I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
<<Date>><<SDLC Phase>>
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.
Presented By: Thelma Ameyaw Security Management TEL2813 4/18/2008Thelma Ameyaw TEL2813.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Office of Information Technology (OIT) PROJECT INITIATION DOCUMENTS - BUSINESS CASE, ALTERNATIVE ANALYSIS AND STATEMENT OF WORK (SOW)
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
NIST Special Publication Revision 1
Lecture for Senior Design Classes By Dr. Pam Estes Brewer Associate Professor, TCO Mercer University School of Engineering Brewer (Adapted from presentation.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Joint Capabilities Integration and Development System (JCIDS) Nov 2010
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
Brian Lihani Deputy Chief, Aerospace Warning Branch HQ NORAD/J35W 11 May 2011 Analysis of Alternatives (AoA) This Briefing is Classified UNCLASSIFIED.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
Principal Investigator ESTCP Selection Meeting
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Sample Fit-Gap Kick-off
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
This template is for guidance
Supportability Design Considerations
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Materiel Solution Analysis (MSA) Phase
Principal Investigator ESTCP Selection Meeting
Milestone A to Milestone B Requirements Management Activities
JTAMS MILESTONE A ANALYSIS
Identify the Risk of Not Doing BA
New Space Systems Acquisition Policy
ISA 201 Intermediate Information Systems Acquisition
ENVIRONMENTAL SAFETY & HEALTH DEPARTMENT OF THE NAVY RESPONSIBILITIES
Rank, Name Office Symbol Date
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Phase 3 Tollgate Review Discussion Template
Information Required for Milestone and Decision Reviews
Phase 1 Tollgate Review Discussion Template
Employee engagement Delivery guide
Principal Investigator ESTCP Selection Meeting
Rank, Name Office Symbol Date of Briefing
Principal Investigator ESTCP Selection Meeting
(Insert Title of Project Here) Kickoff Meeting
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each page for additional guidance Updated December 2014 This template is for guidance and is not mandatory

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2 BLUF – purpose of mtg (requested decision) Requirements SPONSOR Development Planning ACQ. TEAM (CONCEPT DEVELOPER LEAD) AoA Study Guidance and Plans SPONSOR Funding & Staffing for SPONSOR Materiel Solutions Analysis Phase Affordability Constraints SPONSOR Acquisition Recommendations ACQUISITION Requested Decision ACQUISITION / SPONSOR MDD Overview

I n t e g r i t y - S e r v i c e - E x c e l l e n c e BLUF Meet the requirements of an MDD Establish ACAT level Establish lead service/organization Establish acquisition life cycle entry point Decision(s) sought Proceed with OSD engagements to prepare for MDD Approve entry into requested phase Major issues (if any) 3

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Requirements CONOPS 4

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 5 Requirements ICD (Capability Need), Operational Risk

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 6 Requirements Non-Materiel Approaches

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7 Requirements Timeliness to Need

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Summarize how well approaches that were considered adequate address the capability gaps considering JROC approved attributes and measures of effectiveness for each approach Identify known threats that mitigate materiel approaches Describe or illustrate the best materiel and non-materiel approaches based upon: total ownership cost, efficacy, performance, technology maturity, supportability / sustainment, & risk Include “no cost” approach 3 to 5 Joint system concepts (and alternative variations), that could satisfy the mission, military problem, mission tasks, operational risks and capability gaps considered in the CBA, not already addressed by currently programmed force or non-materiel solutions Prioritized list of materiel approaches: Describe the non-materiel approach(es) recommended for AF or Joint DOTMLPF Change Recommendation (DCR) Describe the materiel approach(es) recommended for further analysis (AoA) Suggested Materiel Solution Approaches for AoA Consideration 8

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Concept Summary (one per CCTD*) be prepared to talk to Notes in detail 9 Evaluations – Identify evaluations performed and results that support this concept - Parametric studies - M&S - Prototyping (performed and planned) - Analyses - Conclusions from all evaluations Description: Describe this concept and how it fits into the architecture Risk Assessment: (high, medium, low): - Operational: - Program (cost, schedule, performance): - Technology: - Intelligence: -Overall Risk Assessment: Program characterization - Cost and schedule -Design characteristics -Critical Technology Elements and maturity - Test and Evaluation - Operating Concept and DOT_LPF Implications - Supportability

I n t e g r i t y - S e r v i c e - E x c e l l e n c e AoA Summary Introduction: Background, Purpose, Scope Ground Rules: Scenarios, Threats, Environment, Constraints and Assumptions Alternatives: Description of Alternatives, Nonviable Alternatives, Operations Concepts, Support Concepts Determination of Effectiveness Measures: Mission Tasks, Measures of Effectiveness, Measures of Performance Effectiveness Analysis: Effectiveness Methodology, Models, Simulations, and Data, Effectiveness Sensitivity Analysis Cost Analysis: Life Cycle Cost Methodology, Models and Data, Cost Sensitivity and/or Risk Analysis Cost-Effectiveness Comparisons: Cost-Effectiveness Methodology, Displays or Presentation Formats, Criteria for Screening Alternatives Organization and Management: Study Team/Organization, AoA Review Process, Schedule 10 Focus is on Alternatives and AoA Org/Mgmt

I n t e g r i t y - S e r v i c e - E x c e l l e n c e AoA Alternatives Descriptions Alternative 1: Develop Cutting Edge Tech Solution.. Summarize Concept Characterization and Technical Description (CCTD) Alternative 2: Modify/Upgrade the ABC Program with new capability.. Summarize CCTD. Alternative 3: Acquire COTS Product(s) and Integrate.. Summarize CCTD 11

I n t e g r i t y - S e r v i c e - E x c e l l e n c e AoA Technical Synopsis 12 Senior Steering Group (SSG) Office of Aerospace Studies (OAS) Working Level Integrated Process Team (WIPT) Study Director: > > Employment Concepts Working Group (ECWG) Lead: > > Cost Analysis Working Group (CAWG) Lead: > > Technology & Alternatives Working Group (TAWG) Lead: > > Effectiveness Analysis Working Group (EAWG) Lead: > > Identify other Service/Agency/partner participation in Working Groups Describe models that will be used Highlight alignment with Joint planning scenarios Use either schedule format

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Preliminary AoA Schedule 13 NOTE: AFROC- and CAPE-approved AoA Study Plan is now expected at MDD Use either schedule format

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Resources for MSA 14

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Affordability 15

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Acquisition Recommendations Recommend lead service Recommend lead Center (PEO) Recommend acq life cycle entry point for the program Include entrance criteria for next proposed milestone Statutory requirements Regulatory requirements Program unique requirements Technology maturity Risk summary (technical, cost, schedule) Demonstrate that program has met the intent of any milestone(s) being skipped Show plan for compliance with statutory and regulatory requirements Identify phase(s) for future increment(s) 16

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Proposed ADM Language (select as appropriate for effort at hand) Program has met Entrance Criteria for MDD: JROC validated the xxx ICD on dd/mm/yyyy AoA Study Guidance / Plan approved by DCAPE Designate USAF as Lead Component Designate program as an ACAT IC USAF shall prepare to return for a DAB IPR, target 1Q/FYxx Authorize entry into the Technology Development phase, MS B target 2Q/FYyy Prior to DAB IPR, USAF shall: Prepare a prototyping strategy that enables competitive prototyping Propose adopting a single-step-to-full-capability strategy Prepare preliminary Systems Engineering Plan (SEP) Prepare preliminary Test and Evaluation Strategy (TES) Submit cost estimate for recommended alternative(s) and provide the supporting full-funding profile for Technology Development 17

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Summary; Requested Decision  JROC- validated requirements  AoA funding committed  Lead Service/Component (or Center/PEO) and AoA Study Team Leads established  Screening process will provide a final set of alternatives for AoA FOR AFRB  Recommend concurrence with concepts for inclusion in AoA  Approve continued engagement with OSD toward MDD DAB FOR MDD  Recommend entry into xxx phase  Authorize Analysis of Alternatives execution 18

MDD – Status of Required Core Documents 19 REQUIREMENTORIGINATOROSD OPR APPROVAL AUTHORITY STATUS/COMMENTS Affordability AnalysisAFMDA Acquisition Decision MemorandumARA/AM USD(AT&L) Analysis of Alternatives GuidanceCAPE Analysis of Alternatives Plan AFCAPECAPE & MDA Business Process Reengineering (IT and DBS) MDA Initial Capabilities Document AF JCS/J-8JROC Initial Threat Environment Assessment AFDIA Validation Market Research AFDPAPn/a Problem Statement (DBS) AFIRB Chair

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 20