Requirements Structure and Status for NCFE

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

Accelerator Integration Design Integration Group [DIG] Apr. 2015
SRF Cryomodules November 2013 Meeting
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
ESS DTL beam commissioning
Requirements Engineering for the Accelerator Eugene Tanke Systems Engineer Workshop on Requirements Conformance for SRF.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
1 1. Some recent views ( ) 2 Linac tunnel
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
PBI task force intermediate report Stephen Molloy.
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
ESS Front End diagnostic
Status of Primavera (P6) Accelerator Plan & an Introduction to the Accelerator Installation Plan Luisella Lari Head planner for Accelerator & Senior Scientist.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Operation SE view point Romuald Duperrier ESS SE manager.
RF Systems and Controls for the LERF CM Tests
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
Interface requirements needed for CDRs, but… What is the workflow?
Uppsala Commitment to ESS and FREIA Planning
ESS RF Development at Uppsala University
Tom Shea Front End Meeting Catania
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
ESS Project Status Roland Garoby – Technical Director August 2018.
Managing Parameters Karin Rathsman
Beam Commissioning at ESS
RF systems introduction
Ciprian Plostinar Workshop on Testing and Commissioning
Ion Source and LEBT control system topology, Interlock strategy
ISRC and LEBT Vacuum System Design
Introduction CDR Normal Conducting Linac LLRF
Testing Coordination at ESS
MPS commissioning at ESS
PSS Verification and validation
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
European Spallation Source ERIC
High Level Readiness Reviews
Beam Commissioning Planning
Accelerator NCFE Liaison Officer
Plan for early Operation
RF introduction Anders Sunesson RF group leader
Accelerator Installation Schedule
Target Safety System Interfaces
SAR MEBT Bilbao March Mats Lindroos
General Overview of WP 12 ESS Vacuum System
Project Support Meeting January 9, 2019
Presentation transcript:

Requirements Structure and Status for NCFE Aurelien Ponton Edgar Sargsyan NCFE Interface Workshop, 23-24 April 2015, ESS, Lund

Product Breakdown structure (PBS) Levels L1 – L4 for the ESS Accelerator ESS SYSTEMS ‘PROJECTS’ LINAC SECTIONS DISCIPLINE SYSTEMS (Mapping to WBS Work Packages shown) ESS FACILITY ICS – INTEGRATED CONTROL SYSTEMS ‘CONTROLS’ SI – SITE INFRASTRUCTURE ‘CONVENTIONAL FACILITIES’ NSS ‘INSTRUMENTS’ ACC – LINEAR ACCELERATOR (LINAC) ‘ACCSYS’ TS – TARGET STATION ‘TARGET’ ISrc LEBT RFQ MEBT DTL (DTL tanks) SPK (LWUs, CMs) DmpL (inc. beam dump) BMD Beam Magnets &, Deflectors (BM*) RFS Radio Frequency Systems EMR EM Resonators (Bunchers, RFQ, DTL tanks, CMs) PBI Proton Beam Instrumentation CRYO Cryo Plant (ACCP) & Distribution (CDS*) VAC Vacuum WTRC Water Cooling CNPW* Conventional Power SUPPLIED BY WP 2, 3, 6, 17 SUPPLIED BY WP 3,4,5 SUPPLIED BY WP 7 SUPPLIED BY WP 8 SUPPLIED BY WP 12 SUPPLIED BY WP 11 SUPPLIED BY WP 16 SUPPLIED BY WP 15 SUPPLIED BY WP 13 Safety MBL HBL *PBS definition CM =CryoModule HEBT=High Energy Beam Transport LWU=Linac Warm Unit HEBT* CRYOGENICS DISTRIBUTION Beam to Target ISS* Ion Source Specialties SUPPLIED BY WP 3 A2T RMHF – RADIOACTIVE MATERIALS HANDLING FACILITY To Be Determined or To Be Agreed Upon SUPPLIED BY WP 6, 17 PWRC* PS*, HV Power Convertors* Date: 27-Feb-2015 Prepared by: E.Tanke, ESS-ACCSYS CHESS#: ESS-0008904 R4

Product Breakdown structure (PBS) Levels L4 - L5 for the ESS Accelerator PWRC* Power Convertors* ISS* Ion Source Specialties BMD Beam Magnets &, Deflectors (BM*) EMR EM Resonators (Bunchers, RFQ, DTL tanks, CMs) PBI Proton Beam Instrumentation L4 DISCIPLINE SYSTEMS (Mapping to WBS Work Packages shown) SUPPLIED BY WP 6, 17 SUPPLIED BY WP 3 SUPPLIED BY WP 2, 3, 6, 17 SUPPLIED BY WP 3,4,5 SUPPLIED BY WP 7 PS WP 6, 17 HVPC WP17 Mechanical Supports Technical Labs Mechanical Supports Technical Labs Mechanical Supports Technical Labs L5 BCM BLM ‘COMPONENTS’ (includes WP contracted products & services) EM BPM SC Cavities SPK SC Cavities MBL FC SC Cavities HBL ID (Insertable Dump) BSM PM (invasive) NPM (non-invas.) TD (Target Diagn.) Technical Labs RFS Radio Frequency Systems VAC Vacuum CRYO Cryo Plant (ACCP) & Distribution (CDS*) WTRC Water Cooling CNPW* Conventional Power L4 DISCIPLINE SYSTEMS (Mapping to WBS Work Packages shown) SUPPLIED BY WP 8 SUPPLIED BY WP 12 SUPPLIED BY WP 11 SUPPLIED BY WP 16 SUPPLIED BY WP 15 LLRF WP8 RFRL WP8 Mechanical Supports Technical Labs Technical Labs Collimators & Gamma Blockers L5 ‘COMPONENTS’ (includes WP contracted products & services) CIC WP8 RFMOWP8 Beam Pipes SUPPLIED BY WP 6 L5 requirements are specification documents and are not stored in DOORS AMPL WP8 AMPH WP8 FE Collimators WP3 Linac Dump WP?? Technical Labs RFDS WP8 *PBS definition CM =CryoModule HEBT=High Energy Beam Transport LWU=Linac Warm Unit Date: 27-Feb-2015 Prepared by: E.Tanke, ESS-ACCSYS CHESS#: ESS-0008904 R4

Responsibility for Authoring of Requirements Top-down: Accelerator Integration Group (AIG) i.e., the Lead Engineers Interface: The interfacing Work Packages In the case of IKC, this means the contracted institution Thus: Top-down requirements will be authored by ESS For delivery to WP3 Interface requirements will be authored by WP3 and respective WPs For delivery to ESS AIG NCFE Interface Workshop, 23-24 April 2015, ESS, Lund

Top-down requirements written by Lead Engineers Requirements in DOORS Interface requirements written by interfacing WPs (Interface A – Interface B) in a common agreement Examples: EMR (WP3) – WTRC (WP16) BMD (WP3) – PWRC (WP17) Top-down requirements written by Lead Engineers Linac section L3-System L4- ISS PBI L4-BMD L4-EMR L4-RFS Ion Source ✔ n/a LEBT to do RFQ MEBT DTL NCFE Interface Workshop, 23-24 April 2015, ESS, Lund