Morgantown, West Virginia April 22, 2008 Innovative Mine Water Management Techniques for Submarine Coal Mines of the Sydney Coalfield WVU Mine Drainage.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Groundwater Chapter 9, Section 2.
PRESENTED MARCH 17 TH 2009 BY FRIENDS OF THE CHEAT Water Quality Monitoring & Mapping Assessment for Watershed Scale Restoration Planning in the Cheat.
Maps Tell Us About Where We Live
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
Upper Fall Brook Watershed Acid Mine Drainage and Acid Rain Impacts Conceptual Treatment Approaches Terry A. Rightnour Water’s Edge Hydrology, Inc. January.
Phosphorus and Potassium. How is P managed? Key to managing soil and fertilizer P: Knowledge of whether or not the level of soil solution P is adequate.
Treatment of Abandoned Mine Drainage An Overview of Treatment Options for AMD Lessons Prepared by Trout Unlimited With Funds from Pennsylvania Department.
The COAL AUTHORITY Management of Risks to Groundwater from Past Coal Mining Keith Parker Head of Estates and Environment The Coal Authority.
OUTLINE ORGANIZATION OF PRESENTATION Introduction/Setup Purpose Location Geology Hydrogeologic Setup Mechanisms/Analysis Recharge to aquifer Storage in.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Sustained Treatment of AMD Containing Al and Fe 3+ with Limestone Aggregate Neil Wolfe and Robert Hedin Hedin Environmental West Virginia Mine Drainage.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Educational Resource People and Place I Coal and Community Project What is Coal COAL MINING IN THE HUNTER VALLEY.
Iron Mountain Mine California Acid Mine Drainage Discharge Stuart Gaunt Guy Laurie.
The Caveat: Hydrology Complex Site specific Difficult to accurately quantify More questions than answers.
Mining R&R Matthew Gloe, Christian Bongard, James Brown Dr. W. Lee Daniels, Dr. Robert Grisso.
GEOCHEMICAL MODULE FOR “AMDTreat” Charles A. Cravotta III and David L. Parkhurst, U.S. Geological Survey Brent P. Means, Robert M. McKenzie, and Bill Arthur,
The Hydrologic (Water) Cycle. Surface Water Oceans Rivers and streams Lakes and ponds Springs – groundwater becomes surface water.
An Introduction to Acid Mine Drainage by George Mitchell and Tim Craddock.
Methods for the Estimation of Mine Infiltration Bruce Leavitt PE PG, Consulting Hydrogeologist Washington, Pennsylvania.
Australian Coal Mining
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Cape Breton Regional Municipality Water Utility Watershed Protection Source Water Protection Planning 2008/09 Presentation to Union of Nova Scotia Municipalities.
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
Formation and Treatment
US Army Corps of Engineers Philadelphia District Groundwater Modeling.
Selenium Removal from Mine Waters
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
Seasonal Changes in Biogeochemistry of a Natural Wetland Receiving Drainage from an Abandoned Mine Diane McKnight and Eric August – University of Colorado.
1 GROUNDWATER REMEDIATION OF A HIGHLY CONTAMINATED BEDROCK SITE - The Oxygen Infusion Phase - J. Morrow D. Side By :
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
April 3, 2012 Acid Mine Drainage Source Control Program Design Investigation Upper Tenmile Creek Mining Area Site Angela Frandsen, PE Helena, Montana.
You can’t leave abandoned mine shafts ……. Any ideas why not?
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Filtration Observations in the Carver County WMO West Metro Water Alliance May 25, 2011 (Thanks to Kristen Larson, Carver County)
Induction Conductivity and Natural Gamma Logs at the Osage Skiatook Research Sites “A” and “B”, Northeastern, Oklahoma By Marvin M. Abbott, Bruce D. Smith,
Decommissioned BCR Organic Media Characterization Standard Mine Superfund Site, Crested Butte, CO Neal Gallagher, Eric Blumenstein, Tom Rutkowski, John.
Chirstchurch: Pipelines. Earthquake Concerns on Underground Pipes Wave propagation Permanent ground deformation Liquefaction Can lead to pipe leakage.
 This will occur when streams receive more water than their channels can hold,  i.e. when stream discharge is greater than stream capacity.  Streams.
Mine Pool Mapping The Pittsburgh Seam Bruce Leavitt, P.E., P.G. Consulting Hydrogeologist.
River Characteristics. What is a River? National Geographic: large stream of flowing fresh water EPA: natural and man-made bodies of moving water that.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
SOME RECENT ADVANCES IN PASSIVE TREATMENT OF MINED DRAINAGE Arthur W. Rose Pennsylvania State University.
Sustainable development and the environment Remediation.
Expected Long Term Site Evolution of Alameda Creek and former Salt Ponds following Tidal Marsh Restoration Matt Wickland Philip.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Shale Gas Innovation Contest Steve Winberg Vice President, R&D May 7, 2013.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Managing TDS in the Upper Monongahela River Basin Project WRI 119 Paul Ziemkiewicz, PhD Director West Virginia Water Research Institute 1 West Virginia.
Water Resources Assessment Main Resources – Surface water – Groundwater – Unconventional Tools – Flood routing/delineation models – Runoff models – GIS.
Subsurface Drainage (Tile) Design Thomas F. Scherer NDSU Extension Agricultural Engineer (701)
Unit 3 - Hydrosphere Study Guide Answer Key.
An introduction to Private Water Systems
Methods for the Estimation of Mine Infiltration
Long Island Resiliency & Clean Water Infrastructure Meeting
Andrzej Kotyrba Central Mining Institute Katowice, Poland
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Effects of persistent drought on Lake Mead and the Las Vegas Valley
Storm Water Storage and Treatment
Outline of Presentation
Combined Sewer Overflows in Seattle, WA
Precipitation = Evaporation
Wastewater Facilities Upgrade Project
Mining: Minerals and Coal
Note Pack 40 Chapter 16 Mining and Mineral Resources
Precipitation = Evaporation
Presentation transcript:

Morgantown, West Virginia April 22, 2008 Innovative Mine Water Management Techniques for Submarine Coal Mines of the Sydney Coalfield WVU Mine Drainage Task Force Symposium

Sydney CoalfieldSydney Coalfield Morgantown, WV Sydney, NS

Sydney Coalfield No.2 Sydney CoalfieldSydney Coalfield Port Morien More than 50 u/g mine produced over 500 million tons Left behind voids for more than 50 billion gal of AMD And so began the ……

1B Hydraulic System 1B System1B System Port Morien *Note 1B Shaft location and No.26 location

1B System Geologic Structure A B Glace Bay Syncline Bridgeport Anticline GeologicGeologic +128’ asl -2760’ bsl Port Morien

Stratigraphic Section Through Coal Seams Mined in the 1B Hydraulic System (Section A - B through the Glace Bay Syncline) 100 m 75 m 23 m 30 m 40 m Sea level Glace Bay Reserve Mines Atlantic Ocean A B Hub Seam-2.5 m Harbour Seam-1.8 m Bouthllier-1m Backpit-1m Phalen Seam-2.3m Emery Seam-1.1m Emery Seam Phalen Seam Harbour Seam Hub Seam Sedimentary Section Idealized Geology Between Coal Seams Peat Swamp Lake/bay Lake/bay fill River Channelling Red beds Soil Horizons (Siderite & Calcareous nodules common Peat Swamp +128’ asl -2760’ bsl

Mining Methods within the 1B System Room and pillar Room and pillar with pillar extraction Longwall

Flooding of the 1B System No. 26 lost to a fire In B Shaft pumps – 1750 USgpm are shut down Flooding begins for the 8 directly connected mines Flooding soon follows for the 2 operating mines

Lingan In-rushes Hydrograph – 1B Hydraulic System HydrographHydrograph PARAMETER 1 B Shaft pH7.4 Iron4.1 Alkalinity230 Sulphate951 Conductivity8760 No.26 floods down dip flooding 1B Shaft Mine Water chemistry From 1B Shaft 1991 Pumps prepared in 1B Shaft

SHALE Harbour Seam Atlantic Ocean Phalen Seam Coal Barrier Flooded No. 26 Colliery Lingan Colliery Phalen Colliery Retreat Direction 1100 ft 430 ft Coal Barrier – 1100’ B Emery sea Emery Seam 130 ft Flooding of Lingan Colliery starts – Nov./92 Start the pumps in the 1B Shaft !

1B Discharge 1B Discharge Nov – 10 days of pumping

Lingan in rush and Mine closure Hydrograph – 1B Hydraulic System HydrographHydrograph PARAMETER 1 B Shaft ph3.9 Iron1,600 Alkalinity4.7 Sulphate4823 Conductivity13,800 No.26 floods Phalen effects slow flooding no treatment ! down dip flooding 1B Shaft Flooding rate increases New Mine Water chemistry from 1B Shaft Nov Emergency WTP Phalen closes Pumps prepared in 1B Shaft Upgrade Phalen Pumping Capacity & build WTP

SHALE Harbour Seam Atlantic Ocean Pillars >200’ Barrier Flooded No. 26 Colliery Flooded Lingan Colliery Phalen Colliery Retreat Direction ~300 USgpm/panel 1100 ft 430 ft Emery sea Emery Seam 130 ft Phalen Longwalls receive mine water

Mine water is Getting Close ! In mid 2002, monitoring boreholes along the shoreline intercept bad quality mine water Less than 100 ft to overflow WHERE DO WE GO FROM HERE !

CBDC Developed a Stepped Approach to Deal With Rising Mine Water (1)Late 2002, all focus is on mine water (2)The location, quantity and mine water overflow date was calculated (3) All surface water entrance points sealed (4) Established expert groups to give advice (5) Additional boreholes drilled to sample mine water chemistry and geology in upper areas (6) Began immediate construction of an emergency WTP at the 1B Shaft site

1A Outfall projected to discharge by April 2003 at elev. +6’ asl No.1A Outfall at shoreline

MacKay’s Corner “bootleg” workings and AMD formation BootlegBootleg

1B Shaft WTP 1B Treatment Plant and Settling Pond 1500 US gpm capacity

1A Water Level No. 3 ( ) No. 2 ( ) No. 1A ( ) No. 1BShaft No. 1A Outfall Phalen Seam Outcrop No. 5 ( ) Coal Pillars Coal Pillar Reserve Mines Glace Bay Outline of Mine Workings Dominion No. 1A Outfall Atlantic Ocean B-172 B-171 B-174 B-175 January 2003 – Less than 100’ to overflow No. 1B Shaft PARAMETERS No. 1B Shaft No. 1A B-171 B-172 B-175 pH units Iron (mg/L) 2,0001, < Alkalinity (mg/L) 1< Sulphate (mg/L) 5,9057,0601, Cond (u/cm) 14,4007,7602,5602,8203,350 Boreholes 2001 Boreholes 2002 Suspected infiltration zone hatched Approx 4500 acres (Emergency WTP) Neville Street

CBDC Stepped Approach Continued (7) In January 2003, borehole sampling in upper area of No.5 showed good mine water chemistry Needed to understand the reasons why (8) Intensive study of mine water flow paths, local geology, mining methods and infiltration areas carried out (9) Recommended that an untreated discharge should be established in area of good mine water chemistry

1A Water Level No. 3 ( ) No. 2 ( ) No. 1A ( ) No. 1BShaft No. 1A Outfall Phalen Seam Outcrop No. 5 ( ) Coal Pillars Coal Pillar Reserve Mines Glace Bay Outline of Mine Workings Dominion No. 1A Outfall Atlantic Ocean No. 1B Shaft 1750 USgpm Until 1984 Probable infiltration zone and flow path prior to flooding of 1B System Suspected Infiltration zones hatched Approx 4500 acres Borehole locationBorehole location 80+ years of flushing

ROOM PILLAR COAL ROOF STRATA “LESS access to acid neutralizing roof strata” Limestone No.1A Room and Pillar workings AMD borehole Limestone Mining Method – 92% Room and pillar Only 45% of coal removed

AMD Mining Method – 75% Room and Pillar with pillar extraction Almost 85% of coal removed “MORE access to acid neutralizing strata” No.5 Pillar Extraction Limestone borehole No.5 pillar extractionNo.5 pillar extraction

Establish an Untreated Discharge In Feb 2003 a pilot pumping program was implemented in upper area of No.5 near Neville Street. Very positive mine water chemistry – zero fish mortality – results accepted by regulators. In March 2003, Neville Street upgraded to 3500 gpm capacity, discharge quality remained stable. The flooding of the 1B System was now under control.(mine water level had reached –12’ bsl) The operation of the WTP at 1B Shaft was halted and the plant was put in a state of readiness.

Flooding status halted in March 2003 Only 5% left dry flooded Flooding haltedFlooding halted

Current Pumping Strategy Since 2003 the Neville Street Well field has undergone several infrastructure upgrades. It is now fully automated with 12 x 30 hp submersible pumps providing 5700 gpm at full capacity. Pump startup priority is based on quality at individual wells. Maintain mine water level at –17’ to –19’ bsl. Normally see increase in mine water volumes 24 hours after precipitation events. Increase pumping rate before major precipitation begins.

Neville Street Well Field – July 2007 Neville Street MacKay Corner Glace Bay Reserve Mines B-177 Cadegan Brook N Level Control B-172 B-183 B-185 B-176 B-184 Well Field Discharge B-192 B-193 B-202 B-201 B-200 B-199 B-198 Major Surface Water Infiltration Zone Wetland Phalen Seam Outcrop West wells South Wells

Neville Street Well Field – April 2008 South Wells West Wells Major Infiltration Zones Cadegan Brook

Pump screenPump screen Automation Screen

Pump Start Screen Pump startPump start

Automation Major rain/snow melt events Maint zoneMaint zone

Mine Water Fe/Al Quality Trends

2007 Contour Map - Mine water iron concentrations in mg/l Maintenance zone -17 to –19 ft bsl Monitoring Well Fe concentration 2007Fe concentration 2007

Mine Water Alkalinity/Acidity Trends Alk vs AcidityAlk vs Acidity

Neville Street Well Field - Key Statistics Annual precipitation of 60”, average pumping rate of 2200 US gpm Infiltration rate is estimated to be 2.9 gallons per acre. The total infiltration varies from 450 gpm (summer) to 7000 gpm (rain/snow melt) Currently pumping 1.2 billion US gallons annually without treatment Annual cost to operate the Neville Street Well Field is $ 250k

Neville Street Well Field at Full Capacity Feb NSWF DischargeNSWF Discharge

The Future – Near Term Mine water quality is slowly deteriorating. Assessing adjacent mines for leakage/pillar failure. Drilling additional boreholes for strata information and looking for better quality mine water. Plan to use tracers to better identify u/g flowpaths. Planning for an aerial survey using LIDAR technology to identify surface sinkholes. Construct passive treatment wetland at Neville St. Establish/support research in Mine Water Management at Cape Breton University.

The Future – Long Term Our ultimate goal is to establish a compliant, passive discharge from the 1B Hydraulic System to the marine environment. Work closely with CBU Mine Water Chair to help develop the plan to accomplish this goal. Probable use of active treatment technology to flush the 2 billion gallons of AMD under the land portion of the 1B System before release – how many times will it have to be flushed is the question that needs to be answered.

Thank you