Royal Thai Navy A Network Flow Viewpoint to Offshore Patrol Vessel Engineering CDR Peerapong Yoosiri, Royal Thai Navy LT Jeff Lineberry, United States.

Slides:



Advertisements
Similar presentations
Marine engineers design, operate, maintain, and repair the mechanical systems of ships. Working closely with the architect who designs the ship structure,
Advertisements

Managing a Successful Mechanical System project Following design – what next?
Outline LP formulation of minimal cost flow problem
1 Ivan Marsic Rutgers University LECTURE 15: Software Complexity Metrics.
NYC Emergency Responders: An Analysis on FDNY Response Times By: LT Jason McKeown & LT Annette Feliciano-Ramos.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Adrian Cook, Group Head of Procurement
Sustainable Growth Through Network Optimization Team Name: Q lean Yunyang Liu Jennifer Lu Hiroaki Tanaka Xueqing Wang.
Consumer Packaged Goods Manufacturing Industry Team: Aymaras Pan American Advanced Studies Institute Simulation and Optimization of Globalized Physical.
History and Development of the CISG
Agent Mediated Grid Services in e-Learning Chun Yan, Miao School of Computer Engineering Nanyang Technological University (NTU) Singapore April,
Sourcing Agreement Between
Transportation, Assignment, Network Models
Core Performance Measures FY 2015
Expectations What your Construction Professional, Architect, Construction Manager/Contractor expects from you? What you can expect from your Construction.
Note: See the text itself for full citations. Information Technology Project Management, Sixth Edition.
Wal-Mart Logistics Network LT John Harrop and LT Aaron Baker.
1 Doing Business with California Public Utilities Verizon Communications Hosted by California Public Utilities Commission April 26, 2007 Alliance West.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
The 13th Annual Leaders for Manufacturing Alumni Conference Breakout Session #1 Case Studies and Troubling Issues in Establishing Global Supply Chain Strategies.
Afghanistan Illegal Drug Trade LT Dan Ryan Capt Steve Felts Capt Bethany Kauffman.
Hongyu Gong, Lutian Zhao, Kainan Wang, Weijie Wu, Xinbing Wang
Network Models Tran Van Hoai Faculty of Computer Science & Engineering HCMC University of Technology Tran Van Hoai.
Construction Work Packaging
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Undersea Cable Network Capt Matthew Bohman & LCDR Charles Burton OA 4202 Network Flows & Graphs June 7, 2012.
Nondimensionalization of the Wall Shear Formula John Grady BIEN 301 2/15/07.
Modeling Attacks to Chesapeake Bay Shipping LT Sarah Watson LT Matt Yokeley.
SAN FRANCISCO DRUG INTERDICTION SIGACT Analysis and Network Interdiction By: Adam Haupt and Austin Wang.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
Topic1b: Project Life Cycle
Traffic Flow Jerusalem to Tel Aviv Kiong Teo Yuval Nevo Steve Hunt.
Network-Based Optimization Models Charles E. Noon, Ph.D. The University of Tennessee.
Performance and Development Sustainable Procurement The path to progress and efficiencies Janet Chapman Sustainable Procurement Officer.
CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.
Financial evaluation 9 March Financial Feasibility Assess the ability of the utility or developer to meet the financial obligations associated with.
Project Management Methodology Development Stage.
CALIFORNIA NATURAL GAS PIPELINE SYSTEM LT SEZGIN OZCAN LT MEHMET BUHUR.
© 2011 Autodesk Storm and Sewer Planning with AutoCAD ® Map 3D and Autodesk ® Storm and Sanitary Analysis Tanya West, PE, LEED AP Autodesk Technical Specialist.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
DISCUSSION Surya Garments, one of the leading garment company in Nepal, is requesting you for your help to manage foreign exchange risk in the following.
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
1 Energy Efficiency Programs For Local Governments & Community Partners Christina Prestella Program Manager, Government & Community Partnerships PG&E September.
The Administration’s Small Business Agenda Contract Bundling: A Strategy for Increasing Federal Contracting Opportunities for Small Business.
Network Flow Problems Example of Network Flow problems:
Energy savings on mining compressed air networks through dedicated process plant compressors Rudi Joubert 16 August 2012.
Project Management Capstone Project Proposal November 01, 2002
Interdicting Social Networks Cpt Tobias Uwe Kuhn (Lt Paul Ortiz)
® IBM Software Group © 2009 IBM Corporation Essentials of Modeling with IBM Rational Software Architect V7.5 Module 13: Traceability with WebSphere Business.
Team Name: Oriental Dragon Jingru Kang Shu Wang Zheng Xia Yazhou Liu.
Washington Street Boat Landing Pergola Restoration Design-Build Project Design-Build RFQ – Pre-Submittal Meeting Jeff Lundstrom, SDOT Project Manager February.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Serving the people of Cumbria Do not use fonts other than Arial for your presentations Fire & Rescue Service Alternative Crewing Arrangement (Day Crewing.
Automatic Gauging Tank System: A Next Generation Tool for UST PROF. HÉCTOR CRUZADO ENGINEERING MANAGEMENT PROJECT MEM 6200-SP-15 JOSÉ J. ROSA ROSARIO STUDENT.
Construction Work Packaging
LESSON 2 Push and Pull Systems
The Administration’s Small Business Agenda
(Additional materials)
Party-by-Night Problem
بازاریابی و بازرگانی زمستان 93.
Anna Brinck, M.S. Student Robert Cuzner, Assistant Professor
Network Entry and Initialization
Network Entry and Initialization
Operations Research Lecture 4.
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
Ann Carruthers Director of Environment and Transport Leicestershire County Council Vice Chair MSF3 Steering Group.
13 June 2013 Dave Risius Chris Wood
Huntsville High School Sports Lighting Upgrades
A feasible solution for problem 2.
Virginia Coal Power Generation
Presentation transcript:

Royal Thai Navy A Network Flow Viewpoint to Offshore Patrol Vessel Engineering CDR Peerapong Yoosiri, Royal Thai Navy LT Jeff Lineberry, United States Navy

Agenda Background Network Model Method Formulation Results Analysis Conclusions

Background

6 OPVs are required according to strategy plan 2 OPVs,constructed in China, have been commissioned in the fleet RTN is currently building a ship by domestic dockyard. Planning to have 3 more OPVs in the future.

Problem Statement “Roughly forty percent of material and parts are acquired from domestic contractors, leaving the dependency on a multitude of procurement from other countries.”

Assumptions Many of the smaller and further contractors will have more cost associated with them but may serve as good alternatives when some of the major procurement nodes are eliminated.

Data Sources All nodes and arc data was acquired from representatives of RTN.

Network Model

@ = Start of Project A = Sign Contract B = Jig Construction C = Pre-Fab & Sub-Block D = Composing Structure E = Release F = Propulsion Plant G = Cable Tray H = Electric Plant I = Piping J = Assistant Engine K = Main Engine L = Electronic System M = Communication System O = Decoration System P = Quality Control Q = Command & Control System R = 76 mm. Gun System S = 30 mm. Gun System T = HAT U = SAT V = Delivery $ = End of Project

Methodology

Formulation

Results We convert 22 nodes into 46 nodes by looking at contract options. Most contractors save money on job completion. Running shortest path interdictions, we were able to find the 8 contractors which represent 4 of the 10 countries we looked at. Utilizing those contractors, we save cost from the proposed $ 91.7 M.

Analysis

To make this problem more realistic, we manipulate the GAMS code by only interdicting the countries that associated with contractors. Only 4 countries from the shortest path model could be affected by this scenario unless we had interdicted more than one countries.

Analysis

Conclusion

Question?