Asset Valuation: Getting value on the road ahead Damien Douglas Senior Asset Management Engineer Opus International Consultants Perth, Western Australia.

Slides:



Advertisements
Similar presentations
COSO I COSO II. Meycor COSO, a Comprehensive Solution for Enterprise Risk Management (ERM)
Advertisements

Accounting for Share-Based Payments
P.Ariyasena Chief Accountant Ministry of Foreign Employment Promotion and Welfare-
Contemporary Issues & Complying with Industry Standards 2006 Asset Accounting & Management Conference David Edgerton FCPA Queensland Audit Office.
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
NODEM - A Tool Endorsed by NAMS Group Low Cost Optimized Decision Making Platform for Asset Management.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value The New standard and guide by CPA Australia.
Presented by, Stephen Mann, CPA/ABV. Accountants Report Balance Sheet Profit and Loss or Income Statement Statements of Cash Flows Notes to Financial.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Debrief and refresher on AASB13 and what.
1 Disclosure & Reporting of Company Financial Statements: Statements of Financial Position & Performance Text : Leo & Hoggett Chap 5 & 6.
FRS 15 Tangible Fixed Assets Valuation. FRS 15 Tangible Fixed Assets Valuation:  Carrying value of TFA: –Fixed Assets may be stated at Historical Cost.
Copyright  2003 McGraw-Hill Australia Pty Ltd PPTs t/a Auditing and Assurance Services in Australia by Gay & Simnett Slides prepared by Roger Simnett.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Will you be reporting equity in your balance sheet in 2005?
Project Financial Statements & Quarterly Reports Feb
Lecture 9 Impacts of financial reporting decisions on individual financial statement users (module 7) & Asset measurement (module 8)
Business Risk and Business Environment Fixed assets are often the large category of assets Because there is typically limited activity in fixed assets.
MEASUREMENT OF LAND ON A COUNTRY’S BALANCE SHEET Jennifer Ribarsky National Accounts Division, OECD 2014 NBS-OECD Workshop 2 – 5 December 2014.
Effectively applying ISO9001:2000 clauses 5 and 8
IT Services
Audit Committee 28 June 2011 Financial Accounts Claire Cook -Assistant Finance Director and Joanne Watts – Head of Finance.
Session 3.11 Risk Identification Presented By: RTI, JAIPUR.
Regional Coordinators Meeting September 28-30, 2009 Washington DC Defining the National Accounts Framework for the ICP.
Chapter 3 Internal Controls.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value The Practicals side of Fair Value Focus.
ACCOUNTING FOR FIXED ASSETS
GODFREY HODGSON HOLMES TARCA
CIS PROSPECTUS GUIDELINES A DR&CF PRESENTATION. COVER PAGE  State Full Name of CIS and country of incorporation  Name of any sub funds covered by Prospectus.
Immovable Assets Unbundling. Purpose The Fixed Asset Register does not function independently of the other financial and management systems. A comprehensive.
Valuation of water resources and water infrastructure assets in Australia 17 th London Group Meeting Stockholm, Sweden September 2011 Peter Comisari,
1 Information Technology (IT) Auditing & Control Instructor: Dr. Princely Ifinedo Cape Breton University (CBU)
Mark Fielding-Pritchard
Measuring and Monitoring Confidence in your RAMM Database Viren Sharma 20 March 2013 Mike Tapper 2013 Road Asset and Information Forum, Wellington.
SRM Free Text Carts SRM_SHO_303 SRM Free Text Carts.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Financial Accounting 4e by Craig Deegan 4–1 Chapter 4 Depreciation of property, plant.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Implications of AASB’s Residual Value.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value 2015 LG Workshops NSW.
FINANCE MODULE. The various subsystems Financial Accounting Investment management Controlling Treasury Enterprise controlling.
Rijkswaterstaat 1 Functional specifications. Rijkswaterstaat 2 Functional specification – methodology When talking about functional requirements it is.
Enterprise Risk Management An Introduction Frank Reynolds, Reynolds, Thorvardson, Ltd.
Introduction to Finance & Accounts A2 Module 4 Marketing, Accounting & Finance.
ROAD CONSTRUCTION COSTS Key Concepts. Types of Main Road Works Routine Maintenance Works are day-to-day running repairs, e.g. Potholes, depressions, crack.
MODULE 5 PLANNING, REPORTING & ACCOUNTABILITY ADB Private Sector Development Initiative Corporate and Financial Governance Training Solomon Islands Dr.
LISA A. KELLER UNIVERSITY OF MASSACHUSETTS AMHERST Statistical Issues in Growth Modeling.
IPSAS I6: INVESTMENT PROPERTY Presented by: Georgina Muchai Date: 19/8/2015 A closer look 1.
Best practice of EU countries in implementation of international standards of accounting and financial reporting in the public sector A French example.
Works and Transport Sector Overview of 2016/17 Grant and Budget Guidelines Ministry of Works and Transport and Uganda Road Fund.
 Overriding Principles  Asset allocation  Cost allocation.
Road Investment Decision Framework
AUDIT EVIDENCE AND FINANCIAL STATEMENT ASSERTIONS 1.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Asset Valuation and Depreciation Implications.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Asset Accounting Update.
2016 CPA CONGRESS.
The fair value standard and its audit impacts
Chapter 9 Impairment of Assets.
Presented by Sheri Carney – The Resource Group
Depreciation of property, plant and equipment
Contractor / Cost Approach to Valuation
PROPOSED METHOD TO CALCULATE ASSET VALUES FOR ROAD STRUCTURES
INTRODUCTION TO THE BRIDGE INSPECTION AND MAINTENANCE SYSTEM (BIM)
Item 14a: Research and Development
COSO I COSO II. Meycor COSO, a Comprehensive Solution for Enterprise Risk Management (ERM)
IAS 40 Investment Property
Performance improvement observations
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Asset Valuation: Getting value on the road ahead Damien Douglas Senior Asset Management Engineer Opus International Consultants Perth, Western Australia

Engineering perspective – I’m an engineer not an accountant! Asset management purposes Valuation links finance and asset management Focus on roads / WA / RAMM module Introduction

Mandatory integrated planning Mandatory fair value Need reasonable asset financial valuations Reporting requirements are affected Importance of valuation

Australian Infrastructure Financial Management Guidelines manual produced by IPWEA up to version coming very soon… Key guidelines

CPA Valuation and Depreciation Guidelines Free download from Key guidelines

IIMM (IPWEA/NAMS asset management bible) AASB Standards (AASB 116, AASB 13 etc) Key guidelines

Road and road-related assets = specialised assets No liquid market, rarely sold etc Specialised public sector assets use the cost approach Depreciated replacement cost method Fair value of road assets

Value at component level Value entire asset class at the same time Consider “network” assets e.g. signs Include all costs to replace Key requirements of DRC

Appropriate methodology Accurate quantities Fair and reasonable cost to replace the asset Understanding / knowledge is key Getting value from a valuation

Operating environment/complexities e.g. traffic management Overheads (both physical labour and on-costs) Include removal/demolition/disposal Typical scale / 50 th percentile / medium trends Unit costs

Don’t use CPI Do use WA road and bridge construction index Index at the component level Using indices for price movement

Four methods: 1.Fixed life by asset group 2.Statistical analysis by subgroup 3.Condition, performance, risk etc 4.Advanced predictive methods e.g. dTIMS Life assessment

Depends on asset class/type definition, but may include: Pavement formation Pavement structure (basecourse, subbase) Pavement surface Surface water channel (incl. kerb) Road drainage Road structures (bridges, retaining walls) Signs Rails Line marking Street lights Traffic facilities (Land under roads) Road assets to include

Include primer seal in pavement value (part of the full cost of doing work to the pavement) Use suitable residual values (what value will remain e.g. pavement material recycled) Value the modern equivalent not an upgraded version of it Road valuation tips

1.Requires understanding of valuation process 2.Requires understanding of RAMM RAMM valuation tips

3.Don’t value on Surface and Pavement tables 4.Do value on the Treatment Length table RAMM valuation tips (2)

5.Understand your data and how you use it (are TLs accurately set up) 6.Ensure data is summarised correctly 7.Check warning/validation reports RAMM valuation tips (3)

8.Run all steps (incl. create TL components) RAMM valuation tips (4)

9.Set up the module to reflect your network 10.Make sure all assets have a standard unit cost applied by the module 11.Check for errors & inconsistencies!! RAMM valuation tips (5)

12.Take “snapshots” and label them well! – e.g. as at 30 June 2013, by Damien Douglas (Opus), run on 15 August – Mark as “complete” and then as “audited” if appropriate – You will be able to compare easily in future 13.Export your configuration – Restore later if something gets modified RAMM valuation tips (6)

14.Export and save all valuation detail e.g. treatment length component detail 15.Use SQL queries if you know how – Link the ‘av_tl_cpnt’ table to treatment lengths – Check that there are the right number of components for the number of treatment lengths – Attach kerb value to treatment lengths – Summarise values to roads RAMM valuation tips (7)

How confident are you in the results? Who is using the results? Highly Reliable (±5%) to Very Uncertain (±40%) Each category (e.g. formation, pavement etc) Confidence ratings

Auditors may require an increased level of independence in future (e.g. peer review) AASB 116 states: “If items […] are stated at revalued amounts, the following must be disclosed […]: (b) whether an independent valuer was involved;” Independent reviews

Questions