices for organizing.
High Performance? “Greening” “Energy Efficient”
Fall 2017 Update: Physical properties and sinking fund
PROJECT CHRONOLOGY (Refer to Chapter 5).
(Refer to Chapter 2 of the textbook)
What happened to Division 17? and what is CLA?
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Why CSI? Wayne Wheeler, PE, CSI, CDT
Presentation transcript:

Construction Materials MasterFormat Divisions

 A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications Institute  In 2004 expanded from 16 divisions to 50  Used to format specifications in building contracts  Organized into sections which are divided into three parts: general, products, and execution

 Improves communication  Delivers structures according to owner’s needs  Requirements  Timelines  Budgets  Widely adopted across the construction industry

 Division 01 — General Requirements  Division 02 — Site Construction  Division 03 — Concrete  Division 04 — Masonry  Division 05 — Metals  Division 06 — Wood and Plastics  Division 07 — Thermal and Moisture Protection  Division 08 — Doors and Windows

 Division 09 — Finishes  Division 10 — Specialties  Division 11 — Equipment  Division 12 — Furnishings  Division 13 — Special Construction  Division 14 — Conveying Systems  Division 15 — Mechanical  Division 16 — Electrical

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP:  Division 00 — Procurement and Contracting Requirements SPECIFICATIONS GROUP: General Requirements Subgroup  Division 01 — General Requirements Facility Construction Subgroup  Division 02 — Existing Conditions  Division 03 — Concrete  Division 04 — Masonry  Division 05 — Metals  Division 06 — Wood, Plastics, and Composites  Division 07 — Thermal and Moisture Protection

Facility Construction Subgroup  Division 08 — Openings  Division 09 — Finishes  Division 10 — Specialties  Division 11 — Equipment  Division 12 — Furnishings  Division 13 — Special Construction  Division 14 — Conveying Equipment  Division — Reserved for Future Expansion

Facility Services Subgroup:  Division 20 — RESERVED FOR FUTURE EXPANSION  Division 21 — Fire Suppression  Division 22 — Plumbing  Division 23 — Heating Ventilating and Air Conditioning  Division 24 — RESERVED FOR FUTURE EXPANSION  Division 25 — Integrated Automation  Division 26 — Electrical  Division 27 — Communications  Division 28 — Electronic Safety and Security  Division 29 — RESERVED FOR FUTURE EXPANSION

Site and Infrastructure Subgroup:  Division 30 — RESERVED FOR FUTURE EXPANSION  Division 31 — Earthwork  Division 32 — Exterior Improvements  Division 33 — Utilities  Division 34 — Transportation  Division 35 — Waterway and Marine  Division 36 — RESERVED FOR FUTURE EXPANSION  Division 37 — RESERVED FOR FUTURE EXPANSION  Division 38 — RESERVED FOR FUTURE EXPANSION  Division 39 — RESERVED FOR FUTURE EXPANSION

Process Equipment Subgroup:  Division 40 — Process Integration  Division 41 — Material Processing and Handling Equipment  Division 42 — Process Heating, Cooling, and Drying Equipment  Division 43 — Process Gas and Liquid Handling, Purification and Storage Equipment  Division 44 — Pollution Control Equipment  Division 45 — Industry-Specific Manufacturing Equipment  Division 46 — Water and Wastewater Equipment  Division 47 — RESERVED FOR FUTURE EXPANSION  Division 48 — Electrical Power Generation  Division 49 — RESERVED FOR FUTURE EXPANSION