Large Platforms For Push-pull Hitoshi Yamamoto 18-Sep-2007 IRENG07.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
NLC - The Next Linear Collider Project IR Layout Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Construction and Installation of the CLIC Experimental Area
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
M.Oriunno, SLAC ALCPG September ‘09 ILD 1 Progress on Push-Pull IR Studies Marco Oriunno, SLAC A.Herve (ETH-Zurich), K.Simran (DESY) A.Seryi, T.Marckiewicz,
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
Global Design Effort BDS updates SLAC 1:30 Monday meeting Andrei Seryi November 5, 2007 Previous update – August 20, 2007.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
MEA Machine and Experiment Assembly 1 Norbert Meyners, MEA Engineering Forum at CERN 12.Okt Thoughts about LDC Hall and Assembly (Work is not finished.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
NUMI Transmission Line (TL) Review WBS Power Supply System Transmission Line (TL) Review Nancy Grossman FNAL April 23, 2003.
4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Concept of Platform and Environment A. Hervé / ILD-Webex meeting.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 17. Sept. 2007ILC IRENG07; SLAC1 LDC Engineering Design (Status)
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
CLIC Handling Engineering Update
Detector Utility/Service Cavern
SBN Far Detector Installation & Integration
Lighting Branch Circuit and Small-Appliance Circuits for Kitchen
Generic Site Preparation
SiD Muon Yoke Structure - Deformation Studies -
Detector Service Cavern for ILC
Detector hall in mountain regions
PRESENTED BY:AMOD SHAKYA. Power Circuit –connectoin with motor using contactor Control Circuit-using switch make a holding circuit.
Sub-Detector Assembly Area Summary of discussion at ALCW2015
ARIEL Phase I Operations
CMS Gantry for Detector Lowering
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
FIGURE 28-1 In a 4-cylinder engine, the two outside pistons move upward at the same time as the inner pistons move downward, which reduces primary unbalance.
Push-pull cryo configuration C
Cu67 Isotope Radiator & Target
Presentation transcript:

Large Platforms For Push-pull Hitoshi Yamamoto 18-Sep-2007 IRENG07

Push-pull Experts seem to agree that, for a quick switch, detector, E-hut, and cryogenic system should be on a single platform. Detector needs space to move things (end caps, loading place to platform, etc.) around. Minimum disconnections in order for ‘commissioning/calibration’ to move in. Edges of platform = dead area → A large platform with full width of exp. hall. Service caverns are desirable for each detector.

beamline service cavern shaft Left detector on beamline Right detector is assembled as if non-pushpull detector E-hut

beamline service cavern shaft

beamline service cavern shaft Removable plug Support

beamline service cavern shaft Right detector on beamline

beamline service cavern shaft Both detectors being serviced

beamline service cavern shaft Another possibility for the shield design Half shields on air pads

Expensive design (Beijing ACFA07) Full exp. hall area is usable always

Some comments Installation more or less a la non-push-pull Connections from outside to platform are kept to minimum: powers mostly (no cold He). Separate platform helps isolation of vibration between two experiments. Thickness of platform ~ 2m : needs some protection at the edges (fences) + ladders.