Using RAMM to Improve Contract Management Charmaine Okros.

Slides:



Advertisements
Similar presentations
Continuous Improvement in CBM
Advertisements

International Alert Users Association Conference November 10-12, 2011 Jeffrey Knoepke Preventive Maintenance System.
Module 3: Business Information Systems
Using Data to Improve Customer Service Resolution using RAMM GIS Presented by Simon Gough (Roading Asset Manager) Acknowledgements to my co-writer: Hilton.
GIS: Integrating, Analyzing and Automating It's Easier Than You Think.
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Researching Efficiently and Cost Effectively on Lexis Advance™ and Lexis.com 1.
Accounts Payable–1099 Processing 1Freedom Systems – Accounts Payable – 1099 Processing WELCOME TO THE ACCOUNTS PAYABLE – 1099 PROCESSING WEBINAR WE WILL.
4.0 Reference Data (4.0 Transactional vs. Reference Data & 4.0 Types of Reference Data) After this class, you will be able to: Understand the concept of.
Expenditures Report (4033) Presented by PTD Technology 3001 Coolidge Road Suite 403 East Lansing, MI
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
10 Good Reasons for Using Oracle EBS Advanced Procurement Dave Simpkins Irene Griffith.
Project Cost Management Estimation Budget Cost Control
Capital Projects Training: Project Initiation Rick Larson 06/11/2010.
United Nations University United Nations Development Programme UNU Atlas Implementation Project Atlas Briefing Sessions – Tokyo Mar 2009 Requisitions,
Chapter 3: The Project Management Process Groups
Project Management Basics
Demo Purchasing Purchase order Financial dimension templates Accounting distributions Vendor invoice Non-PO invoice lines Adjust calculated tax.
Welcome to presentation on Contract Management System ( Primavera Software Solutions) (EPPM & CMS)
PEO Pricing Randy Wadle, CEO. Agenda Session Objectives Review pricing functionality that is not frequently used but very useful and powerful We will.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
1 Part 5: Closing Task 1 Kelvin asked you to help him prepare and present the final project presentation. Prepare a short presentation to summarize result.
Information Management in British Telecom Jon Hill.
RAMM Integration Campbell Newman. Exporting data manually Using the grids RAMM Manager RAMM GIS RAMM SQL.
Plan and Schedule Ahead Service Contracts Presenter: Debra Walke.
GENERAL GOVERNMENT FINANCIAL STATISTICS GENERAL GOVERNMENT FINANCIAL STATISTICS  Recent Achievements  Present Situation.
Table of Contents Allocation Overview 3 Allocation Objectives 5 Allocation Categories 6 Driver Based Settlements 9 Distrigas Allocations10 Total Allocations.
STANDARD CHART OF ACCOUNTS (SCOA) WORKSHOP Changes to be implemented – 1 April 2012 SCOA ROADSHOWS – NATIONAL AND PROVINCES Presenter: SCOA Technical Committee.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Equipment Module Usage Tracking, Repairs & Maintenance.
Current Projects in DTEI Presented By: Tracy Jordan.
Elmar Meyer Pierre Janse van Vuuren Nathi Ndlovu Ferdinand Chauke Moses Fakude 9/15/20101PMP Exam Prep.
Presented by PTD Technology 3001 Coolidge Road Suite 403 East Lansing, MI
| See the possibilities… Job Planning Basics Fusion 08 Pat Dykes.
1 Port Cost Management. Port Cost Module - Key Benefits 2 Efficiency gains and improvements in data fidelity: – Direct single-source data entry via e-commerce.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
Microsoft Dynamics ® NAV 2009 Service Management.
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
Project Management Processes for a Project
Over/Under Billing Presented by Brian Cancian. Welcome If you are applying for CPE credit, please be sure to sign in and sign out. Please write legibly!
Midwest alio ® Conference November 13-14, 2013 Fixed Assets Michael Williams.
Human Resources The Human Resources range of products consists of HR Classic which contains the Establishment Manager, Jobs Manager, Employee Manager,
Henrik Kjems-Nielsen ICES Secretariat InterCatch – the screen guide.
Massachusetts Office of Information Technology Executive Office for Administration and Finance Business Planning Working Session March 2015.
PMIS Introduction to Sunflower Release 2.9 New Features And Custom Enhancements Training Presentation US Department of Health and Human Services.
G061 - Stock Control. Characteristics stores a list of all stock items and their suppliers update the stock records when items are purchased –by subtracting.
Fleet Manager The Fleet Manager has a comprehensive range of modules for vehicles owned by the company or privately owned. The module has a settings button.
Title of presentation Name(s) of author / presenter / co-authors
MICROSOFT DYNAMICS® AX
Automating Accounts Payable
Data-Basics Training & Support
Material and Supply Delivery Order
Business Connect Time Sheets February 2017.
Prepare Microsoft MB6-895 Question Answers - MB6-895 Exam Dumps - Realexamdumps.com
Pass Microsoft MB6-895 Exam With 100% Passing Guarantee - MB6-895 Exam Dumps RealExamDumps
Batch Setup.
PROJECT CHANGES IN EMS Implementation Seminar.
Create, Collaborate, Construct - A Guide to Projects
Visit Cycles Justifying Audit Days
Benefits of Salary Admin
Year End Essentials Presented by: Carol Kossoris, CPA, MBA
Chapter 2 The Balance Sheet
Audit of the Rail Production Database
Batch Setup.
Cost Estimation.
Enhancement Notification Release 5.4
Contract Requirements for Suppliers
Presentation transcript:

Using RAMM to Improve Contract Management Charmaine Okros

2 Attention to Detail in Contract setup Systems to Support Contracts Reporting and Data Analysis How do we use RAMM Contractor to Improve our Contract Management?

3 Schedule linked to Client Account Codes (WBS) Dayworks have specific claim lines to pull down the correct WBS Code Programme categories to flag WBS overrides Automating the WBS Codes

4 Automatic Estimating

5 Schedule Aligned with Assets

6 Contractors % Overheads set up against Dayworks items Entire Schedule updated with the % No need for manual calculations Contractors Overhead %

7 All costs are associated with the correct WBS Code to allow for even distribution across the budget. P & G Spread Across WBS Codes

8 Patrol Templates

9 Meeting & Presentations

10 Works Management Process

11 Cardinal Rules to Raising a Dispatch One Dispatch per Asset Type One Dispatch per Maintenance Activity – refer Table 4 ‑ 1 The Dispatch dimensions must reflect the scope of Work The Dispatch location (Start – End) must reflect where the work area, where defined by the fault code Dispatch Asset Type must be valid in terms of Unsealed Activity on Unsealed asset, Sealed Activity on Sealed roads asset, Signs activity on Sign assets etc... Dispatch Guide with Cardinal Rules

12 Asset Update Guide

13 Annual Planner

14 Missing Data Reports

15 Maintenance Cost Data

16 GIS Layers

17 Patrol & RAMM Contractor

18 Routine Achievement Report

19 Improved maintenance and renewal decisions Improved asset updating Improved maintenance achievement and cost records If you get contract setup and support this with strong reporting and analytics

20 Network Owners Control the Contracts

Thank you.