Carmelo Scalone Key success factors for the development of wind energy

Slides:



Advertisements
Similar presentations
© OECD/IEA Deploying Renewables: Principles for Effective Policies Press Conference, OECD Berlin, 29 September 2008 Dr. Paolo Frankl Head, Renewable.
Advertisements

The Single Electricity Market in Ireland
Competition Effects of the Renewable Energy Policy Reform in Flanders: Is the Flemish market for Green Electricity Certificates working properly? Annemie.
©2013 Navigant Consulting, Inc. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Incentive Schemes for Offshore Wind.
March 2009 Emissions Trading in South Africa National Climate Change Summit Emily Tyler.
March 2009 Emissions Trading in South Africa National Climate Change Summit Emily Tyler.
APPLICATION OF THE ERES SUPPORT MECHANISM IN ROMANIA Primary and Secondary Legislation 1.
EWEC 2007 Milano Drs. J.P. Coelingh, senior consultant Wind and power derivatives in project financing.
Exchange A1: The support required to make Energy Performance Contracting a viable energy and carbon solution (TEC) Steve Creighton, Senior Relationship.
To be or not to be in Romania? The perspective of Energy from Renewable Sources - Prague, Nov Konečná & Zacha ● GGI EasyMeet Adrian Achimescu.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
Sustainable Energy Roundtable Series January, 2005 Pfizer Greenhouse Gas Management Program Experience.
Unit 14 The Federal Reserve The Top Five Concepts
Marketing of MicroCHP MicroCHeaP meeting Copenhagen 29 September 2005.
PRME Seminar “Responsible Management of GHG Emissions” Fri 14 October 2011 Gujji Muthuswamy Department of Management Faculty of Business and Economics.
Business Portfolio Adding Value to Investors Luiz Fernando Rolla CFO October, 2008.
© OECD/IEA Opportunities and Challenges in Deploying Renewables into the Mainstream demosEUROPA and Danish Embassy Joint Seminar Warsaw, 19 November.
GreenNet-EU27 Results on WP5: Case studies on RES-E grid integration 1 RES-E Case Study Analyses and Synthesis of Results Dr.-Ing. Derk J. Swider Institute.
Learning from experience? The UK Renewables Obligation Bridget Woodman University of Exeter Cornwall Campus
Macroeconomic Policy and Floating Exchange Rates
Barriers Identification for Wind Power Generation Technology Transfer in China By Li Junfeng Director of Center for Renewable Energy Development January.
A Regulatory Framework for Energy Intensive Industries within the EU Berlin 30 November 2012 Chris Lenon – Green Tax Group BE.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Development of Wind Power in Austria Importance of Regional Initiatives Stefan Hantsch Dr. Ursula Nährer
Development of Wind Power in Austria Importance of Regional Initiatives and Financing Models Stefan Hantsch Dr. Ursula Nährer
Project Planning and Capital Budgeting
WIND ENERGY Is there a Latvian Master Plan? CHRISTIAN KJÆR Chief Executive Officer European Wind Energy Association SSE Riga, 4 December 2008 © EWEA/L.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Technical Due Diligence Renewable Energy We build with Passion!
The German Electricity Market in the European context Bocconi University Karsten Neuhoff German Institute for Economic Research / Technical University.
SDEWES, Dubrovnik, Croatia, 02. October 2009 Tariffs for energy storage -STORIES project workshop- Goran Krajačić, Neven Duić,
R E N E W A B L E E N E R G Y I N S P A I N Kingston, 23 rd June 2008 World Wind Energy Conference Framework of reference and Perspectives for Wind Energy.
Information - CommunicationDirectorate general for Energy and Transport European Commission The situation of the Directive on electricity from renewable.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 9 Renewable Energy Module 9: REGULATORY MEASURES AND POLICY OPTIONS TO ENCOURAGE DEVELOPMENT.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
ETF Conference, Building & Financing European Transport Infrastructure, Brussels, 23rd Oct Building & Financing European Transport Infrastructures.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 16 Energy Efficiency Module 16: REGULATION AND POLICY OPTIONS TO ENCOURAGE ENERGY EFFICIENCY.
Page 1 of 15 Towards Outcome-Based Incentives for Grid-Connected Windpower Energy Conclave 2006 “Implementing the Integrated Energy Policy” IRADe, New.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
1 ELECTRICITY PRICES AND RENEWABLE ENERGY Lucia Passamonti Strategy, Research and Documentation Dept. Italian Regulatory Authority for Electricity and.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
Wind Energy E U R O P E A N W I N D E N E R G Y C O N F E R E N C E & E X H I B I T I O N1 Athens, 1 st March 2006 Wind Energy in Spain Status.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
EDPR Presentation March 2011 Istanbul.
GHSGT Review Economics. Unit 1 – Fundamental Concepts of Economics.
Exchange Rates. An exchange rate is the price of one currency in terms of another. –It indicates how many units of one currency can be bought with a single.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
Prudential Balanced Fund (PRUBF1) November 2011 Fixed information Licensed Date: 5 October 2006 Listing date: 4 December 2006 Base Currency: VND Tenure:
IFIEC ENERGY FORUM Renewable Energy Support Schemes 19 June 2012 BRUSSELS Dr Mukund Bhagwat Corporate Energy Affairs, Aurubis Member of Electricity & Climate.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
Credit Risk transfer OECD-IAIS-ASSAL Fourth Conference on Insurance Regulation and Supervision in Latin America Punta Cana, Dominican Republic, May 6 th.
IFIEC Europe International Federation of Industrial Energy Consumers 1 Promotion of Renewable Energies in the EU Member States Consequences on the Price.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
08/12/2015 Developing renewable energy cost effectively EUROPEAN COMMISSION Tom Howes European Commission.
INVOLAR Microinverters Evaluation of ROI of a 3 kW PV system.
Air Quality Management Comparison of Cap-and-Trade, Command-and Control and Rate-Based Programs Dr. Ruben Deza Senior Environmental Engineer Clean Air.
Investment Analysis Lecture 7 Industry Analysis.
Presentation to Select Committee on Economic Development
Jerker Torngren 4. USO in Serbia Some personal recommendations Jerker Torngren 1.
Systems Analysis Certificates for developing renewables and efficient use of energy By Senior research specialist Poul Erik Morthorst Systems Analyses.
CCS Roadmap People’s Republic of China: The business model for early stage demonstration projects Tony Wood International Team Leader Roadmap for CCS demonstration.
STATE ENERGY REGULATORY COMMISSION (SERC) Prof. Konstantin Shushulov Chairman Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
Moscow, 2015 Special investment contract as a new instrument for the stimulation of the production localization Vasily Osmakov, Director of the Department.
South East Europe Regional Consultation Meeting Bucharest, Romania 6 – 7 October 2016 Session II: Opportunities and Challenges in RE Deployment in the.
Romania’s intervention (5 min)
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
What happened in Portugal’s recent record-breaking solar auctions?
Presentation transcript:

Carmelo Scalone Key success factors for the development of wind energy November, 26th 2009 Budapest Key success factors for the development of wind energy Carmelo Scalone Global Head of New Initiatives EDP Renewables

EDPR is the fourth largest wind company in the world

EDPR is used to operate with different remunerations schemes

Agenda Designing an efficient regulatory system for wind development A success case: the Portuguese way to wind energy Quick overview of the Spanish, French, Belgian, Polish and Romanian support mechanisms

Two main issues to consider when designing a framework for wind energy Policy Design (Financial Support) Overall system to create financial incentives for investors to participate in the development of wind energy Permitting processes Set of different steps to be fulfilled when installing new capacity Main ones are administrative (number of authorities involved, lead time to obtain permits, etc.) and access to grid (existing transparent rules to allocate evacuation capacity and to bear and share investment costs) Focus of this presentation

Green Certificate Systems Financial and Tax Incentives There are four general policy systems to promote wind energy System Description System Description Feed in Tariff Producers of green electricity receive a fixed price (normally set for a period of several years) A variant of the feed-in tariff scheme is the fixed premium scheme in which a premium is paid above normal electricity spot price Main Systems Renewable energy has two revenue streams: conventional power prices from the conventional market Revenues from the sales of green certificate in a secondary market Secondary market is created when government forces a participant in the supply chain (generators, suppliers) to prove that part of its supply has GCs associated to them, thus creating demand for GCs Renewable energy producers supply GCs Price for GCs is set by market supply and demand Green Certificate Systems The State places a series of tenders for the supply of renewable electricity: Selection based on price and other quantitative criteria (scoring system) Electricity supplied on a contract basis at the price resulting from the tender Additional cost typically passed on to end consumer through a specific levy Tendering Secondary Systems Financial and Tax Incentives Reduction or exemption of electricity taxes applied to all producers Investment grants as a reduction of capital and/or total costs due to low interest loans

Feed in tariffs seem the best option when considered pros and cons Advantages Disadvantages Simple and low cost: easy to implement and supervise Reduces regulatory and market risk for investors and loan risk for financial companies A stable investment environment promotes the development of manufacturing Effective in promoting different technologies Risk over/under funding: It can be partially compensated with market monitoring and adjustments Need to adjust tariffs as targets are achieved or market conditions change Feed-in Tariff Increased risk and required return for investors, thus increasing effective costs, due to volatility & uncertainty on future prices Does not encourage technology diversity High administrative costs System may not create enough incentives to invest. Total revenue for RES generator is the sum of pool price and GC price Since companies may avoid buying the GC by paying a penalty, GC price may not rise to a level to make investment profitable In theory if working well, they lead to the best cost solution because it is a market instrument If it works well, targets are exactly met Green Certificates Tax Incentives Easily linked with existing fiscal and financial structures Does not create long-term certainty of investments Risk of over/under funding Long term captaincy about receiving support Bidding price can fall so low that contracts cannot be fully implemented It increases project preparation costs The stop-and-go nature does not conduct to stable conditions Tendering

Green certificate markets are structurally unbalanced leading to a higher risk form of feed-in tariff Key characteristics Market behavior Implications Contrary to other markets both supply and demand are fixed and cannot be adjusted within a year Demand is fixed by the government Supply depends on the plants already operating for that year that typically do not change significantly compared with supply Since Investment process generally takes more than a year no adjustment on supply and demand is possible and market is either in deficit or in excess of Green Certificates If demand is larger than supply (deficit on green certificates) then price would go up to infinite or typically to a penalty price defined by the regulator which is the opportunity cost of each of the buyers If supply is larger than demand then price should go down to zero or a floor already defined The only factor that can affect this situation is the expectation of a change in supply-demand balance if green certificates are bankable Green certificate system ends up being a form of feed-in tariff (price is at the end set up by a regulator) but with higher medium and long term risk Price depends on penalty price and supply/demand balance (both subjected to regulatory changes) Changes on regulatory system and/or market rules affect already built farms, increasing uncertainty

Technical comparison of supporting mechanisms suggests that feed-in tariffs achieve larger deployment at lower costs Effectiveness and efficiency indicators for wind electricity generation Effectiveness (Avg. annual generation growth 1998-2005/Additional potential) FIT TGC Tender Financial/Fiscal incentives Efficiency (Support level/Long term costs) Source: COM(2005) 627 final of 7Dec05

For this reason, successful countries have a form of feed-in tariff Wind capacity installed at the end of 2008 vs. implemented regulatory system 23903 16754 Feed-in Tariff Green certificates Other MW Source: EWEA

Some key lessons can be derived from the portuguese experience Portugal Fragmentation can prevent wind development, specially for a small/not developed countries (in terms of wind energy) The allocation of groups of capacity, together with the development of industrial projects can be an effective tool for those countries

Fragmentation can prevent wind energy development in small countries Portugal Description of the past system in Portugal Allocation of capacity according to requests on a pro-rata basis Capacity allocated to plenty of operators Financial capacity of developers not previously tested Evolution of yearly added wind-power capacity large players developed the sector MW Consolidation period Implications Wind energy sector severely fragmented Plenty of projects not implemented System failed to add new capacity and development slowed down For small countries with low wind capacity development an unstructured process can slow down development “Not controlled” process leads to a fragmented sector with low financial capacity operators Growth only takes place when consolidation happens Source: Emerging Energy; EDPR Analysis

Development of National economy Creation of employment To sort this problem out Portugal decided to allocate two groups of capacity associated to an industrial project Portugal Description Benefits for the country Energy System Clean energy generation Contribution to electricity generation Reduce CO2 emissions Creation of two groups of capacity to be allocated 1200 MW installed capacity (EDP consortium) 400 MW installed capacity (GALP Consortium) Allocated capacity committed operators to develop an Industrial Project Investment Direct investment Attraction to new investors Creation of funds for research & development Results Development of National economy Positive effects on trade balance Contribution to increase the National Product Creation of employment Direct employment generation indirect employment creation Faster market consolidation Minimizing risk of failure on implementation Guaranteed implementation and turbine concentration allowed local industrial development Regional development Contribution to regional development Promotion of underprivileged areas Reduction of regional socio economic differences

Enercon- Industrial Partner The new system brought leading companies to Portugal Participants in the EDP Consortium Portugal Enercon- Industrial Partner Wind Developers A homogeneous consortium holding a vast experience in wind farm development and exploitation Holder of more than 50% of exploited wind power in Portugal Expertise managing all business key factors World leader in high tech wind generator construction 30% of Portuguese Market share Pioneered research and development of wind generator construction Proved Financial capacity Rating A+ More than 460M€ on equity Vast experience implementing wind generator factories International network for wind farm O&M Renewable company of EDP Group 1 250 MW of installed capacity in Iberia 3 000 MW of commissioned projects Belonging to ENDESA Group 1 250 MW of installed capacity in Iberia 1 850 MW to be developed until 2010 480 MW of accumulated capacity Shareholders are mainly non-profit organizations Partnership of SONAE and ENDESA Group Holder of 16 cogeneration plants

The consortium created a large competence center in Portugal… Viana do Castelo Industrial Project Wind generator arms factory Wind generator blades factory Global Surface: 100 000 m2 Indoor surface: 28 108 m2 Administration R&D Training Administration R&D Training Logistics & Transport Services Logistics & Transport Services Electronic Module Factory Electronic Module Factory Wind generator Factory Wind generator Factory

… With Clear Benefits for the country Portugal Minimum annual generation 2700 GWh of clean energy This means 25% of all wind energy generation and 4% of electricity generation between 2010-2012 Electricity supply for more than 2.3 million inhabitants Energy System Investment Direct Investment 1 700 M€ between 2006-2010 Wind Farm development with more than 1 200 MW  1 476 M€ Factory Units and associated services 161 M€ 35 M€ of founding for the National Scientific System Increase on exports: > 60% of generation will be exported Decrease on generator component imports Decrease on raw material imports (more than 100 M€ yearly saved) More than 1 Mt CO2 not emitted every year  24 M€ annually saved Development of National economy Creation of employment 1 800 new long term jobs created in underprivileged areas 5 500 indirect jobs created annually for the first six years Regional development Industrial Project will represent 2.5% of the regional Product Reduction of regional socio economic differences 5 M€ of revenues paid in to municipalities In addition to 3.4 M€ in terms of land rental

Change in remuneration systems had an impact in financial parameters In 2004 a new framework for wind energy remuneration was developed in Spain to introduce predictability and stability Spain Previous system description(1) Change in remuneration systems had an impact in financial parameters Tariff defined yearly only for the next year creating lack of visibility on future revenues No guarantees on whether remuneration system could be changed Conditions in 2003 Today DSCR min. (2) DSCR average (2) Leverage Maximum Amortization period 1,35 1,40 80-85% 13-15 years 1,30-1,25 1,35-1,30 85-90% 15 -18 years New System Description Revenues are fixed for a 20 year period Tariffs for already operating farms are not revised in the event of a change in the remuneration scheme Increased visibility on future revenues System stability 2818/98 DSCR: Debt Service Coverage Ratio

Evolution of yearly added wind-power capacity This new system had a very positive effect in the development of wind energy in Spain Spain Evolution of yearly added wind-power capacity Government induced uncertainty by considering changing the law Introduction of new system MW Average: 1969 Average: 1.181 Source: Emerging Energy; REE

The French feed-in tariff France On shore feed in tariff Offshore feed in tariff

The Green Certificate scheme in Belgium Establishment of a combined system of Green Certificates, with a floor price, to encourage the use of renewable energy: each Region and the Federal Government have organized a system of Green Certificates based on common principles. The Green Certificate scheme is based on an innovative combination of two mechanisms. Firstly, the Regions organize Green Certificate markets and oblige electricity suppliers to deliver a certain quota of green electricity (to be adjusted every year). At the same time, the Federal Government has established a floor for green certificates in case the market should not work properly and also to grant investors a minimum return. “Black” Energy Pricing Green Certificates Pricing €/MWh 65 ÷ 100 €/MWh +

New Regulation for Green Certificates in Belgium improves significantly wind farms’ remuneration Timeframe for renewable quota requirements Since the 1st of January 2008 Cap 100 €/MWh Floor 65 €/MWh Cap & Floor Indexation Yes The number of Green Certificates issued is equal to the CO2 savings rate multiplied by the net electricity produced by the wind farm Number of GC per MWh produced Duration of scheme 15 years from the date of notification of acceptance Penalty for non compliance 100 €/GC

Mechanism description The Green Certificate scheme in Poland Poland Evolution of historical Green Certificate Market prices Mechanism description Energy distributors have to redeem a certain quota of their sales in Green Certificates each year (quotas established until 2017), or pay a penalty fee Penalty creates a ceiling on the Green Certificate market price and acts as a reference price One Green Certificate issued per MWh for all RES-E sources, with unlimited lifetime Market expected to be structurally short PLN/MWh €/MWh Evolution of quotas Renewable energy quotas imposed on energy distributors / final suppliers % of electricity sales Source: Polpx, Oanda

New Regulation for Green Certificates in Romania improves significantly wind farms’ remuneration Old regulation New Law Timeframe for renewable quota requirements Until 2012 Until 2020 Currency Green Certificates are denominated in € Cap 42 €/MWh 55 €/MWh Floor 24 €/MWh 27 €/MWh Cap & Floor Indexation Not indexed (no nominal growth) Yes 2 GC/MWh produced until 2015 1 GC/MWh afterwards Number of GC per MWh produced 1 Green Certificate per MWh Duration of scheme Not defined 15 years since the beginning of exploitation Penalty for non compliance 84 €/MWh 70 €/MWh GC component  ~ 110 €/MWh (expected shortage plus 2 GC/MWh) Energy component  ~ 50 €/MWh Total remuneration  ~ 160 €/MWh

Key success factors for the development of wind energy Conclusions Key success factors for the development of wind energy Stable and predictable regulatory frameworks are favorable to renewable energy development 1 2 If no action is taken, sector’s fragmentation in small Countries might slow down development The participation in the process of large groups/consortia can speed up the process 3