Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.

Slides:



Advertisements
Similar presentations
Tools for Change Plan, Do, Study, Act The PDSA Cycle Explained
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
5S training Office Environments.
A Brief Introduction to Lean Concepts for the Office Bill Motley, CEM, CQMgr, PMP Program Director, Production, Quality & Manufacturing Curricula Development.
5S BASIC TRAINING What is 5S and why do we want to do it?
CONTINUAL IMPROVEMENT
Lean Continuous Improvement. Over the next short while … n What is Lean? –Well, what is it? –5 Pillars of Lean n Lean at the U niversity of St Andrews.
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Developing Lean Process Strategies That Work Randy Benson, Ph.D. Executive Director, RHQN.
An introduction to Lean tools and methodologies
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Introduction to 6S.
Introduction into Lean and the Every Patient Matters Transformation Programme Section A1.
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
A fun and exciting way to present the 5S concepts to our team!
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Introduction to 5S. What is 5S? An easy definition is: Finding a place for everything and putting everything in its place. 5S is also the foundation for.
6S Simulation - K. Berry 1/29/ S Simulation.
Visual Workplace - A Prerequisite To Becoming World Class
5S Improving safety & efficiency
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Introduction: Throughout history and especially in today’s global economy, companies and agencies are constantly looking for ways to do more and more with.
Lean Basics Dewey Warden.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Philosophy and Key Concepts
LEAN Roger Jones Joe Novello. Introductions Historical Background Baldridge Quality Framework.
1 The Application of Industrial Production Techniques to Health Care Delivery Summary of notes Pittsburgh Regional Healthcare Initiative: Perfecting Patient.
Visual Management Quick Review
Lean Manufacturing Chapter 15 pp June 29, 2012.
Total Productive Maintenance (TPM)
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
5S REFRESHER What is 5S and why do we want to do it? Six Sigma Simplicity.
S Visual Workplace Process
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
National Practice Management Meeting Saturday 21 st April 2012 Efficient systems of Work – less resources, more results!
Value Stream Mapping.
Lean Healthcare Deployment and Sustainability Overview
Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures.
Moving ACP Provider Satisfaction to Tier 1. Objectives Provide a broad stroke understanding of LEAN approach to problem solving How to build a “Fishbone”
Kaizen Eventing: The process of observation and the elimination of waste in a process.
Safety Series Safety Leadership Series 5 S + 1 Safety Makes the Difference!!!
5S Introduction – Workplace Organisation
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
Version 3.0.
Productive and Lean Improvement Initiatives Team Champions Training 26 th July, :00 – 13:00 Parkland Hospital.
Principle of ongoing improvement
5S Improving safety & efficiency. 5S Translation Step JapaneseLiteral Translation English Step 1:SeiriClearing UpSort Step 2:SeitonOrganizingSet In Order.
Your own footer Your Logo.
Process-Flow Analysis
Lean Healthcare - The Identification of Waste in Healthcare
A Brief Introduction to Lean Concepts for the Office
5S BASIC TRAINING What is 5S and why do we want to do it?
5S Burr Oak Tool, Inc. 5S PROGRAM Workplace Organization SUSTAIN SORT
Pricing your Products to be Profitable
Office 5S “S” by “S” Implementation guide Site clear = Clearing Up
5S TRAINING.
Continuous Improvement Coordinator
Lean and Quality Management Basics of Lean Management
Lean Healthcare Deployment and Sustainability Overview
5S workplace organisation
5S BASIC TRAINING What is 5S and why do we want to do it?
Kanban for Inventory Management
Preparation for Office Move / 5S Methodology
5S BASIC TRAINING What is 5S and why do we want to do it?
Introduction to Lean and Lean Training
Waste.
Presentation transcript:

Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT

Every patient matters Who are we? Teresa Hopley – Assistant Director of HR Kathy Ronan – SIP Project Support Officer

Every patient matters What is Lean? A mechanism by which we can give our patients great & efficient service Its a philosophy / way of working/ an ideal to be pursued It should be considered as dynamic and a journey rather than a fixed point Set of tools that can be applied to improve processes Its about creating the right culture to embrace change

Every patient matters Focus on what the Patient values Lean aims to focus the whole hospital on dealing with what the patient needs, when they want it. The lean approach is to maximise value adding activities in the process and eliminate what can be considered as waste or activities which do not add value The aim to is create flow in our systems

Every patient matters 1. Identify value 2. Map the value stream 3. Create flow 4. Establish pull 5. Seek perfection The Five Lean Principles

Every patient matters What is Waste or Non Value Adding? Waste/Muda is not just what we throw away Activities that consume Time, Resources and Space, but do not contribute to satisfying customer/patient needs Need to reduce or eliminate it

Every patient matters Types of Waste Unnecessary movement of patients and equipment around the hospital Excess stock levels/uncontrolled ordering Unnecessary staff movement – poor work area design Patients waiting for hospital appts or in waiting areas Recording same information on more than one system Junior doctors ordering too many tests Mistakes/not getting it right first time Not tapping into staff ideas to improve processes. T I M W O O D Y Transport Inventory Motion Waiting Over processing Over production Defects/ Reworks Your skills and unused creativity

Every patient matters Technical change Cultural change What happens if this balance is not achieved? Effective Change Programmes Need a Balance

Every patient matters Technical change Cultural change If There’s too Much Emphasis on the Cultural … …people feel different but the work process is fundamentally the same: results are limited.

Every patient matters Technical change Cultural change If the Emphasis is all on the Technical Side… … potential improvements in performance are hampered because the old practices are still in place: no-one feels involved.

Every patient matters Effective Change Programmes Need a Balance Leadership Technical changeCultural change Policy Deployment Value Stream Identification Value Stream Mapping Standardisation Lean Techniques Leadership, Coaching Lean Awareness

Every patient matters Satisfied staff Loyal & committed staff Staff that support the service values Satisfied patients Loyal patients and membership

Every patient matters Sound familiar? Don’t want someone coming in changing the way I work Haven’t got time for this It’s always been done this way I can see a better way…..but no-one ever listens Isn’t Lean just another “flavour of the month”?

Every patient matters 5S Sort Straighten/Set Scrub Standardise Sustain Throw out the junk and only be left with what you need. Organise equipment and materials appropriately according to frequency of use, quantity required, arranged to minimise movement and labelled so anyone can find them. Cleaning is inspection, so checking items are in serviceable and safe working order each time you need it. Establishing a commonly understood standard to which we maintain the work area Audit to keep the team focused on maintaining best practice standards and look for continuous improvement.

Every patient matters And now it’s time for a game………..

Every patient matters The Rules are : Only turn over the sheet when told to do so You must cross out from bottom left to top right of each number Do NOT rotate the page Finish as soon as the time is up

Every patient matters Round 1 : Current Workplace Everything all over the place….. Equipment, Christmas decorations, out of date documents, extra supplies (just in case)……you name it, it’s there! Room is so full, you can’t find what you’re looking for……..and so, you walk to borrow one from another department.

Every patient matters Round 2 : Sort The work has begun…. All old and out of date items have been removed. There’s now more space for the equipment.

Every patient matters Round 3 : Straighten One member of staff notices that improvements have been made…….and decides to carry on the good work and change the layout of the storage in the evenings when no-one else is around. Next morning, the staff can’t find the things they need COMMUNICATION!

Every patient matters Round 4 : Scrub An effort has been made to improve the environment – less stuff around but there is no standardisation. There is some system but no-one understands it. Gradually clutter starts to appear in the room. All the good work could slip away. How frustrating!

Every patient matters Round 5 : Standardise Now the staff have worked together and standardised the room Place for everything and everything in it’s place. Everyone understands the system

Every patient matters Round 6 : Standardise Is it there or not? Without a system, how hard is it to find whether something is missing or not ?

Every patient matters Round 7: Standardise 3 Second rule – identify what is missing or gain what information you need within 3 seconds  “Lean” process. Visual Management – shadow boards, pictures, defined areas for equipment. Everything at a glance

Every patient matters So, no excuses…… Don’t want someone coming in changing the way I work Haven’t got time for this It’s always been done this way I can see a better way…..but how can I make changes? ……The Lean journey can begin Isn’t Lean just another “flavour of the month”?

Every patient mattersSTANDARDISATION 5S & VISUALISATION Lean Foundations People are at the heart of the Lean Temple Build In Quality Documentation & Delivery SERVICE IMPROVEMENT CONTINUOUS IMPROVEMENT TRANSFORMATIONAL CHANGE

Every patient matters THANK YOU