Observations with the Transverse Damper at High Intensities G. Kotzian for the Damper Team BE-RF-FB, 23. February 2015LIU-SPS intermediate internal scrubbing.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

New PS one-turn delay feedbacks and further developments
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Performance of upgraded SPS damper in view of crab cavity tests Complementarity to High Bandwidth Transverse Feedback W. Hofle CERN BE-RF-FB Acknowledgement:
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
POTENTIAL OF THE WIDEBAND TRANSVERSE DAMPER G. Kotzian on behalf of HBTFB team G. Kotzian, LIU-2013, April 12, 2013.
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
Design and Performance of the Upgraded SPS Damper after LS1 G. Kotzian for the Damper Team BE-RF-FB, 13. February 2015MSWG
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
6 Oct 2003Vince Pavlicek1 Make a BPM out of a Damper?
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
SPS and LHC Transverse Feedback Parameter Extraction: An Alternative Approach G. Kotzian, D. Valuch LBOC, 08. December
SPS Transverse Damper with Crab Cavities G. Kotzian, W. Hofle BE-RF-FB, 11. January 2016 Crab Cavity SPS Tests Day I
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
LHC transverse Damper Observations versus expectations W. Hofle BE/RF/FB CERN BE-RF team for ADT L. Arnaudon, P. Baudrenghien, A. Butterworth, G. Cipolla,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
ADT Post-LS1 16 Dec 2015 Evian 2015 / ADT Post-LS1 – G. Kotzian G. Kotzian, W. Hofle, D. Valuch Special thanks to: L. Arnaudon, A. Boucherie, A. Butterworth,
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status of the single-bunch feedback system for the SPS/LHC M. Pivi C. Rivetta, J. Cesaratto, J. Fox, O. Turgut, S. Uemuda, W. Hofle, U. Wehrle, K. Li,
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
RF acceleration and transverse damper systems
Philippe Baudrenghien, Grégoire Hagmann, BE-RF,
The SPS Transverse Damper
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
ADT and ObsBox in 2016 W. Hofle, M. Jaussi, G. Kotzian, S. Rains,
Proposals for 2015 impedance-related MD requests for PSB and SPS
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Digitizers in CCR for transverse wide-band pick-ups
Instability Diagnostics
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
SPS Transverse Damper System
Limits on damping times
Beam dynamics requirements after LS2
CERN-SPS horizontal instability
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Presentation transcript:

Observations with the Transverse Damper at High Intensities G. Kotzian for the Damper Team BE-RF-FB, 23. February 2015LIU-SPS intermediate internal scrubbing review Feb 2015 SPS Damper - Gerd Kotzian

Outline Structure: o New Transverse Damper (pLHC & Scrub, data acquisition system) o Scrubbing Periods 2014 o Observations Beam data Damper performance 23. Feb 2015 SPS Damper - Gerd Kotzian1

Scope and Motivation for SPS damper upgrade under LIU Why LS1? sharing pick-ups with Orbit System (MOPOS) from Beam Instrumentation Group incompatible with MOPOS upgrade requirements for single bunch damping for protons used for LHC p-ion Physics (closer spaced proton bunches, 100 ns) ions injection damping with fixed frequency scheme, closer spaced batches individual bunch damping for crab cavity studies not possible with previous system (sampling was not synchronous with bunch in previous system) LHC doublet scrubbing beam incompatible with previous system controls with G64 chassis and MIL-1553 (a.k.a. MMI) became obsolete  new controls for power system and LLRF, new RF function generators 23. Feb 2015 SPS Damper - Gerd Kotzian2

23. Feb 2015 SPS Damper - Gerd Kotzian3 PU1 BEAM BPM Proc. PU2 BPM Proc. BPM Proc. BPM Proc. KICKER1 PLC1PLC2 200 W Driver 200 W Driver Final Stage Final Stage Electrostatic PU processing BW ~100MHz Stripline pickup processing pLHC, Scrub Ions pFT Damper Signal Selector Damper Power System KICKER2 Beam Pos1 Beam Pos2 DSPU 1 DSPU 2 ADC1 ADC2 DAC1 DAC2 Beam Pos1 Beam Pos2 DSPU 1 DSPU 2 ADC1 ADC2 DAC1 DAC2 Beam Pos1 Beam Pos2 DSPU 1 DSPU 2 ADC1 ADC2 DAC1 DAC2 Beam Pos1 Beam Pos2 DSPU 1 DSPU 2 ADC1 ADC2 DAC1 DAC2 SPS Damper Loops pLHC SPS Damper Loops pFT SPS Damper Loops Ions SPS Damper Loops Scrub from BBQ from VNA Baseband Frontend (40 MHz) RF Frontend 200 MHz FSK Baseband Frontend RF Frontend 200 MHz Switch M1 Switch M2 pLHC pFT Ions Scrub SURFACE BA2 TUNNEL LSS2 cfv-ba2-alltrdamp[hv]1 cfv-ba2-alltrdamp[hv]2

SPS studies in Nov 2013 LBOC – Special e-cloud bunch spacing: ADT compatibility4 Old SPS damper operated at 120 MHz uses only Δ signal (un-normalized) goes unstable (phase jump) 40 MHz 80 MHz 40 MHz 80 MHz 120 MHz 160 MHz 200 MHz 120 MHz component jumps in phase by 180 o (Data from H. Bartosik, G. Iadarola, G. Rumolo) 120 MHz 160 MHz 200 MHz phase rel. to 40 MHz comp.; shift of phase of 40 MHz due to asym. splitting not displayed pLHC Scrub

New Acquisition System o provide means to expert users/piquets for diagnostics triggered by timing  freezes acquisition buffers in all channels 7 Channels, (16 buffers) − 1 OBS channel (4 buffers, selectable sources) − 6 channels per clock domain (2 buffers each, dedicated) o OBS data sources available I/Q data for sum/delta inputs (per pick-up) position data (+head-tail component) probe various DSPU internal signals 40 MSPS, 4 buffers, each 2MSamples, or ~ 2000 turns o Dedicated channels: 120 MSPS 2 buffers per channel, each 4095 samples 1-turn data (2772 slices) per ADC and DAC channel adjustment of sampling delay clock tagging (bunch 0) NB: constant data stream available (in the future)  ObsBox! (LMC March 13 th 2015) 23. Feb 2015 SPS Damper - Gerd Kotzian5 BufferSetting BufferSelectOBS BufferAcquisition BufferSetting BufferSelectOBS BufferAcquisition in FESA3: INJECTION DAMPING (damper, chromaticity) approx. 1 ms

New Acquisition System - DIFFICULTIES o Acq Data read-out not available with double buffering  removing double buffering requires data to be transmitted in the same cycle. o Read-out of large memories blocking VME traffic(!)  interfered with the setting up of the following cycle …  data readout instantaneously (several seconds) o Buffer unwrapping not reliable  data discontinuities (systematic error) o SRAM memories suffered from setup- and hold-time violations on certain buffers  data corrupted (random error) o Data from previous acquisition  cannot reliably correlate data with other buffers/ from other sources NO AUTOSAVE  all acquisitions done manually … ( Buffers are regularly in use with settings modified during setting up) 23. Feb 2015 SPS Damper - Gerd Kotzian6

’ Data sets 23. Feb 2015 SPS Damper - Gerd Kotzian7 Week others Week pLHCScrubpLHCScrubpLHCScrub 4’060 records 69 records 2’620 records MD3MD1MD3 LHC MD4 MD3 LHC 25NS LHC PILOT 1141’5062’4402’ records no beam (41 %)(28 %)(39%)(53%)(21%)(53%) Bad wrapping Available Data: 6’749 records Analytically Valuable:2’791 data sets  drop-out ~59 % 2014 Observation Data (manually saved) 6’749 records

Observations: SCRUB module (1) 23. Feb 2015 SPS Damper - Gerd Kotzian8 VERTICALLY INSTABILE “ECHO” ≈1.8 µs Overlay of 124 turns

Observations: SCRUB module (2) LHC Pilot on SCRUB: Open Loop  BPCR.214.V 23. Feb 2015 SPS Damper - Gerd Kotzian9 o OL-Ver 100 kHZ o OL-Ver 1 MHZ o OL-Ver 2 MHZ o OL-Ver 4 MHZ o OL-Ver 6 MHZ o OL-Ver 10 MHZ [ ] 18:49  19: min/measurement  OPTIMIZE … ?

Observations: SCRUB module (3) 23. Feb 2015 SPS Damper - Gerd Kotzian10 CONTRAST ENHANCED! Onset time ≈1.0 µs BW ~ 1.5 MHz SPS.USER.MD1.DamperLoop_V_Scrub mat q V ~ 0.15 … to be explained!

2014 Performance - pLHC 23. Feb 2015 SPS Damper - Gerd Kotzian11 Logbook: SPS [Thursday 09-Oct-2014 Night] 00:27 HORIZONTAL VERTICAL DAMPER OFF DAMPER ON

Observations: pLHC module (1) 23. Feb 2015 SPS Damper - Gerd Kotzian12 CONTRAST ENHANCED! NO 200 MHz COMPONENT DURING SPLITTING (≈ turns) q H ~ 0.12

pLHC.MD3 - Observations 23. Feb 2015 SPS Damper - Gerd Kotzian13 Data during MD3 cycle (25ns, no splitting) Recorded: 4 th injection ms)

23. Feb 2015 SPS Damper - Gerd Kotzian14 ~70 turns 1 turn 1 st batch2 st batch3 rd batch4 th batch activity in the last injected batch (+1 st order roll-off of damper gain)

Outlook for 2015 – SCRUBBING o Evaluate scrubbing module  Investigate on “phase behaviour” compare Scrub vs. pLHC sharing same PU and same power system, expect same behaviour … o Move to full I/Q signal processing currently the scrubbing module is too sensitive to sampling delay implement in analog, requires modification of HW  DDC - digital down conversion, modification of FW o run Scrub + pLHC damper in parallel Scrub active during splitting process (40 MHz present) pLHC kicks in once splitting is complete (200 MHz restored) o Acquisition and Observation System improvements Improve SRAM chip timings Auto-save feature (comes with new SPS Damper UI) ObsBox  constant data flux 23. Feb 2015 SPS Damper - Gerd Kotzian15

Questions? THANK YOU!