Oil Load Serving Study Update August 18 th, 2011.

Slides:



Advertisements
Similar presentations
Big Stone II Study Update SPG Meeting October 19, 2006.
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Northwest Quadrant Joint Security Study Southern Company Headquarters Birmingham, Alabama August 12, 2002 Presented by Saeed Arabi.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
AESO Update to PCC July 16, AESO July 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
AESO Update to PCC October 7, AESO October 2014 Update The AESO has published 20 year regional plans on its website –Forecasting 2.4% overall.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
Presentation to WECC TSS May 8, 2015
© ABB Group August 7, 2015 | Slide 1 Variable Shunt Reactors Optimize Transmission Systems Dr. Claes Bengtsson, Global Product Manager, Reactors. PowerGen.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Grid, Smart grid, CURENT. Basic components of the Electric Grid Power Plant- Electricity generation Transmission- Transmit electricity to different areas.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
An Overview of the U.S. Electric Power Grid Generation Choices, Reliability, Challenges Tom Ferguson, P.E. Adjunct Instructor Dept. of Electrical Engineering.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
1 Distribution Networks For Large Cities: EPRI Research on Modelling and Analysis Roger DUGAN Sr. Technical Executive Electric Power Research Inst. US.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Chelsea Loomis, Regional Electric Transmission Planning.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
ERCOT Transmission Planning Overview
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Oil Load Serving Study Update August 18 th, 2011.
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
February 17, 2012 Regional Planning Group CREZ Shunt Switching John Adams Principal Engineer.
Freeport Area Master Plan Project
Modeling DER in Transmission Planning CAISO Experience
Freeport Area Master Plan Project -
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Local Area Planning Update – TRANSAC
DEC System Voltage Planning - June 2018
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
AESO Update to PCC October 7, 2014.
Progress on Resource Adequacy Assessment for 2017
Big Stone II Study Update
Presentation transcript:

Oil Load Serving Study Update August 18 th, 2011

OIL LOAD SERVING STUDY AREA

WILLISTON LOAD POCKET

ASSUMPTIONS MCDC LIMITED TO 100MW E-W MDU PEAKERS OFF LEWIS & CLARK GEN ON WIND OFF CULBERSTON OFF BUT AVAILABLE FOR PRIOR OUTAGES FORT PECK GENERATION = 35MW, MAX ~135MW WINTER PEAK LOADS

CHALLENGES VOLTAGE STABILITY LOW VOLTAGE, POWER QUALITY, POOR “PROFILE” REGIONAL LOAD INCREASES 115KV LINE OVERLOADS MAINLY FEEDING WILLISTON POCKET

EXAMPLE VOLTAGE STABILITY “PV” CURVE

Charlie Creek EXISTING SYSTEM Charlie Creek-Williston at 115kV 345kV Line 230kV Line 115kV Line

Existing System Limit Until July 2012 BASELINE FORECAST

July 2012 Charlie Creek-Williston at 230kV

CAPCITOR ADDITIONS LocationTotal SizeNotes: Dickinson MVAR Per the Keystone XL initial load requirement. 2 x 15MVAR for switching Logan 11530MVAR2 x 15 MVAR Blaisdel MVAR2 x 15 MVAR Dunning MVAR2 x 10MVAR Kenniston MVAR2 x 6 MVAR Watford City MVAR2 x 15MVAR for switching State Line MVAR1 x 15 MVAR SW Minot MVAR1 x 10MVAR

Williston-CCR 230 & Cap Additions BASELINE FORECAST

2013 Networked 115kV Des Lacs

Networked 115kV

Williston SVC BASELINE FORECAST

RUN CULBERTSON PRE-CONTINGENT BASELINE FORECAST

ADD 345KV BASELINE FORECAST

Prior Outages?

Williston-CCR 230 & Cap Additions Networked 115kV BASELINE FORECAST

Williston-CCR 230 & Cap Additions Networked 115kV BASELINE FORECAST

Williston-CCR 230 & Cap Additions Networked 115kV BASELINE FORECAST

QUESTIONS?