Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:

Slides:



Advertisements
Similar presentations
Status summary of the ad-hoc discussions 13th of July 2012 oneM2M call.
Advertisements

Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
ISO 9001:2015 Revision overview - General users
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,
Requirements Overview Group Name: Technical Plenary (TP19) Source: Shelby Kiewel, iconectiv, Meeting Date: Agenda Item:
February 24, 2004 TR-45 Lawfully Authorized Electronic Surveillance (LAES) Activity FCC/TIA Status Meeting on LAES Terri L. Brooks Chair TR-45 LAES Ad.
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Announcement Resources ARC Announcement_Issues Group Name: WG2 Source: Barbara Pareglio, NEC Meeting Date: Agenda Item: Input Contribution.
GSC-8xxx SOURCE:TIA TITLE:IPR Working Group Report AGENDA ITEM:Closing Plenary Agenda Item 1.1 DECISION DISCUSSIONX INFORMATIONX 21/10/2015 Report on the.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Technical questions on oneM2M certification Group Name: TST Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
PRO/ARC and TST/PRO joint sessions at TP20 Group Name: oneM2M TP20 Source: Peter Niblett, IBM Meeting Date:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
MoW Report Group Name: TP21 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Discussion on Certification Group Name: TST WG Source: JaeSeung Song, WG6 Chair, Meeting Date: TST #21.
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
MoW Report Group Name: TP20 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Process for SW Development
WPM ad-hoc group report TP#24
WG1 status report to TP#15 Group Name: oneM2M TP15
WPM ad-hoc group report TP#25
Safeguards- Feedback on Safeguards ED-2 and Task Force Proposals
Exit Capacity Substitution and Revision
Input for ad hoc on software update on 7th Dec. from Japan
Input for ad hoc on software update on 7th Dec. from Japan
DSG Governance Group Recommendations.
Presentation transcript:

Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:

MoW/M&P Last version Of MoW is Method_of_Work-v0.8.0, approved by TP9. No changes have been included since TP9 No changes as well to WP and PA. New CR template agreed in document MP R01 (adding WI indication), to be used after TP11. © 2013 oneM2M PartnerJ 2

Release Description Document In agreement with WPM: – It is proposed to open a new ADM document, containing a description of each release – The document would contain a list of the TSes (and potentially TRs) that are composing the release, together with a description of the document. – The description would be derived extracting the text form the listed deliverables. – The proposal is to copy the scope section, (the alternative is the introduction section): A decision is requested from the TP. – ALL the WG officials and rapporteurs are asked to properly UPDATE the chosen section, taking into account this specific use. © 2013 oneM2M Partners 3

Current Activities – Clarify the use of normative and informative references. Currently, different interpretations have been given, that leads to the need to clarify explicitly this issue. – Define the documentation treatment between releases (e.g. what to do with non satisfied requirements and non implemented feature? Document only in the new release or keep some information in the current release about the future one?) © 2013 oneM2M Partners 4

Pending Activities Activities – Restructure the MoW document to the new ADM template (MoW) – Inclusion of WPM procedures in MoW (MoW) – Further clarification on SC ADM types (M&P) © 2013 oneM2M Partners 5

MoW The group met jointly with MoW: – Meeting held from last TP: May 30, June 6 – Next meeting planned 30 June, 14 July, 18 July – The current forecast is to continue to meet approximately every two weeks, assuming slots available. © 2013 oneM2M PartnerJ 6