40 mm TDPs Briefing For: 40mm Industry Day JAN 2004

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

AS9102 First Article Inspection Report
ARDEC 40MM GRENADE 3D TDP CONVERSION EFFORT
Section 1 – Manual Graphics
First Article Inspection Report
1 AO Milan 40MM Manufacturing Support Capabilities J. Fine & J. Solgaard January 28, 2004.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Tutorial: Drawings Chapter 2. Choose a Paper Size/Format Leave Unchecked for Plain Sheet INTRODUCTION TO SOLID MODELING USING SOLIDWORKS 2009.
MK-19.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Week 6 - Lecture Product Documentation
SAFE Safe Animal Feed Education Program 2003 California Department of Food & Agriculture Agricultural Commodities & Regulatory Services Branch.
Test Reporting Best Practices By Gabriel Rodriguez.
First Article Inspection
Things to note... The Simple Cart is designed to give users an experience similar to other online shopping sites by separating the cart from the checkout.
Catlyn Colson. Recap of Previously Completed Work Previously I had done the following: Built the Database, started basic layout of the webpage, connected.
TRW Code Updates Planned for ERD Activity in Windchill CRS User Help Guide for New System Changes October, 2005 TRW Automotive September, 2005 TRW Automotive.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Tracking/Requesting Local Modification Session #5312 Bradley Smith University of Central Florida
©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
Unclassified U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Reverse Engineering Re-defined Requirements TARDEC 25 AUG Presented.
Allen Hughes State Materials Office
Assignment 8 information
PLANNING AND SCHEDULING
Online Substantive Process TRUST MANAGERS Self Teach Tutorial April 2008 Version 1.0.
Course # PEMS Version 2.0 Upgrades. Unit 8 PEMS Version 2.0 Upgrades Several improvements to PEMS application  Improvements based on: - Change.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
ADVANCED PLANNING BRIEFING TO INDUSTRY
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Greta Robertson Kathy Hoffman /11/2011 SCEIS Finance Automated Interfaces.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Parachute Design Unit. Design a parachute that will safely deliver its cargo to the ground according to the following constraints: * The parachute must.
Successfully Presenting Your Microsoft Project Reports
GTK - TDC analysis Lukas Perktold 14 th April 2010.
Software Maintenance Speaker: Jerry Gao Ph.D. San Jose State University URL: Sept., 2001.
Presented By: Raman Chhima Product & Consumer Safety Specialist, GS1NZ GS1 ProductRecallNZ Introductory Webinar – we recommend you reference our user guides.
Project Management Organization Scheduling 31 January.
Scenario Topics. Creating Work Item Lists Use a work item list: To track status for a team or group of tasks. To view or change work items offline. To.
VIEWNG SYSTEMS There are two ‘viewing systems’ that we use to visually interpret the world around us. What do you think the two ‘viewing systems’ are?
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
© Michael Crosby and Charles Sacker, 2001 Systematic Software Reviews Software reviews are a “quality improvement process for written material”.
Section Objectives Identify the purpose of the marketing plan.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1 Weekly Slippage Report Current (Start / Finish) vs. Last Week Comparison Microsoft Project Users Group  Introduction  Current (Start / Finish) vs.
EMI INFSO-RI Software Quality Assurance in EMI Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
Legal Scientific Laboratory Notebook
SWH The Marketing Plan Devising a Marketing Plan Reviewing and Revising the Marketing Plan 1/22/2016SWH.
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
Parts of a Report. Feasibility Reports An outline of a feasibility report may look something like this: Project overview Market Budget Survey Results.
EWB-UMN Wiki Tutorial November 15, 2008 B.Bell 1.Attach a document to your project wiki 2.Edit your project wiki to move your document 3.Add a website.
NAVAL INVENTORY CONTROL POINT 1 Naval Supply Systems Command Status of NPB Focus Item Inadequate Technical Data Elaine M. Smith NAVICP Asset Protection.
PROGRESS REPORT LECTURE 7. What is a Progress Report? A Progress Report : documents the status of a project describes the various tasks that make up the.
Bus 1040 Project Management Week 6,. Agenda Housekeeping Marking for the past 6 weeks. WBS Quiz review Decision Matrix Work through the book case we will.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
<workgroup name>
How to Write a Laboratory Report.
Technical Scope of Work
This PowerPoint can be found on my Moodle page.
Lesson 4 Systems Engineering Plan Exercise Team #
Technical Scope of Work
How to Write a Laboratory Report.
Documentation Standards
S-127 – Marine Traffic Management Release Candidate NIPWG 6 30 January 2019 Raphael Malyankar Eivind Mong Sponsored by IHO.
Historical/Biographical Essay Rough Draft
Technical Communication
How to Write a Laboratory Report.
INDIVIDUAL/ORGANIZATION/COLLECTIVE/ASSOCIATION/
Presentation transcript:

40 mm TDPs Briefing For: 40mm Industry Day 28-30 JAN 2004 Review, Clean and 3D Arthur R. Pizza Act. APO 40mm Production US ARMY ARDEC apizza@pica.army.mil (973) 724-6032 Leo D’Ulisse Team Leader Quality Assurance US ARMY ARDEC dulisse@pica.army.mil (973) 724-5715

Introduction Objective: To provide an update of the ongoing technical review of the 40mm Technical Data Packages. The technical reviews will include the generation of Detailed Specifications and have a three-dimensional feature added to the drawings. Goal: To complete the TDPs by 30 April 2004.

TDPs Affected High Velocity (MK19 Mod3 GMG) Low Velocity (M203/M79) M385A1 Practice M918 Practice (“Flash-Bang”) M430A1 High Explosive Dual Purpose (HEDP) Low Velocity (M203/M79) M781 Practice (“Orange Dye”) M583A1 White Star Parachute (“Illumination”) M433 High Explosive Dual Purpose (HEDP)

OUTLINE Review the TDP Generate DTL Specifications as required. Drawings Specifications (Standardize Testing) Packaging Requirements Generate DTL Specifications as required. Generate 3D drawings

Review the TDP Check drawings Hierarchy (WBS) Notes Dimensions and Tolerances Drawing Methods Specifications (Standardize Testing When Possible) Qualified source of supply Distribution Statements

Examples Hierarchy Notes Dimensions and Tolerances Is there a COAI drawing? Is a DTL Spec. attached to the top drawing? Are the Packaging drawings correct and called out? Notes Are they clear and understandable? Do they make sense and are they necessary? Dimensions and Tolerances Are the dimensions correct? Are they called out correctly using the right symbols? Does the tolerances make sense?

Examples cont. Drawing Methods Ansi-Y14.5? Are the proper symbols used? Are the datum's correct? Are the depiction correct? Qualified Source of supply Are there qualified sources? Are they still making the item? Distribution Statement Is the statement correct? Is it missing?

What This Means A better TDP set-up for a Systems type contract. Up-to-date Detailed Specifications Better understanding and improved visualization through 3d. Reduced number of ECPs and RFDs and RFWs.

Technical Data 3D

M385A1 3D TDP Scrub Finished Scheduled for completion Currently in progress

M918 3D TDP Scrub Finished Scheduled for completion Currently in progress

M430A1 3D TDP Scrub Finished Scheduled for completion Currently in progress

M781 3D TDP SCRUB Scheduled for completion Finished Currently in progress

M433 3D TDP SCRUB Finished Scheduled for completion Currently in progress

M583 3D TDP SCRUB Finished Scheduled for completion Currently in progress

Detailed Specifications M433 – Consolidated 7 specifications into 1: including Spitiback, M118 Ctg Case, Ctg Case LAP, M118& M195 Plug Base and Cup Powder Charge, Liner and Prj. Metal Parts M918 – Separate Projectile and Cartridge LAP M385 – Separate Projectile and Cartridge LAP M550 Fuze M550 Fuze Escapement M583/M661/M662 M781 – Completed; Available via Website M169 Case M430A1 Link

MIL-DTL Major Changes Replaced MIL-STD-105 with MIL- STD- 1916 Moved all end item requirements to Section 3 Replaced MIL-STD-105 with MIL- STD- 1916 Consolidated specifications as much as possible New format in accordance with MIL-STD- 961E

STATUS

Conclusions No TDP is perfect TDPs are living documents that are constantly changing. (For the better) If there is errors in the TDPs let me know and I will get them incorporated.

Questions Arthur R. Pizza (973) 724-6032 apizza@pica.army.mil Leo D’Ulisse (973) 724-5715 dulisse@pica.army.mil

Introduce Ray Coiro Team Leader 3D EFFORT