Decommissioning of Nuclear Power Plants Case Study: Dounreay Nuclear Facility Case Study: Dounreay Nuclear Facility Samuel Chapman Heriot-Watt University.

Slides:



Advertisements
Similar presentations
A2 – nuclear power Garfield Graphic with kind permission from PAWS Inc – All rights reserved.
Advertisements

Nuclear Energy Chapter 12. Introduction to the Nuclear Process Fission – nuclear energy released when atom split, conventional technology Fusion – nuclear.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Civil decommissioning market – an update Presented by Ron Gorham Head of Supply Chain Development and Commercial Relationships.
Nuclear Power. Source: Uranium-235 Process: – An unstable uranium nucleus is bombarded with a neutron and splits into two smaller nuclei and some neutrons.
Dounreay Nuclear and Chemical Land Contamination.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
To drill or not to drill? Nuclear Energy FIGURE 16: Structure of the atom.
Nuclear Energy Targets: Explain how the nuclear fuel cycle relates to the true cost of nuclear energy and the disposal of nuclear waste. Describe the issues.
MODULE “STRATEGY DEVELOPMENT”
Nuclear energy at a crossroads. Benefits Reactors generate electricity without adding to global warming/air pollution. Small amt. of U gives off large.
Chapter 12 Nuclear Energy. Overview of Chapter 12 o Introduction to Nuclear Power Atoms and radioactivity Atoms and radioactivity o Nuclear Fission o.
 A nuclear reactor produces and controls the release of energy from splitting the atoms of certain elements. In a nuclear power reactor, the energy released.
NUCLEAR LIABILITY The Nuclear Installations Act 1965 Radioactivity and the Law: Cheryl Parkhouse, Solicitor Burges Salmon LLP RSC, Burlington House, London.
Nuclear Power Discussion March 25, 2009 Joint meeting of the Legislative Energy Commission; the House Energy Finance & Policy Division; and the Senate.
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
Nuclear Fact Sheet Matthew Pigott EGRS 352 Professor Nicodemus Process: Nuclear energy results from the splitting of uranium atoms in a process called.
 Given fossil fuel’s substantial drawbacks, many people believe we need to shift to using less easily depleted and environmentally gentler fuels.
Japan’s Nuclear Energy Program
MethodAdvantageDisadvantage Landfills: Waste is buried in the ground  Rotting material produces methane gas which could be collected and used as fuel.
Nuclear Waste By: Suhani Ray, Sunita Prasla, Sibnish Ali, Rachael Milne, Jessica Chou.
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
Geologic Resources: Nonrenewable Mineral and Energy Resources Chapters 14 & 15 G. Tyler Miller’s Living in the Environment Chapters 14 & 15 G. Tyler Miller’s.
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
Nuclear Power in the U.K. Fiona Cassidy. Nuclear Power in the U.K. Nuclear power is back on the British Political Agenda Why? U.K has 19 reactors generating.
Experimental Research on Nuclear Waste Disposal (ERNW) Radioactive Waste Management in France Alexis BOURDEAUX, France Wednesday 19/05/2010.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Nuclear Waste. What is Nuclear Waste? Waste that results from the use of radioactive materials -Nuclear energy -Nuclear weapons -Hospitals, Universities,
Management of Radioactive Contaminated Land Radioactive versus non-radioactive contamination - tools and techniques.
MethodAdvantageDisadvantage Landfills: Waste is buried in the ground  rotting material produces methane gas which cold be collected  filled ground.
Nuclear Decommissioning in the UK Presented by Chris Jones.
The Pilgrim Power Plant By Khloe, Oliver, Galina, Robert and Rachel.
Nonrenewable Energy.
The Nuclear Fuel Cycle 1. NUCLEAR FUEL Nuclear fuel is the energy source of nuclear reactors and an essential element of the reactor core. The heat energy.
III. Nuclear Power. A. Reactions and Sources 1. Uses energy released by nuclear fission- the splitting of the nucleus of an atom 2. Nucleus is hit with.
Nuclear Energy and Waste By: David Long ( ); Chris Marcyniuk ( ); Adam Foster ( ) IMS3 Sustainability.
Nuclear Waste Disposal By: Tierra Simmons. Nuclear Waste Disposal Controversy Nuclear energy provides enough efficient sources of energy than all fossil.
Unit 1 Physics Detailed Study 3.3 Chapter 12.3: Nuclear Fissions Reactors.
MethodAdvantageDisadvantage Landfills: Waste is buried in the ground  rotting material produces methane gas which cold be collected  filled ground.
Fundamentals of Nuclear Power
US-DPRK Next Steps Workshop January 27, 2003Washington, D.C. Yongbyon Spent Fuel Experience Presented by Mark Mohr
Windscale Piles By: Emma Roberts. What Happened? October 10, 1957 Graphite core caught fire, releasing substantial amounts of radioactive material. The.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
The Curious Absence of New Nuclear Michael Hoeger Presented 02/06/2012.
Chapter 34. Basics The technology was first developed in 1930’s and 40’s during WWII Used for the “Atomic Bomb” Post-war, the idea of using nuclear energy.
Nuclear fission Nuclear fission: heavy nuclei split into two smaller parts in order to become more stable proton neutron Kr-90 nucleus U-235 nucleus energy.
Non-renewable and Renewable Resources Coal, Nuclear, Natural Gas, Oil, Wood, Wind, Solar, Geothermal, Solar-Hydrogen.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
1 NCEA Physics Nuclear Fission. 2 Nuclear fission Aims: To understand that a nucleus of U-235 can be split (fission) by collision with a neutron and that.
Nuclear Energy and the Environment. Current Role of Nuclear Power Plants Worldwide Worldwide 436 power plants 436 power plants 17% of electricity 17%
© Cengage Learning 2015 LIVING IN THE ENVIRONMENT, 18e G. TYLER MILLER SCOTT E. SPOOLMAN © Cengage Learning 2015 Nonrenewable Energy-Nuclear Energy.
Nuclear decommissioning: Turning waste into Wealth Disposal of low-level radiation Tzany Kokalova University of Birmingham.
Presented By RENJINI CHANDRAN. The nuclear wastes are radio- active substances which are released from atomic reactors of nuclear power stations. When.
Generations of Opportunity By Rick Perley. If selected for construction of a repository, benefits include:  Between $16 - $24 billion in direct investment.
Environmental Cleanup Program Status
Chapter 12 Nuclear Energy.
How to Protect the Local Environment
Chapter 12 Nuclear Energy.
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
Chapter 12 Nuclear Energy
Nuclear Power Public safety concerns and the costs of addressing them have constrained the development and spread of nuclear power in the United States,
Nuclear power stations
Nuclear (Atomic) Power Plant
Nuclear Energy.
A2 – nuclear power Garfield Graphic with kind permission from PAWS Inc – All rights reserved.
Our energy future.
Chapter 12 Nuclear Energy
Presentation transcript:

Decommissioning of Nuclear Power Plants Case Study: Dounreay Nuclear Facility Case Study: Dounreay Nuclear Facility Samuel Chapman Heriot-Watt University Samuel Chapman Heriot-Watt University

Dounreay site F Opened in 1955 F Developing Fast Breeder Reactor Technology (FBR) F Operated by United Kingdom Atomic Energy Authority (UKAEA) F Site has three nuclear reactors F Opened in 1955 F Developing Fast Breeder Reactor Technology (FBR) F Operated by United Kingdom Atomic Energy Authority (UKAEA) F Site has three nuclear reactors

Location Sites of UKAEA

Three Reactors F Dounreay Materials test reactor (DMTR) F F Dounreay Fast Reactor (DFR) F On-line November 1959 F Supplied National Grid from 1962 F Taken off-line for decommissioning, 1977  Supplied 600 million kWh during lifespan  Prototype Fast Reactor (PFR)  Supplied grid from  1994: end of nuclear power generation at site F Dounreay Materials test reactor (DMTR) F F Dounreay Fast Reactor (DFR) F On-line November 1959 F Supplied National Grid from 1962 F Taken off-line for decommissioning, 1977  Supplied 600 million kWh during lifespan  Prototype Fast Reactor (PFR)  Supplied grid from  1994: end of nuclear power generation at site

Subsequent Activity  Reactors have all been shut down  Care and maintenance of old plant and decommissioning activities have meant that large work-force retained.  Commercial reprocessing of spent nuclear fuel and waste stopped by the UK government in  Some waste is still accepted from other nuclear facilities in special circumstances  Reactors have all been shut down  Care and maintenance of old plant and decommissioning activities have meant that large work-force retained.  Commercial reprocessing of spent nuclear fuel and waste stopped by the UK government in  Some waste is still accepted from other nuclear facilities in special circumstances

Future of Site  On 1 April 1995 the Nuclear Decommissioning Authority (NDA) became the owner of the site  UKAEA remaining as operator.  Decommissioning of Dounreay is planned to bring the site to an interim care and surveillance state by  Brown-field site by 2336, at a total cost of £ 2.9 billion (~ € 2.18 billion)  On 1 April 1995 the Nuclear Decommissioning Authority (NDA) became the owner of the site  UKAEA remaining as operator.  Decommissioning of Dounreay is planned to bring the site to an interim care and surveillance state by  Brown-field site by 2336, at a total cost of £ 2.9 billion (~ € 2.18 billion)

 Apart from decommissioning the reactors, reprocessing plant, and associated facilities;  there are five main environmental issues to be dealt with:

 Irradiated nuclear fuel particles on the seabed near the plant, estimated about 10,000 in number. Some are being washed ashore, including as of 2006 about 70 smaller particles on the public Sandside Bay beach and one at a popular tourist beach at Dunnet.  The way these particles escaped the site has not been determined, there are several plausible possibilities.  The risk to the public is considered low.  Irradiated nuclear fuel particles on the seabed near the plant, estimated about 10,000 in number. Some are being washed ashore, including as of 2006 about 70 smaller particles on the public Sandside Bay beach and one at a popular tourist beach at Dunnet.  The way these particles escaped the site has not been determined, there are several plausible possibilities.  The risk to the public is considered low. 11

 18,000m 3 of radiologically contaminated land, and 28,000m 3 of chemically contaminated land.  1,350m 3 of high and medium active liquors and 2,550m 3 of unconditioned intermediate level nuclear waste in store.  1,500 tonnes of sodium, 900 tonnes of this radioactively contaminated from the Prototype Fast Reactor.  18,000m 3 of radiologically contaminated land, and 28,000m 3 of chemically contaminated land.  1,350m 3 of high and medium active liquors and 2,550m 3 of unconditioned intermediate level nuclear waste in store.  1,500 tonnes of sodium, 900 tonnes of this radioactively contaminated from the Prototype Fast Reactor

 A 65m deep shaft used for intermediate level nuclear waste disposal.  Shaft never designed as waste depository and was used on a very general and poorly monitored basis.  Relic of a process by which a waste-discharge pipe was constructed, designed to discharge into sea.  Historic use of the shaft as waste depository has resulted in one hydrogen gas explosion.  At one time it was normal for workers to fire rifles into the shaft to sink polythene bags floating on water.  A 65m deep shaft used for intermediate level nuclear waste disposal.  Shaft never designed as waste depository and was used on a very general and poorly monitored basis.  Relic of a process by which a waste-discharge pipe was constructed, designed to discharge into sea.  Historic use of the shaft as waste depository has resulted in one hydrogen gas explosion.  At one time it was normal for workers to fire rifles into the shaft to sink polythene bags floating on water. 55

 In 2007 UKAEA pleaded guilty to four charges under the Radioactive Substances Act 1960 relating to activities between 1963 and 1984.Radioactive Substances Act 1960  One of disposing of radioactive waste at a landfill site at the plant between 1963 and 1975 and,  three of allowing nuclear fuel particles to be released into the sea, resulting in a fine £ 140,000.  In 2007 UKAEA pleaded guilty to four charges under the Radioactive Substances Act 1960 relating to activities between 1963 and 1984.Radioactive Substances Act 1960  One of disposing of radioactive waste at a landfill site at the plant between 1963 and 1975 and,  three of allowing nuclear fuel particles to be released into the sea, resulting in a fine £ 140,000.

Current State of Shaft F More than 11,000 disposals took place until F A wide variety of radiologically contaminated material was dumped in Shaft. F Since then, environmental legislation has been tightened. F UKAEA are now required to remove all the waste from the Shaft. F More than 11,000 disposals took place until F A wide variety of radiologically contaminated material was dumped in Shaft. F Since then, environmental legislation has been tightened. F UKAEA are now required to remove all the waste from the Shaft.

 A £ 16 million contract to isolate the Shaft was awarded in October 2004 to Ritchies, the specialist geotechnical division of Edmund Nuttall Ltd.

Contents of Shaft

Hydraulically Isolating Shaft F Isolating the Shaft involves building a raised working platform F Drilling up to 400 boreholes and injecting grout into rock fractures and the liquid effluent discharge tunnel F Restricts water movement to and from the Shaft F Creates a stable environment for waste retrieval in the future F Isolating the Shaft involves building a raised working platform F Drilling up to 400 boreholes and injecting grout into rock fractures and the liquid effluent discharge tunnel F Restricts water movement to and from the Shaft F Creates a stable environment for waste retrieval in the future

Working Platform F To allow the boreholes to be drilled requires use of raised working platform F Constructed by placing a concrete core within a structural concrete facing F Built up from the height of the existing Dounreay foreshore to the height of the existing Shaft building. F To allow the boreholes to be drilled requires use of raised working platform F Constructed by placing a concrete core within a structural concrete facing F Built up from the height of the existing Dounreay foreshore to the height of the existing Shaft building.

Contruction Phases of Raised Concrete Platfrom

Design

Natural state of proposed location

Construction Problems Coastal Situation

Completed Works

Commencing of Borehole Drilling

Locations of initial sealing of outflow pipe

Future? F “Complete” decommissioning of the site F Removal of three reactors, waste from shaft and construction materials F Still nowhere yet for permenant storage of waste! F Stored at Dounreay, above ground stores pending a national policy for the management of intermediate-level waste. F “Complete” decommissioning of the site F Removal of three reactors, waste from shaft and construction materials F Still nowhere yet for permenant storage of waste! F Stored at Dounreay, above ground stores pending a national policy for the management of intermediate-level waste.

Thanks for your Attention!

Bibliography F UKAEA website F F Decommissioning factsheet F Shaft project updates F Shaft isolation Project_Raised Platform Construct F Wikipedia F Dounreay F Google Images F UKAEA website F F Decommissioning factsheet F Shaft project updates F Shaft isolation Project_Raised Platform Construct F Wikipedia F Dounreay F Google Images