RF Monitoring:
RF Monitoring RF Monitoring will still have its own guidance document for px?id= &menu_id= &menu_id2= px?id= &menu_id= &menu_id2=
Staging Criteria for RF Monitoring 1.Ranking from RF Tracker Data (last year’s data) a)LRE Calculation b)Commensurate School Day c)Related Services 2.Time since last RF Monitoring On-Site Review 3.New Residential Facilities Present in the LEA PBMAS SPED Stage 5.History of Noncompliance in special education 6.Current Escalated Oversight 7.RF Tracker Data Quality
Staging “Levels” Based on points assigned in matrix of staging criteria (“selection rubric” –Not Staged –Stage 1 –Stage 2 –Stage 3 –Stage 4 –Stage 4A –Stage 4B
Submission Window Submission Window (begins when staging is released in ISAM (likely in September) and ends on December 7, 2012* Stage 1 – will complete all documents by December 7, 2012 and retain locally Subject to submission request by TEA
PBMAS: An Evolution
Staging for PBMAS 4 program areas –BE/ESL –CTE –NCLB –SPED
Staging for PBMAS (cont) Each program area has indicators Each indicator is assigned a performance level (“PL”) of 0, 1, 2, or 3 –PL increases from 0-3 based on variance from state “standard” or “target” i.e., 0 = within state “standard” or “target”; PL increases as variance increases from state “standard” or “target”
Staging for PBMAS (cont) Based on the numbers of PLs 2 or 3 per program area, staging is assigned Staging is separate for each program area –Not staged –Stage 1 –Stage 2 –Stage 3 –Stage 4
PBMAS Manual 2012 Manual Organization –Section I: Introduction –Section II: Components of the 2012 PBMAS –Section III: BE/ESL Indicators –Section IV: CTE Indicators –Section V: NCLB Indicators –Section VI: SPED Indicators –Section VII: Appendices
Section VI: SPED Indicators Pages 82 – indicators
Name & Description of Indicator
Indicator Calculation
Minimum Size Requirements & Special Analysis
Data Source for Indicator
Additional Notes
Performance Level Assignments/ Determinations
Information regarding special analysis, etc.
Standards (if applicable to the indicator)
Major Changes for One Guidance Document (regardless of single program or integrated interventions) u_id= &menu_id2= u_id= &menu_id2= District AYP staging District AU status BE/ESL CTE NCLB/ESEA SPED*
Texas Accountability Intervention System
Changes for One CIP, One CAP for PBMAS, AU, AYP RF still separate for Improvement Plan Workbook (district) data analysis needs assessment improvement plan corrective action plan (CAP), if noncompliance is identified
Submission Window Submission Window (begins when staging is released in ISAM (likely in September) and ends on December 7, 2012* Submission window is same for all staged LEAs, regardless of staging “levels” or programs Note: Earlier (October 15) “submission window” for districts who are staged for AYP/AU only
Staging and Submission If staged in two or more PBMAS program areas with no stage of intervention higher than a Stage 1, conduct all activities, complete CIP, and retain locally
Texas Accountability Intervention System
ISAM Updates
Hot off the Press…
Noncompliance Module
Hot off the Press… Noncompliance Module
Hot off the Press…
Noncompliance Module Hot off the Press…
SPED Monitoring TETNs September 13, 2012 November 8, 2012 January 29, 2013 March 21, 2013 May All sessions will be from 1:00-3:00