Sub-Synchronous Problems and Prevention in ERCOT

Slides:



Advertisements
Similar presentations
Study Committee Representatives Annual Report December, 2012
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
© ERLPhase Power Technologies Ltd. All Rights Reserved. Sub harmonic protection relay S-PRO Krish Narendra, P.hD. CTO ERL – Protection, Automation, Control.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
GENERATOR PROTECTION.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Resource Data Needed For Dynamic Simulations
Sub-Synchronous Interactions with Wind Turbines
System Strength Discussion
Series Compensation and SSR - Concepts
Simulation and Analysis Methods for SSR/SSTI/SSCI
Dynamic VAR’s [D-VAR] What are D-VAR Devices? Dynamic VARs… Fully integrated modular STATCOM with proprietary 3X overload Instantaneously injects precise.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
Series Compensation and SSR - Concepts
SPS Mis-operation – DRAFT Proposal for ERCOT procedures.
Current Contribution from Wind Plant for a System Fault Working Group C17 May 2010 Meeting.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
ERCOT John Adams September 14, 2012 Planning Guide concepts for dealing with Sub Synchronous Resonance in ERCOT & other issues.
Connection of Wind Farms to Weak AC Network Marian Piekutowski Hydro Tasmania, Australia 30 May 2013.
SSR Control of Power Systems
PQSynergy TM 2011 Harmonic Assessment of PEA North1, Chiangmai’s Customers in North Industrial Estate Chotepong Pongsriwat. M.Eng(EE) Chief of Power.
Houston Area Dynamic Reactive Project March 11,
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Subsynchronous Oscillations (SSO) and PowerWorld Applications at ERCOT
Overview What is a weak system? Useful metric to identify weak systems: SCR What could possibly go wrong? Is a weak system so bad? What can you do? Risk.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
POWER SYSTEM PROTECTION
RTWG Report to TAC August 5, 2010 Howard Daniels.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Precision is measurable The use of renewable energies reveal specific requirements for electricity meters.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
Voltage grid support of DFIG wind turbines during grid faults
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
September 25, 2012 Planning Working Group - PLWG Sub-Synchronous Resonance Protection & Mitigation John Adams Principal Engineer.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
SLIDE 1 ISSUES AND PRACTICAL EXPERIENCES WITH CONNECTION OF WIND FARMS TO WEAK AC NETWORKS June 2013 PRESENTED BY BABAK BADRZADEH.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
Copyright © SEL 2012 A Comparison of Different Signal Selection Options and Signal Processing Techniques for Subsynchronous Resonance Detection Yu Xia,
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
Shun-Hsien (Fred) Huang ERCOT System Planning ERCOT RPG Meeting September 16, 2011 Preliminary Study Results of the High Frequency Oscillations in the.
Review of Series Compensation
SSR Monitoring in EMS Bill Blevins Manager, Operations Planning.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
NERC Lessons Learned Summary LLs Published in September 2015.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Sub-Synchronous Frequency Detection Using SEL OGIC ® Control Equations SSF Relay ERCOT Workshop NPRR562 Subsynchronous Resonance Larry Gross.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Craig T. Riesen Energy Workshop II 1 Electricity & Generation Basics of Electricity and Electrical Transmission Transmission Generation electrons.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
Application of Torsional Stress Relays
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
February 17, 2012 Regional Planning Group CREZ Shunt Switching John Adams Principal Engineer.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Lone Star Transmission Presentation on SSR Blair Giffin Operations Engineer September 9, 2013.
Quality and Security Assessment of Protection Systems
Siemens Wind Turbine Weak Grid Option Modeling in PSSE WECC library Hongtao Ma, Siemens Wind Power Joergen Nielsen, Siemens Wind Power Good morning,
IG BASED WINDFARMS USING STATCOM
Phase Angle Limitations
PSCAD models.
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
UNIT V STABILITY ANALYSIS 9
Interconnection of AES With The Grid
Presentation transcript:

Sub-Synchronous Problems and Prevention in ERCOT John Adams Principal Engineer Resource Integration RPG September 16, 2011

Series Compensation Series compensation is the addition of capacitor banks in series with a transmission line. Series compensation can improve the stability and voltage controllability of the network, and it makes it possible to install fewer lines total. Series compensation can also cause some generators to experience destructive sub-synchronous phenomena. September 16, 2011 RPG

Series Compensated Lines in ERCOT Existing (3): Rio Hondo – Ajo 345kV Edinburg – Lon Hill 345kV Privately-owned Horse Hollow – Kendall 345kV Future (13): Two Silverton – Tesla 345kV Two Edith Clarke – Clear Crossing 345kV Two Dermott – Clear Crossing 345kV Two Clear Crossing – Willow Creek 345kV West Shackleford – Sam Switch 345kV and West Shackleford – Navarro 345kV Two Big Hill – Kendall 345kV Lobo – North Edinburg 345kV All of these lines are 50% compensated. September 16, 2011 RPG

Existing and Future Series-Compensated Lines in Valley Lon Hill Lobo Lon Hill Ajo Ajo Edinburg Rio Hondo Edinburg Rio Hondo September 16, 2011 RPG

Existing & Future Series Compensation to Kendall Horse Hollow Big Hill Kendall September 16, 2011 RPG

Future CREZ Series Compensation Silverton Tesla Edith Clarke Willow Creek Clear Crossing D-FW Dermott West Shackleford Navarro Sam Sw September 16, 2011 RPG

Two Well-Known Sub-synchronous Problems SSR = sub-synchronous resonance, an interaction between series capacitors and a long-shaft multi-mass generator. This can cause the generator shaft to be twisted, cracked, or even broken. IGE = induction generator effect, the self-excitation of an induction machine due to the negative resistance of the machine being greater in magnitude than the positive resistance of the network at the system natural frequencies. September 16, 2011 RPG

Early Sub-Synchronous Resonance Example: 1970 and 1971 In 1970 Mohave #2 experienced SSR due to being operated while connected radially to the rest of the system through a single 70% series-compensated 500kV line. The torsional oscillations caused the generator shaft to heat up so much that electrical insulation failed. The subsequent arcing burned a hole in the shaft. The second failure a few months later occurred because the root cause analysis of the first failure was incorrect and the generator owner still didn’t know how to avoid It. This information is part of the EPRI SSR Tutorial. September 16, 2011 RPG

SSR Damage to Shaft September 16, 2011 RPG

Two Newer Sub-Synchronous Problems SSTI = sub-synchronous torsional interactions, undesirable interactions between the mechanical mass system of a generator and power electronic devices such as HVDC terminals, static var compensators, or wind turbines. SSCI = sub-synchronous control instability, undesirable interactions between series compensation and power electronic devices such as wind turbines, HVDC terminals, or static var compensators. September 16, 2011 RPG

Sub-Synchronous Control Instability Example: ERCOT 2009 Series of Events Ajo – Nelson Sharpe 345kV line was faulted single phase to ground and tripped out of service. Two wind farms outside of Zorillo became radially connected to the Ajo – Rio Hondo series-compensated 345kV line. The system experienced SSCI-induced overvoltages up to about 195% which caused the Ajo – Rio Hondo line to trip. Both windfarms suffered numerous crowbar circuit failures. Fault recorders indicated sub-synchronous currents at the series capacitors during the event. September 16, 2011 RPG

Screening Study Section 1.6, part 1 “This interconnection point is vulnerable to sub-synchronous interactions (SSI) with nearby series capacitor banks and should be studied to ensure that these interactions are not a threat to the ERCOT Transmission Grid or to the proposed Resource. It is the interconnecting entity’s responsibility to select, purchase, and install turbines that are compatible with the series compensation and to provide ERCOT documentation that conclusively establishes that the project will not cause SSI problems. September 16, 2011 RPG

Screening Section 1.6, part 2 An interconnecting entity may meet this requirement by providing ERCOT with a letter from the turbine vendor stating the following: What model and type of turbine the vendor is providing for this project. That the vendor has studied sub-synchronous interactions for that turbine model in PSCAD or Matlab, or with equivalent engineering tools. That the vendor’s turbines will not create sub-synchronous problems with series compensation on the ERCOT system. Who performed the study, what system model was used in the study, and when the study was performed. September 16, 2011 RPG

Who Is Responsible for What – ERCOT Staff Educate the ERCOT market participants about the issue and establish clear rules. Prevent future installation of equipment that will cause sub-synchronous problems for existing assets, unless appropriately mitigated. Review studies and proposed mitigation efforts. Obtain confidential data and non-disclosure agreements to allow their use in studies. September 16, 2011 RPG

Who Is Responsible for What – Generator Owners Owners of Existing Generators Provide turbine design data to ERCOT when requested. The original turbine manufacturer may charge a fee to research this design data if it is not already at hand. Review SSR studies involving your plant and make informed decisions whether or not to install additional protection, such as on-site filters or relaying. September 16, 2011 RPG

Who Is Responsible for What – Generator Owners Developers of Future Generators Inform your turbine vendors of the location of the intended project and of all ERCOT series compensation, existing and known future installations. Select a plant design that is compatible with the existing ERCOT grid and the known future series-compensated lines. If requested: submit proper documentation that your proposed turbine and plant design have been studied and shown not to have sub-synchronous problems. September 16, 2011 RPG

Who Is Responsible for What – Transmission Owners If installing series compensation: detailed sub-synchronous analysis of possible interactions between the series compensation and existing vulnerable generators. Review studies with ERCOT staff and the generator owner. When needed: develop mitigation alternatives and if necessary incorporate the mitigation. These are also required for HVDC development. September 16, 2011 RPG

Who Is Responsible for What – Turbine Manufacturers Educate your design and sales staff about the issue and about ERCOT’s current and future use of series compensation. If selling to a client for use in ERCOT, check that your turbine design will not experience sub-synchronous problems due to series compensation. Recognize sub-synchronous currents and tripping the unit or plant is not acceptable as the primary response. September 16, 2011 RPG

Who Is Responsible for What – Turbine Manufacturers If selling to a client for use in ERCOT “Riding through” a sub-synchronous event is not acceptable because the change of topology that initiated the event may be long-term rather than temporary. ERCOT can provide a PSCAD worst-case testing module for your use. Provide PSCAD turbine model to ERCOT on request. A black-boxed version of the detailed model will be sufficient if all user-defined constants and variables are left as inputs to the black-box section. September 16, 2011 RPG

Take Away If you are developing a project in ERCOT, discuss this issue with your generator vendor and design your project to avoid sub-synchronous problems. Tripping the generator off-line is not acceptable as the primary response to SSR or SSCI but is allowed as the backup level of protection. If you are designing a facility which relies on inverters, you must consider both the fault current capability of the network at the interconnection point, and the total amount of nearby inverter-based equipment. September 16, 2011 RPG