Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.

Slides:



Advertisements
Similar presentations
Activity 1.2.5a Mechanical Efficiency
Advertisements

Fast, Accurate and Reliable Robotic Storage System
Vertical-Axis Wind Turbine Kang Zheng Aaron Peterson Mohd Ramjis.
Advantages of Lattice Towers
John Wloch Wind-Aid Critical Design Review 4/22/2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
OMIS 661 Presentation – Intelligent System Case Caterpillar uses optimization to reduce structural mass while improving structural strength Presenters.
Hydrokinetic Turbine Featuring Variable Flux Generation October 1, 2009 Sean Curran Vanessa Kohler Erik Minnis Michael Perry C. Taylor Peterson Alex Quintal.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Pinwheel Technologies (C3)
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
PDR: 4/10/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
PDR: 2/22/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
ME 495 EV Team 1: Alex and Eric ME 495 EV: Electric Pontiac Fiero Project.
Pratham CAD/CAM Drawings & Component Integration Presenter: Nick Martin Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM:
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
PDR: 3/20/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Concept Design Review Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Customer: FraunhoferAdvisor: Dr. Michael Keefe Mission: To design.
DR2 Structures PDR Structures and Weight Preliminary Design Review October 5, 2000 Presented By: Jeff Rodrian & Chris Curtis Team DR2 Loren Garrison Chris.
Introduction CNC (Computer Numerical Control) Machines are automated machines, which uses programs to automatically execute a series of machining operations.
AUTOMATION & PRODUCTION TECHNOLOGY. PROJECTS Students learned about group dynamics and the Engineering Design Process How can we build the tallest structure.
Manufacturing Systems
Steven Stokes Christopher Van Buren Lee West Robert Williams.
Critical Design Review Wind Turbine with Gearbox
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Design of a Robotic Manipulator for a Wheelchair Gateway Coalition Ohio State University Sinclair Community College Wright State University December.
Team 4 “Flying Wind Turbine” Jason Landry Bryan MacDonald Scott Montgomerie Daniel Pollock Robert Ringrose Dr. Dale Retallack Team Members Supervisor.
General Instructions for “KidWind Light” wind tunnel.
Extra Credit Advanced Assemblies ENGR 1182 Solidworks 7.
Biochar Concrete Roofing Sheets for Nicaragua
Growth Innovations Kite Group Final Project Presentation 6 April 2006 Chris Boven Trever Carnes Brandon Henley Emmanuel Zoubovsky.
[insert WP name] Core concepts and elements [insert author name and photo if necessary]
Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.
Miniature Centrifugal Compressor Development Kevin Finney Ray Zhou Dr. Kapat Dr. Chow October 18, 2002.
Single Stage Centrifugal Compressor Development Kevin Finney Ray Zhou Xiaoyi Li Krishna Murty Jinying Zhu February 21, 2003 Compressor MotorCoupler.
Working With Wind Energy.
Practice CS Project Management Amy McCarty Education Services.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 21, 2008.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 7, 2008.
Synopsis of the Major Project Title of the Project: 6A-P-xx- _____________________________________ _____________________________________________.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review January 31, 2008.
DOOSAN HEAVY INDUSTRY KIM MIN-JUNG O SAE-ROM.
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Riser And Lid Assemblies. Description Risers and Lid assemblies are components designed to provide access and security at grade level to system components,
DESIGN AND FABRICATION OF SPRING LOADED FAN
ME 4182 Mid-Term Presentation The Likus Group 6/21/00 Philip Reale, Group Leader Matt Berrell Justin Disney Anthony Godfrey Gwyneth Smith Lisa Smith The.
1 Company presentation. 2 Corporate Structure o Overview Overview o History History o Key Figures Key Figures o Industries Industries o Mission Mission.
AURA LASERFAB PVT. LTD. An ISO 9001:2008 Certified Company Complete solution provider for METAL FABRICATION & ASSEMBLY.
52 CRANKING SYSTEM CRANKING SYSTEM.
Activity 1.2.5a Mechanical Efficiency
Q Design & Technology Product Design U Processes I Z.
Activity 1.2.5a Mechanical Efficiency
Activity 1.2.5a Mechanical Efficiency Winch Construction Guide
Activity 1.2.5a Mechanical Efficiency
CAD Trainings LEGOOO!!!!.
WELCOME.
Activity 1.2.5a Mechanical Efficiency Winch Construction Guide
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
McMaster linear bearing #6709K180 with guide rail suppressed
Assembly drawings Flóra Hajdu B406
US-HiLumi – Shipping Post Assembly Status
Presentation transcript:

Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008

Last Week’s Action Items  Complete CAD model Add internal components to the base cylinder Show how the main shaft attaches to the system Display placement of guide lines which secure the wind turbine to the ground Describe in detail the blade setup  Finalize the blade manufacturing method Analyze vacuum forming plastic  Have to create mold and it is potentially expensive Bending of sheet metal  Heavy and not easily broken down or carried

Current Status of Concept Status of Design Beginning to manufacture the base unit, the blade mold, and start designing the electronics system Focus on: cost weight size

Blade Assembly

Main Shaft Assembly

Twist Plate Assembly

Fixed Plate Assembly

Gear and Generator Assembly

Twist and Lock Feature

Next Week’s Action Items  Shaft Assembly Huth will attach bearings to the main shaft Arch will attach the gear to the main shaft Leon will assist in attaching load supports to keep shaft in place  CNC Plates for base unit Fraser will generate CNC file for plates Toomey will generate CNC file for brackets Both will utilize the CNC end mill to fabricate  Begin Electronics work Noble will begin constructing the electronics layout

Thank You Questions?