DATAGRID Testbed 0 release Development Plan Draft proposal F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna Physics Department, Milano 11.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

Installation and evaluation of the Globus toolkit WP 1 INFN-GRID Workload management WP 1 DATAGRID WP 2.1 INFN-GRID Massimo Sgaravatto INFN Padova.
INFN & Globus activities Massimo Sgaravatto INFN Padova.
Grid Workload Management (WP 1) Report to INFN-GRID TB Massimo Sgaravatto INFN Padova.
WP 1 (Globus) Status Report Massimo Sgaravatto INFN Padova for the INFN Globus group
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
LHCb Bologna Workshop Glenn Patrick1 Backbone Analysis Grid A Skeleton for LHCb? LHCb Grid Meeting Bologna, 14th June 2001 Glenn Patrick (RAL)
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
05/07/00LHCb Computing Model Meeting (CERN) LHCb(UK) Computing Status Glenn Patrick Prototype (Tier 1) UK national computing centre Bid to Joint.
Work Package 1 Installation and Evaluation of the Globus Toolkit Massimo Sgaravatto INFN Padova.
INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001.
Deployment Team. Deployment –Central Management Team Takes care of the deployment of the release, certificates the sites and manages the grid services.
Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.
CERN The European DataGrid Project Technical status Bob Jones (CERN) Deputy Project Leader.
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
February 12, 2002 DØRACE 1 Grid activities in NIKHEF Willem van Leeuwen.
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
Workload Management Massimo Sgaravatto INFN Padova.
INFN Testbed status report L. Gaido WP6 meeting CERN - October 30th, 2002.
The EDG Testbed Deployment Details The European DataGrid Project
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
KNMI Applications on Testbed 1 …and other activities.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
DATAGRID ConferenceTestbed0 - resources in Italy Luciano Gaido 1 DATAGRID WP6 Testbed0 resources in Italy Amsterdam March,
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
05/23/2002Flavia Donno, INFN-Pisa1 DataTAG experiment grid integration plan Flavia Donno, INFN-Pisa DataTAG/iVDGL joint meeting, May 2002.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
L. Perini DATAGRID WP6 workshop 11 Dec Report on ATLAS GRID activities Sites, people, applications: setting up testbeds and grid-enabling first.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.
The European DataGrid Project Fabrizio Gagliardi EU DataGrid Project Leader CERN
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
1 DataTAG-WP4 and GLUE ( mainly from A.Ghiselli II INFN-Grid workshop) Mirco Mazzucato Gridstart meeting at HPC Cetraro.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
GIIS Implementation and Requirements F. Semeria INFN European Datagrid Conference Amsterdam, 7 March 2001.
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
M. Cristina Vistoli EGEE SA1 Organization Meeting EGEE is proposed as a project funded by the European Union under contract IST Regional Operations.
1 Application status F.Carminati 11 December 2001.
Dave Newbold, University of Bristol14/8/2001 Testbed 1 What is it? First deployment of DataGrid middleware tools The place where we find out if it all.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
WP8 & WP10 Requirements for Testbed1 Ingo Augustin CERN WP6 CERN.
Workload Management Workpackage
The EDG Testbed Deployment Details
LCG Service Challenge: Planning and Milestones
INFN – GRID status and activities
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
LCG experience in Integrating Grid Toolkits
ALICE-Grid Activities in Bologna
Alice Software Demonstration
Gridifying the LHCb Monte Carlo production system
Grid activities in NIKHEF
Presentation transcript:

DATAGRID Testbed 0 release Development Plan Draft proposal F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna Physics Department, Milano 11 December 2000

211 December 2000Testbed WP meeting -- Milano Content Testbed 0 release goals Working model Organization Testbed layout and information Conclusion

311 December 2000Testbed WP meeting -- Milano Goals of Testbed 0 release Grid basic services deployment at european level, based on Globus toolkit; main coordination issues are: – Information services –Resource access:Certification, Security and policies management –Installation kit and documentation Network layout monitoring First Grid Middleware First Grid Applications

411 December 2000Testbed WP meeting -- Milano 1.WP test activity: Testbed WP will provide the basic layout for test activity of each DATAGRID WPs. 2. WP Release: a team of people from WPs, applications, testbed and network will organize the test environment for this release, do the tests, provide feedback to the WP and validate the release for the next test phase. 3.Testbed Release : the previous software release will be integrated to the last official testbed release. This new release will be tested in a larger environment in order to be validated for the next final testing phase. 4.Official Testbed Release:a new team including also users will organize a quasi-production environment in order to certificate this release as new official testbed release. Working Model

511 December 2000Testbed WP meeting -- Milano MIDDLEWARE AND APPLICATIONS Specific WP test activity WPx team I WP Release + appl. test Testbed + WPx + appl. Team II Release :integration into testbed release and test in larger environment Testbed + WPs and appl. Team III Release test in quasi- production environment + Users Team Official Testbed RELEASE NETWORKNETWORK TESTBEDTESTBED Development Version Production Version

611 December 2000Testbed WP meeting -- Milano Testbed organization Permanent Group –Partners representatives –Testbed site contacts –Steering group Requirements group ( WPs Middleware, applications) Information service Certification Authority and Security Network layout and services –Testbed support Release Teams: one team for each Release certification phase

711 December 2000Testbed WP meeting -- Milano Partners ZIB (Berlin) PPARC RAL CNRS IN2P3 7 sites CZECH Republic 2 sites CERNINFN 9 sites Spain 5 sites ESA- Esrin 4 sites LIP (Lisboa) Russia 4 sites WP6 Coordinator: Francois Etienne Deputy : Antonia Ghiselli S.Jarp A.Ghiselli L.Gaido D. Newbold A.Sansum R.J.Wilson G.Brugnoni F.Etienne A.Merzky F.Schintke J.Gomes M.Ruda H.Sverenyak Sweden Lund O.Smirnova

811 December 2000Testbed WP meeting -- Milano Sites map Dubna Moscow RAL Lund Lisboa Santander Madrid Valencia Barcelona Paris Berlin Lyon Grenoble Marseille Brno Prague Torino Milano BO-CNAF PD-LNL Pisa Roma Catania ESRIN CERN HEP sites ESA sites IPSL Estec KNMI

911 December 2000Testbed WP meeting -- Milano Example of information per site: Marseille

1011 December 2000Testbed WP meeting -- Milano INFN testbed organization People Testbed: Antonia Ghiselli, Luciano Gaido Grid basic services coordination : site contacts Information service : Giuseppe LoBiondo, Giulia Vitafinzi, Franco Semeria Security service : Roberto Alfieri, Francesco Prelz, Andrea Chierici Release distribution and documentation : Flavia Donno, Zhen Xie Certificate Authority : Roberto Cecchini Network coordination : Tiziana Ferrari, Luciano Gaido Applications : –CMS: Ivano Lippi, Claudio Grandi, Giuseppe Bagliesi, Lucia Silvestris, Luciano Barone, –Atlas: Lamberto Luminari, Bianca Osculati, Silvia Resconi, –LHCb: Roberta Santacesaria, Vincenzo Vagnoni, Stefania Vecchi, –Alice: Roberto Barbera, Piergiorgio Cerello, Marcello Castellano, M.Luisa Luvisetto.

1111 December 2000Testbed WP meeting -- Milano Resources : –the initial resources capacity will be based on a small amount of cpu and disk (called quantum grid) in each site. The installation of the quantum grid will be accomplished by the end of the year. –During next year (2001) the LHC experiments are planning to integrate the testbed with capacity of ~200 boxes, with single o dual CPUs, and 15 TB of disks. Sites and contacts : –Bari, Maria Damato –Bologna, F.Semeria –CNAF, A.Chierici, A. Italiano –Catania, Enesto Cangiano, C.Rocca, P.Belluomo –Legnaro,M.Biasotto – Milano,S.Resconi – Padova,M.Sgaravatto, M.Michelotto – Pisa, F.Donno, A.Sciaba’, T.Boccali –Torino, A.Forte, S.Lusso –Roma, A.De Salvo

1211 December 2000Testbed WP meeting -- Milano SitesCluster nodes L=Linux Job man.Network access (bps) applications Bari3 Lcondor8Mcms,alice Bologna2L, 6LCondor12Mcms,alice,lhcb CNAF4Sun, 5LPBS12Mall Catania3LLSF4Malice, cms Legnaro3LLSF4Mcms Milano3LPBS12Matlas Padova3L, 10LLSF16Mcms Pisa5LLSF13.8Mcms,atlas Roma3L16Matlas Torino3L, 5LPBS, fork12Malice 58PCs Summary

1311 December 2000Testbed WP meeting -- Milano Org.Cluster nodes L=Linux Job man.diskTEN-155 access (bps) Grid Services applicati ons CERN5 LLSF155Msecurity CZECH64LPBS,Con.1 TB68M ESASGI,Sun, PCCondor34M to cern 155M France14L + LyonCondorall Germany5Lfork310M INFN54L,4SunLSF,PBS, Condor 1TB155 to EUallLHC Portugal8LPBS34M Russia40LPBS,..80GB Spain5Lfork45M Sweden2 ->100LPBS,Con. 200M (Nordnt) UK10LPBS155MallPAW-G Summary (provisional)

1411 December 2000Testbed WP meeting -- Milano Testbed progressively growing from quantum to production Grid

1511 December 2000Testbed WP meeting -- Milano Conclusions Working in progress…. Set up the organization and grid-layout Define CA/Security rules Define a GIS topology Plan for network monitoring tools Input from Middleware WPs and Applications Test plan Testbed kick-off date?