ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 The mission objectives lead to the following requirements at optics level : MAIN.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Page 1 GOMOS Calibration Review - ESTEC - 10 September 2002 Radiometric performance ESTEC – SEPTEMBER 10, 2002 Instrument performance session Gilbert BARROT.
Page 1 ENVISAT Calibration Review, ESTEC, 9 September 2002 ENVISAT Calibration Review Objectives Prepared by: J. Louet.
Isabella Pagano Milano, 14 Dec 20101PLATO TOUs An update on PLATO TOUs PLATO System & TOU Teams meeting Milano, Dec.
Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
1 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Agenda ðSystem progress report §Scenario of observations §Satellite engineering Confirmation.
EPIC MOS Life Test Facility The centre of the central CCD in the MOS cameras is showing damage – Andy Read et al. This damage causes low energy redistribution.
J.P. Halain – Centre Spatial de Liège
SDW20051 Vincent Lapeyrère LESIA – Observatoire de Paris Calibration of flight model CCDs for CoRoT mission.
Cryogenics for B-Pol S. Masi, reporting from F.X. Desert L. Piccirillo …. Use SAMPAN as a baseline, and look for improvements/variations.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
For the asteroseismology channel The database contains all the stars brighter than m V = 9.5 (~ objects) with extensive data from: The CDS/Simbad.
Integration and Test 14 October 2008 Martin Nordby.
SDW2005, juin, Taormina The Corot Space instrument.
STEREO IMPACT Preliminary Design Review 2001-September 11,12 David Curtis1 IMPACT Project Overview.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
PLAnetary Transits and Oscillations of stars PLATO Consortium kick-off meeting.
Onboard Data Processing Units
1 COROT: Scientific comity Sept Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
The whole instrument Tests performed Conclusions EUSO-BALLOON, EUSO-BALLOON flight review 04/06/2014 P. Barrillon on behalf of the many hard workers involved.
Optical principles of diffraction focussing, Preparing the way to space borne Fresnel imagers NiceSeptember 23-25, Laurent Koechlin Laboratoire.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
OPTICON JRA4 Coordinator Dr Alain Chelli Laboratoire d’Astrophysique de Grenoble & Jean-Marie Mariotti Center, Universite Joseph Fourier, BP53, Grenoble.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
Integral Field Spectrograph Anne EALET CNRS (IN2P3) FRANCE, Instrument Scientist Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
Cormac Neeson Space Engineering and Technology GERB Project Status 22/03/2004.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 Euso-balloon Lenses A)Design: - Alex Zuccaro (now at ESTEC) - Yoshiyuki.
1Corot Science Week, Berlin, December 2003 Inside the COROT machine Overview of global loop for COROT operations Description of COROT Subsystems.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
A Search for Earth-size Planets Borucki – Page 1 W.J. Borucki & Kepler Team (NASA Ames Research Center) NASA Academy 14 July 2010.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
PPLC – ESA FEB 27th 2009 CCD thermal specs G Epstein CCD thermal specifications Divers for Telescope thermal architecture.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
ISWG - December 7, Destiny, The Dark Energy Space Telescope.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
Integral Field Spectrograph Eric Prieto LAM. How to do 3D spectroscopy.
Status of the SWAP instrument
Athena Italian and CNES/IRAP Meeting
The European Contribution to eXTP
The SNAP Integral Field Spectrograph Overview of the project
Point Source Transmission Simulations on the COROT baffle
COROT, COnvection, ROtation & Transits exoplanétaires
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
An IFU slicer spectrometer for SNAP
ارائه كننده: شاهين انتصاري
上 海 理 工 大 学 University Of Shanghai For Science And Technology
ألاطراف ذات العلاقة. ألاطراف ذات العلاقة التعريـف   وفقاً للمعيار الدولي IAS 24 تتضمن الأطراف ذات العلاقة كل من المدراء والموظفين والشركات والمؤسسات.
Integration and Test Organization Chart
- '1:- bs? a ' I.
THERMAL CONTROL SYSTEM
AGENDA 1 - THE INSTRUMENT Architecture of the instrument
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 The mission objectives lead to the following requirements at optics level : MAIN OPTICAL REQUIREMENTS

ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 OPTICAL CONCEPT

ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 EXOPLANET OPTICAL SPOT Spot with the prism located in front of the exoplanet detectors

ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 ASTEROSEISMOLOGY OPTICAL SPOT

ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 ELECTRONIC ARCHITECTURE

ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 PHOTOMETRIC CHAINS

ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 HOUSEKEEPING ELECTRONICS

ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 CCD CNES contract Instrument manager CNES Instrument System CNES Product Assurance CNES Performances/Validation LAM Architects : Optic-LAM Mécanic-CNES Thermic-CNES Informatic-DAEC Electric-DESPA Instrument AMT CNES Project Control CNES COROTEL LAM COROTCAM DESPA COROTCASE DESPA COROTLOG DAEC Collecteur Afocal Alcatel Baffle / Obturateur Belgique (CSL) Optiques ESA Structure /MLI Alcatel AMT Corotel Alcatel Bloc focal SODERN Objectif Dioptrique ESA Elect. Proximité Italie (OFF. GAL.) Structure Belges (Sonaca) Boîtiers électr. BS Italie (Carlo Gav.) BEX Autriche (IFW) DPU SSD (ESTEC) AIT Instrument CNES BCC / BCV Italie (OFF. Gal.) DLR Facilities ESA Bi-prisme / IAS Calibration / IAS LAM/DESPA/IAS Integration support