DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.

Slides:



Advertisements
Similar presentations
Ocean City Beachfill Ocean City, NJ Bureau of Coastal Engineering New Jersey Dept. of Environmental Protection Office of Engineering & Construction.
Advertisements

Inner Harbor Navigation Canal Lock Replacement Project.
T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.
INFRA DREDGE SERVICES PVT. LTD. 1-35, 3 rd Floor, Shroff Bhavan, Next to Yellow Gate Police Station, Carnac Bunder. PD Mello Road. Masjid Bunder (East),
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
AlaskaRailroad.com Alaska Railroad Update Presentation to the Alaska World Trade Center October 6, 2011 by Chris Aadnesen, President/CEO.
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
Department of Army Permitting Process: Dredging
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Community College Workforce Development Center Melfa, Virginia August 16, 2013 “ A Unified Voice.
Tessa Getchis Connecticut Sea Grant University of Connecticut Groton, Connecticut Do All Roads Really Lead to Rome?
Civil Works Baltimore District River and Harbor Projects.
Leading the way; making a difference Ballast Water Management Current situation and challenges Oslo, September 25 th 2012 Erik Ranheim Senior Manager Research.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Tessa Getchis Connecticut Sea Grant University of Connecticut Groton, Connecticut Do All Roads Really Lead to Rome?
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Coastal & Port Engineering Considerations of the Jacksonville Harbor Deepening Study Kevin Bodge, Ph.D., P.E. Port & Coastal Engineer Senior Vice President.
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
A New Tool for Estimating and Simulating Economic Impacts of Dredging Activity New, Increased and Reduced Dredging Drs. Yue Cui and Ed Mahoney, Michigan.
U.S. Coast Guard Unclassified
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
Period 3 Kiana Brayton Lyle Swallows
Technical Manager; Bechtel Oil, Gas & Chemicals.
Plan Formulation for Deep Draft Harbors Navigation Measures.
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
Dredging Engineering: Building & Maintaining Underwater Highways
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
The Cruise Ship Question Charleston’s Mission: Maximize Benefits, Minimize Costs The City of Charleston may reap financial benefits from welcoming an expanded.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Building Strong! May Deep Draft Navigation Cost Sharing Jeremy LaDart Office of Water Project Review HQUSACE.
Harbors Module NH2: Problem Identification, Inventory and Forecast, and Determination of Objectives and Constraints.
A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.
SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.
JACKSONVILLE ODMDS DESIGNATION M. Rau, J. Seitz, C. Smith, N. Lombardero – ANAMAR Environmental Consulting, Inc. Chris McArthur – USEPA Region 4 P. Griffin,
Duluth-Superior Harbor Erie Pier: CDF to PRF Conversion Gene Clark, UW Sea Grant Dredging 2012 Conference San Diego, CA 10-22/
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
Characterizing the Post-Dredge Surface: Comparison of In-Situ (Pre-dredge) and Post-Dredge Grab Samples at Three Sites in the Willamette River, Portland.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
Information Disclosure in a Web of Environmental Regulatory Mechanisms Wanxin Li Virginia Tech November 15, 2005.
Leading the way; making a difference Lunchtime Seminar October 10, 2012 Ballast Water Management JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Valerie A. Cappola, Ph.D. Kenneth M. Levitt USACE New England District.
Kwasi Badu-Tweneboah, Ph.D., P.E. – Geosyntec Consultants Jacksonville, Florida, USA Kenneth W. Cargill, P.E. – KW Cargill, P.A.. Punta Gorda, Florida,
Dredged Material Separation Plan Execution in New York Harbor Deepening Projects Jeff Snyder SeaVision Underwater Solutions.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Department of Army Permitting Process: Dredging
Main Channel Columbia River Channel is filled in to an unknown level with debris & sediment to mile 18 and maybe more. The Columbia River Jetty’s have.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
1 Briefing on Yard Waste Collection Policy March 2, 2010.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
1. 2 February Alliance Workshop St. Louis Regonal Freightway Alliance Needs Analysis and Freight Development Committee Terminal Rail Association.
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
Port Agent, Houston Pilots
Galveston Bay: Environmental Restoration Opportunities Thomas E
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
Point Estero Incident CWO Ricketson
Galveston Bay Bottom Ecosystem System Features
Beneficial Use of Dredged Material
PORT OF GALVESTON PORT DIRECTOR’S REPORT
Beneficially Using Dredge Material
Pipeline Planning and Construction: Environmental Considerations
Southern Maine Dredge Purchase Feasibility Study
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Southern Maine Dredge Feasibility Study:
Presentation transcript:

DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group

DREDGING YOUR DOCKS 2014 Supported by USCOE Galveston District U. S. Coast Guard Port of Houston Houston Pilots Lone Star Harbor Safety Com.

Dredging Cost Presentation Dredging private dock terminals Focus on hydraulic dredging Total project cost to owners Industry standards & requirements

Dredging Cost Project Specific Disposal Surveys Permitting Environmental External Cost Impacts

Identifying the scope of work: Project location Cubic yards of material Dredging template Over-dredge requirements Type of material

Choosing a Dredge: Dredge Size Project Specific requirements Type of material Pumping capacity Location Schedule

Selecting A DMPA Federal DMPA Private DMPA Uplands Beneficial Use

Dredge material placement area requirements (DMPA) DMPA location DMPA Specific requirements Pipeline route Discharge Point Crossings Ship Channel – Road Levee systems Capacity

Dredge Pipeline Cost Distance from Project to DMPA Floating, submerged, & land Pipeline route Discharge Point Crossings - Ship Channel – Road

Dredging Cost Breakdown Mobilization / Demobilization Pipeline Cost Cubic Yard Unknowns anomalies, debris, & delays Disposal Cost based on gross yardage management fees sediment samples

DISPOSAL COST DMPA COST Disposal Fees Deposit & Contract Signing Payment of Gross CY dredged Sediments Sampling Cost Management Fees Application – Consulting

DISPOSAL COSTS (per cu/yd.)

FUEL COSTS

STRUCTURAL STEEL COSTS (per ton.)

Project “A”

Project “B”

PROJECT “A” & “ B” Project “A” 115,000 cy x 8 days = 14,375 cy per dredging day Project “B” 13,000 cy x 5 days = 2,600 CY per dredging day

PROJECT “A” & “B” Overview Same dredge spread Pipeline & DMPA Similar dredge template Projects shared the mobilization cost Cost per CY is 5 times for Project “B” than “A”

HYDROGRAPHIC SURVEY Pre-Dredge Survey by Contractor Pre-dredge survey by Third Party Verify, Quantities, Tide Gauge, & intervals Verify survey datum and station #’s

Post dredge survey by Surveyor & Contractor Post-Dredge Survey review Pay DMPA & Contractor

Permit Requirements TCEQ Water Quality Certification USACE Permits Regulatory Real Estate NWP Permits DMPA Permits

EXTERNAL COST Environmental Impacts Economic Development Government Requirements USACE Regulatory USACE Real Estate EPA TCEQ Legal – Jones Act

DREDGING COST SUMARY Plan Dredging Activities Have Permits in Order Piggy Back off USACE Share Mobilization Cost with Neighbors Coordinate DMPA Contracts Early

“Not all Dredges are Created Equally”

THANK YOU FOR ATTENDING DREDGING YOUR DOCKS 2014