HFIP Regional Ensemble Call Audio = Passcode = 71511# Meeting ID = July 2012
Today’s Agenda Product Update (Mark DeMaria) Display Update (Paula McCaslin) Ensemble Update (Brian Etherton) HFIP Regional Ensemble Call
HFIP Ensemble Product Subgroup Update on Prototype Products Andrea Schumacher / Mark DeMaria July 23, 2012 Conference Call 3
2 Prototype Ensemble Products Planned for Aug. 1, Genesis ensembles from global models T. Marchok lead (GFDL) Development continuing 2.Hybrid dynamical-statistical wind speed probabilities A. Schumacher, M. DeMaria (co-leads) Arrangements made to have ensemble tracks/intensities pushed to CIRA from GFDL Script being developed at CIRA for real time runs Initial coordination to post products on HFIP web page 4
HFIP Ensemble Display Subgroup Update on HFIP Web Page Paula McCaslin July 23, 2012 Conference Call 5
HFIP Ensemble Subgroup Update on Realtime 2012 Ensemble Brian Etherton June 18, 2012 Conference Call 6
Formal work to be an EMC/GSD effort, running on S- JET, for summer 20-member ensemble, ‘basin-scale’ 27km domain Forecast length=120hr at 00Z and 12Z, 9hr at 06Z and 18Z Use GEFS for IC/BC, add on smaller scale perturbations via dynamical downscaling / cycling method Start from EMC scripting set (Zhan Zhang), with GSD modifications to incorporate small scale perturbations Still trying to ‘ensemble-ize’ basinscale scripts. HFIP Regional Ensemble
Meeting summaries/presentations to be located here: Next Call Tentatively scheduled for Monday, August 27th, at 11AM Pacific, Noon Mountain, 1PM Central, 2PM Eastern (Daylight Time) Speakers… likely the three subgroup leads HFIP Regional Ensemble Call