Chapter 6 Measuring Masonry and Finishes. Masonry Work Generally It includes clay bricks, concrete bricks and blocks, clay tiles, and natural and artificial.

Slides:



Advertisements
Similar presentations
Chapter 5 Measuring Carpentry Work. Board Measure Most lumber is dressed; this means that surfaces are sanded, which reduces the size of cross section.
Advertisements

FORMWORK Prof Awad S. Hanna.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Measuring Concrete Work
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
CHAPTER 9 MASONRY.
Chapter 3 Measuring Excavation and Sitework
Estimating the Cost for a Foundation and Footing.
Chapter 12 Pricing Masonry Carpentry, and Finishes Work.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Construction Cost Estimating Class #5 - Concrete Prof. Ralph V. Locurcio, PE.
Composite Functions Consider a person working for a concrete contractor. One of his jobs is to estimate the cost for the product to put in a concrete driveway.
Construction Methods and Materials Masonry Masonry.
Construction Cost Estimating Class #7 - Masonry Prof. Ralph V. Locurcio, PE.
After the foundations have been completed the walls are set out and construction commences. wall structures.
Problem-solving with MATLAB Week 4: Computing volumes: cubic feet, gallons, measuring water NAME _________________________.
Bell Work: Becky reduced the size of the image on the computer screen by 40%. By what percent was the area of the image reduced?
Calculating board Feet linear feet
Calculating board Feet linear feet square feet
Floor Systems and Foundation Support
COLUMNS.
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
Masonry Details.
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
CONSTRUCTING A FIVE CABIN LATRINE
Measuring Masonry Work
Exterior Wall (Masonry)
Chapter 4 Measuring Concrete Work
The ground must push up as hard as the building pushes down
Weekend Cabin Retreat Project Wall and Ceiling Construction
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Calculations On completion of this unit the Learner should be able to demonstrate an understanding of: The formula used to calculate: Areas Volumes Ratios.
Balloon Frame North-American invention, 1833
THE NATURE OF MEASUREMENT Copyright © Cengage Learning. All rights reserved. 9.
Wall and Ceiling Construction
Construction Math This presentation gives examples of scenarios one would use math in construction situations.
1 HVACR116 – Trade Skills Structural Drawings. 2.
BILL OF MATERIALS. BEGINNING THOUGHTS ► IDENTIFY ONE MACHINE THAT YOU WILL USE TO BULID YOUR CONCRETE FLOAT? ► WHY MUST YOU USE A RULER WHILE BUILDING.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 4 Slide 1 Unit 4 Brick, Stone, Steel, and Concrete Construction.
How to Calculate Landscape Estimates and Quotes 2.01 Apply procedures to perform calculations used in estimates and quotes.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Planning Considerations in planning are: –Function or Usefulness: is it needed? –Kind of Wood: Depends on function and finish used. –Size & Proportion:
Definitions of terms associated with concrete masonry units A.Masonry Units: Blocks made from concrete, cinders, or other aggregates. B.Laying Block:
VOLUME. So far, we have learned about length. This is a measure of 1 dimension.
Agriculture Mechanics I.  The volume of a triangular prism is equal to the area of the triangle times the length of the prism. ◦ V = ( ½ (b x h)) x l.
Now that I built it, How much did it Cost?
Estimating Concrete Construction and Material Cost
Board Footage What is board footage How to Calculate it Example of calculating project costs with board footage.
QUESTION # 4 Compute the number of pieces required for the 2" X 10" X 16' stringers in forming the footing for the stem wall. Apply a waste factor of.
Math Review Basics Using Multiplication and Division.
Bill of materials: Include the following Item name Number of pieces Type of material Size of pieces Total feet of different material Unit cost Total project.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Metal Work in Masonry Module
Foundation – jay Desai.
Chapter Using Imperial Units for Volume
Structural drawing.
Installation Techniques
FORMWORK DR. Nabil Dmaidi.
Drawing Interpretation
Grout and Other Reinforcement Module
BUILDING CONSTRUCTION 1
MEASUREMENT Given perimeter – find side length
Measurement GTT – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green Architecture.
Structural Drawing Chapter 19.
Arch205 building construction wall systems- Masonry
Concrete Structures DR. Nabil Dmaidi.
12.4 Volume of Prisms and Cylinders
Presentation transcript:

Chapter 6 Measuring Masonry and Finishes

Masonry Work Generally It includes clay bricks, concrete bricks and blocks, clay tiles, and natural and artificial stone. This work is usually subcontracted. Here we consider only standard clay brick and concrete block masonry. Other work is measured in a similar fashion to that described here.

Measuring Masonry Work Masonry work is measured net in place; allowances for waste etc. are considered later. The units of measurement for masonry are generally the number of masonry pieces such as concrete blocks calculated in a two-stage process: –Measure area of masonry –Number of masonry units = area measured x a factor No deductions shall be made for openings less than 10 square feet.

Masonry Conversion Factors Reference works publish tables that list quantities of bricks or blocks per square foot area of masonry. –For example, a 4½-inch wall with ⅜-inch brick joints and laid in running bond will have 6.67 bricks per square foot of wall. –For example, for a wall of 8-inch nominal thickness built with standard blocks of size 7⅝ by 7⅝ by 15⅝ inches and a joint thickness of ⅜ inches, blocks together with 6-cubic feet of mortar are required for 100-square feet of wall.

Calculating Conversion Factors The estimator may have to calculate the conversion factors: –If bricks are of size 3⅝ by 3⅝ by 15⅝ inches with ⅜- inch wide mortar joints, what is the conversion factor? The length of a brick is 15⅝ plus a mortar joint ⅜ = 16”. The height of a brick is 3⅝ plus a mortar joint ⅜ = 4”. So, the area of the face of a brick, including mortar joints, is 16 x 4 = 64 square inches. 1 sq ft (144 square inches) / 64 square inches = 2.25 Therefore, there are 2¼ bricks for each sqare foot of wall face.

Calculating a Factor for Mortar Volume of mortar per square foot of wall: –Volume of brick + joints = 3⅝ x (3⅝+⅜) x (15⅝+⅜) – = 232 cu in/brick –And: since 1 cu. foot = 1728 cu in –Volume of brick + joints = 232 / 1728 – = cu ft/brick –Volume of brick alone = 3⅝ x 3⅝ x 15⅝ –= cu in –Thus, / 1728= cubic feet/brick –Therefore, volume of mortar = – –= cu ft per brick –Mortar volume per sq ft of wall = x 2.25 –= cu ft per sq ft.

Measuring Work (1 of 3) Masonry work (including scaffolding and hoisting) is measured separately in the following categories: –Facings –Backing to facings –Walls and partitions –Furring to walls –Fire protection

Measuring Work (2 of 3) Expansion joints or control joints in masonry are measured in lineal feet and fully described. Mortar is measured in cubic feet. Wire reinforcement is measured in lineal feet. Building in anchor bolts, sleeves, brackets, and similar items are enumerated. Building in lintels, sills, copings, flashings, and similar items are measured in lineal feet. Rigid insulation to masonry work is measured in square feet.

Measuring Work (3 of 3) Bricks are enumerated describing the type and dimensions of bricks. Brick ties are enumerated and fully described. Concrete block masonry units are enumerated stating the type, and size of blocks. Loose fill or foam insulation to blockwork cores is measured in cubic yards. Concrete to core fills and bond beams (lintels) are measured in cubic yards. Reinforcing steel to core fills and bond beams is measured in lineal feet.

Takeoff Exercise Takeoff the masonry work for the house example shown on Figure 3.5 drawings and masonry details on Figure 6.2. See Figure 6.3.