1 [4.1]a Criteria for successful consolidation SDOThreshold/Foundation/Launch After/During Formation, Near-Term Comment Summary of discussions Verticals.

Slides:



Advertisements
Similar presentations
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
Advertisements

4.1 [0] Criteria for Successful Consolidation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners.
[Global Initiative for] oneM2M Standardization
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, 2.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All The Internet of Things (IoT) aka Machine 2 Machine (M2M) Bilel Jamoussi Chief, Study Groups Department.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
CURRENT STANDARDIZATION ACTIVITIES – ONEM2M GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_012 Source: ETSI Contact:
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Consolidated M2M standards boost the industry Li Li (Thomas) CCSA(Huawei) Document No: GSC16-PLEN-73.
4.5 [1] Types of M2M Consolidation Gerry Flynn, ATIS Delegation Verizon Communications, Director, Corporate Technology Meeting of Potential M2M Consolidation.
4.7 [5] Structure of M2M Consolidation Brian Daly – Member of ATIS Delegation (AT&T Director, Core Network & Government/Regulatory Standards) Meeting of.
REPORT FROM SESSION #3, CRITICAL COMMUNICATION Jonas Sundborg, ETSI Board Chairman, ETSI GSC-18 Meeting, July 2014, Sophia Antipolis, France Document.
1 SDOVerticals To Approach Overall Initial focus on, but not limited to: eHealth Smart Grid Transportation/Telematics Connected Home/Home Automation ARIB/TTC.
Authors list to be completed.
M2M Global Initiative OneM2M April 24, 2012
Authors list to be completed.
ATIS & TISPAN JOINT MEETING ON NGN Washington D.C., 1 April 2005 MEETING SUMMARY Draft v2 (4 April 2005) Based on Notes from David Boswarthick (ETSI),
Summary of GSC-15 IPR WG Meeting Alan Fan Zhiyong IPR WG Chair DOCUMENT #:GSC15-CL-05 FOR:Presentation SOURCE:Alan Fan Zhiyong, IPR WG Chairperson AGENDA.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
4.2 [3] How to Engage Vertical Participation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners.
Kelly J. Harris SEARCH Deputy Executive Director
GSC-19 Meeting, July 2015, Geneva GSC-18 Summary Report Dirk Weiler, ETSI Document No:GSC-19_002 Source:GSC-18 Chair Contact:Dirk Weiler Agenda Item:1.4.
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
Overview of the 11 th CJK IT Standards Meeting (CJK-11) ARIB, TTC 1 M2M Meeting of Potential Consolidation Partners # March 2012 in Tokyo, Japan.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
PROJECT LIFECYCLE.
4.4 Timeline for M2M Consolidation Susan Miller ATIS Head of Delegation Meeting of Potential M2M Consolidation Partners #2 Washington, D.C. August 17-18,
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Vertical Outreach Program Create story (presentation) – Identify the needs/challenges (beyond telecom- centric viewpoint) – What we are trying to do –
4.6 [2] Stakeholders of M2M Consolidation Brian Daly – Member of ATIS Delegation (AT&T Director, Core Network & Government/Regulatory Standards) Meeting.
M ODULE 6 PART 1: Planning and Stakeholder Management GLOBAL FUND GRANT CONSOLIDATION WORKSHOP DATE.
DOCUMENT #:GSC15-PLEN-82r2 FOR:Presentation SOURCE:ATIS AGENDA ITEM: PLEN 6.14 CONTACT(S): Andrew White ATIS’
4.3 [4] Technical Scope of M2M Consolidation Brian Daly – Member of ATIS Delegation (AT&T Director, Core Network & Government/Regulatory Standards) Meeting.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
1 [4.7]a Structure of M2M Consolidation SDOStructureComment Overall Goals of Structure: Be responsive to the needs of the vertical market stakeholders.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Summary of main questions on the Partnership Agreement and the secretariat support.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
1 Summary of issues and results from GSC-12 IPR WG Dan Bart, TIA Chair IPR WG SOURCE:Dan Bart, IPR WG Chair TITLE:Report of GSC-12 IPR WG AGENDA ITEM:Closing.
05/02/ “Report on general ETSI activities since GSC#8” Karl Heinz Rosenbrock ETSI Director-General GSC-9, Seoul SOURCE:ETSI TITLE:Report on general.
WMM in Confidence oneM2M Ecosystem Accelerator (OEA) Presentation to oneM2M TP meeting Beijing, November 2015 Paul Russell.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
CJK B3G Standards Collaboration Jinsung Choi Ph.D TTA PG301 Chair & Vice-President of LGE, Mobile Communication Technology Research Lab. Telecommunications.
The IEEE-SA Standards Process Dr. Bilel Jamoussi IEEE Standards Education Committee.
Information Sharing for Integrated Care A 5 Step Blueprint.
Telecommunications Industry Association (TIA) ADVANCING GLOBAL COMMUNICATIONS.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Work Plan Work Plan Management (Document 21)
Jeju, 13 – 16 May 2013Standards for Shared ICT oneM2M Project Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman Document No: GSC17-PLEN-38.
31 January Table of Contents (1) 3- Draft Partnership Project Description22- The Partnership Project Agreement (1)3- Draft Partnership Project Description22-
ATIS’ Machine-to-Machine (M2M) Activity
Consolidated M2M standards boost the industry
ETSI Standardization Activities on M2M communications
3GPP Status.
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
Standards for Shared ICT
Attendance GSC-19: 92 delegates
Opening Session Report
CCSA Considerations on M2M Consolidation
ATIS’ Machine-to-Machine (M2M) Activity
Presentation transcript:

1 [4.1]a Criteria for successful consolidation SDOThreshold/Foundation/Launch After/During Formation, Near-Term Comment Summary of discussions Verticals need to be engaged. Significant support and participation across vertical segments, taking into account: At least two vertical market/industry segments At least two global (balance) Prefer to engage market representatives (organizations and/or companies) Rules of engagement with other organizations/fora/consortia Identify and invite list of relevant organizations/fora/consortia for “participation” (AI) : E.g., BBF, OMA, etc. Development of technical scope To be discussed in 4.3 Timeline to launch (including milestones) To be discussed in 4.4 Basic structure (in principle) Funding (cost effective), Organization, IPR, Secretariat, etc. To be discussed in 4.7 High-level information During formation - Engage all relevant organizations/fora/consortia to “participate”: Other key organizations Detailed/Implementation aspects of high-level information Detailed Structure M2MCons02_24r1

SDOThreshold/Foundation/LaunchAfter/During Formation, Near-TermComment ARIB/ TTC Collaboration with many vertical kindsRelationships with other organizations (incl ITU-T) Openness and transparency Effective operation (support by minimum cost) ATIS at least 3 significant verticals* Tech Scope* 1 st activity: analyze Common Svc Layer other SDO/fora willing to share/input Agree on approximate/target timeframe How to work with SDOs (agree on list) Verticals participate in structure forming Agree in principle on major structure item Work to get more verticals to participate/join Determine relationships to government/regulators ID, integrate government/regulator requirement Determine Phase 2 or additional scope Detailed workplan and timeline for initial scope How to work with SDOs (not in mandatory list) Create and execute formal agreement *“Significant Verticals” - prefer they be global - equal participation/rights - balance among industries - ratio of verticals per 01(11)17 - region identifies verticals *“Tech Scope” (access agnostic) - Svc Layer, interop, conformnc CCSA Key verticals engaged (Seoul: 2 or 3)Balance (geographical & verticals) Cost effective End-to-end Fairness Not overlapping other organizations Easy meeting access Assignment to priority categories is TBD. CCSA does not think a clear idea of the “criteria” is set yet. Should verticals be part of the “criteria” discussion (for example in meeting #3)? ETSI Verticals engaged Global approach Time is critical (fast) Cost effective Verticals engaged Global approach Time is critical (fast) Cost effective List from Seoul. Assignment to priority categories is TBD. [4.1]b Criteria for successful consolidation

3 [4.1]c Criteria for successful consolidation SDOThreshold/Foundation/LaunchAfter/During Formation, Near-TermComment TIA Enough industry interest Agreed structure and operation Global participation by telecom SDOs Broad support from multiple verticals Agreed IPR policy, budget, funding, Secrty Agreed relationship to other organization Success criteria 1 – 2 years out - global leader in M2M - specifications are published - standards are published by SDOs - vertical participation - use of standards TTA 2 vertical industries participation* Global approach Agree relationships: international SDOs Agree on relationships: M2M SDOs/fora* 3GPP telecom SDOs to join Tech Scope will be Svc Layer Tech Scope will include terminals aspects Open (voting rights is example) Balance (committee leadership is example) * Which categories? And should they join before or after decision to start consolidation initiative? * OMA, 3GPP as examples