Active Mirror1 Control (PC) Active Mirror1 Control (PC) Central Control (PC) Central Control (PC) Telescope Drive1 Control (PC) Telescope Drive1 Control.

Slides:



Advertisements
Similar presentations
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Advertisements

SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
4 th SONG WORKSHOP Charleston, SC Sep 2011 The Virgin Islands Robotic Telescope James E. Neff College of Charleston & David Morris University of.
2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MINERvA DAQ Software D. Casper University of California, Irvine.
Udine - April 19th Data Check for MAGIC Raquel de los Reyes Universidad Complutense de Madrid (U.C.M.)
DATA BACK-UP ROUTER WEATHER STATION MOUNTCCDSERVICESMOUNTCCDSERVICESMOUNTCCDSERVICES 16 INCH 20 INCH DOME WIDE FIELD PRIMARY PC IMAGES WEATHER DATA.
SL Introduction to Optical Inspection1. Introduction to Optical Inspection Helge Jordfald Sales & Marketing Manager Tordivel AS – Norway.
A. Homs, BLISS Day Out – 15 Jan 2007 CCD detectors: spying with the Espia D. Fernandez A. Homs M. Perez C. Guilloud M. Papillon V. Rey V. A. Sole.
ISUAL Sprite Imager Electronic Design Stewart Harris.
F. Goebel, MPI München, 4 May 2006, Berlin Florian Goebel Max-Planck-Institut für Physik (Werner-Heisenberg-Institut) München for the MAGIC collaboration.
Susanne Kersten, Wuppertal University November 21/22, 2013.
MOTION CONTROL ISAT 303 Typically involves accurate control of distance, speed (angular velocity or both.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
PHOBOS DATA FLOW (1) THE WIRES RHIC fec dmu mercury system event builder event buffer online data logger rcf slow control oracle db with disk TOF & Trigger.
MAL 1 MAL 2 MAL 3 MAL 4 COMMUNICATION LINKS 1.MCP – MAL : VSAT, FHTDMA RADIO, LINE MODEM, HF Radio, Inmarsat 2.CARNATION HUB – MCP: VSAT, Inmarsat 3.CARNATION.
Online & Offline software at H.E.S.S.  The H.E.S.S. Experiment  Data storage & Off-line software  Acquisition software  ROOT Problems/Wishlist ROOT.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
The Trigger Prototype Board Status Marco Grassi INFN - Pisa On behalf of trigger group D. Nicolò F. Morsani S. Galeotti M. Grassi.
UCN-nEDM DAQ DAQ and Slow Control L.Lee 1 July 3, 2013.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Peter Hobson - Brunel University, UK3 July 2003 VPT 4 Tesla testing  An automated characterisation facility based at Brunel has been commissioned to handle.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
The ALICE DAQ: Current Status and Future Challenges P. VANDE VYVRE CERN-EP/AID.
6-10 Oct 2002GREX 2002, Pisa D. Verkindt, LAPP 1 Virgo Data Acquisition D. Verkindt, LAPP DAQ Purpose DAQ Architecture Data Acquisition examples Connection.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
SMT Control System Steward Observatory Faculty MeetingMay 02, 2003 A rizona R adio O bservatory Thomas W. Folkers.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
May 4th 2006R.Mirzoyan: CTA meeting, Berlin The MAGIC Project: Performance of the 1st telescope Razmick Mirzoyan On behalf of the MAGIC Collaboration Max-Planck-Institute.
CKM Data Source System CKM Electronics Group July 2003.
OPERA GENERAL MEETING Gran Sasso, May 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien,
VLVnT09A. Belias1 The on-shore DAQ system for a deep-sea neutrino telescope A.Belias NOA-NESTOR.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
News on GEM Readout with the SRS, DATE & AMORE
PSROC, February 2, 2005 Sun Yat-San University Ching-Cheng Hsu National Taiwan University On behalf of NuTel Group Outline :  Overview of NuTel Experiment.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
GLAST LAT Project CERN Testbeam WorkShop, Pisa, 20 March 2006 David Smith & Denis Dumora VME DAQ 1 The Bordeaux Data Acquisition system
E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart NI-Days 2000, CERN Geneve, 26 October 2000 The Control Architecture for the LHC Dipole Series.
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
CTA-LST Large Size Telescope M. Teshima for the CTA Consortium Institute for Cosmic Ray Research, University of Tokyo Max-Planck-Institute for Physics.
Apparatus to search for optical flashes of astronomical origin Grzegorz Wrochna, Lech Mankiewicz, Rafał Sałański  of the sky.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
62cm 64cm. DAQ status and Plans DAQ –Timing tuning –Which tools to learn (SC, Event monitor, GPIO, MIDAS, DIP, laser, storage, analysis) Plan with beam.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
MicroTCA Development and Status
DOM acceptance and calibration
Preparation for Station Acceptance Test
EMU Slice Test Run Plan a working document.
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
Emanuele Leonardi PADME General Meeting - LNF January 2017
Large CMS GEM with APV & SRS electronics
Photon beamline crates
Example of DAQ Trigger issues for the SoLID experiment
Commodity Flash ADC-FPGA Based Electronics for an
Station 3: Electro – Mechanical – Fluid - Flow
Emanuele Leonardi PADME Weekly Meeting - LNF February 9th, 2018
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
FED Design and EMU-to-DAQ Test
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Auxiliary Devices Weather Station
Presentation transcript:

Active Mirror1 Control (PC) Active Mirror1 Control (PC) Central Control (PC) Central Control (PC) Telescope Drive1 Control (PC) Telescope Drive1 Control (PC) L1 & L2 Triggers (VME crate) L1 & L2 Triggers (VME crate) CCD camera Mirror Drive Camera1 & Calibration1 Control (PC) Camera1 & Calibration1 Control (PC) Lid PLC Cooling PLC LV control PLC RS 485 Calibration settings HV control ADC HV settings ADC DC currents ADC CANBus DAQ1 Control & Online Analysis (multiprocessor PC) Tape library Motors + Rotary Encoders Shaft Encoders In the control house On MAGIC-I Ethernet switch Router The world On MAGIC-II In the control house Pyrome ter Control (PC) Pyrome ter Control (PC) Raw data storage (RAID) Raw data storage (RAID) Active Mirror2 Control (PC) Active Mirror2 Control (PC) Camera 2 Control (PC) Camera 2 Control (PC) MIR & Calibration2 Control (VME crates) MIR & Calibration2 Control (VME crates) DAQ 2 Control (PC) DAQ 2 Control (PC) GRB alert program Auxiliary system Control Auxiliary system Control GPS Rubidium clock SumTrigger (VME crate) SumTrigger (VME crate) Calibration settings Receivers L1 trigger L3 coincidence trigger Domino Calibration Motors + Rotary Encoders Shaft Encoders Mirror Drive CCD camera Weather station LEDs receivers CANBus Discrim. thresh Optical fibers raw Data stor age raw Data stor age RS 232 PLC RS 232 ethernet Optical RS 232 RS 485 VME crates  SCCPs (pixel monitor + lids) Optical PCI Optical fibers LVDS Calibration trigger

Active Mirror1 Control (PC) Active Mirror1 Control (PC) Central Control (PC) Central Control (PC) Telescope Drive1 Control (PC) Telescope Drive1 Control (PC) L1 & L2 Triggers (VME crate) L1 & L2 Triggers (VME crate) CCD camera Mirror Drive Telescope Drive display Camera1 & Calibration1 Control (PC) Camera1 & Calibration1 Control (PC) Camera display Lid PLC Cooling PLC LV control PLC RS 485 Calibration settings HV control ADC HV settings ADC DC currents ADC CANBus DAQ1 Control & Online Analysis (multiprocessor PC) DAQ & OA display Tape library Motors + Rotary Encoders Shaft Encoders In the control house On MAGIC-I Ethernet switch Router The world On MAGIC-II In the control house Pyrome ter Control (PC) Pyrome ter Control (PC) Pyro. display Pyro. display Raw data storage (RAID) Raw data storage (RAID) Active Mirror2 Control (PC) Active Mirror2 Control (PC) Camera 2 Control (PC) Camera 2 Control (PC) MIR & Calibration2 Control (VME crates) MIR & Calibration2 Control (VME crates) DAQ 2 Control (PC) DAQ 2 Control (PC) GRB alert program Auxiliary system Control Auxiliary system Control GPS Rubidium clock SumTrigger (VME crate) SumTrigger (VME crate) DC current storage Calibration settings Receivers L1 trigger L3 coincidence trigger Domino Calibration Motors + Rotary Encoders Shaft Encoders Mirror Drive CCD camera Weather station LEDs receivers CANBus Discrim. thresh Optical fibers AMC display CC display DAQ display MIR display raw Data stor age raw Data stor age Camera display drive display AMC display RS 232 PLC ethernet RS 232 RS 485 VME crate  SCCPs LIDs cooling Optical PCI

Ethernet switch Ethernet switch Telescope Drive1 Control (PC) Telescope Drive1 Control (PC) Camera1 & Calibration control (PC) Camera1 & Calibration control (PC) DAQ1 control & Online Analysis (PC) DAQ1 control & Online Analysis (PC) Active Mirror control1 (PC) Active Mirror control1 (PC) Pyro_ meter control Pyro_ meter control L1 & L2 triggers (VME crate) L1 & L2 triggers (VME crate) Sum Trigger1 (VME crate) Sum Trigger1 (VME crate) Telescope Drive2 Control (PC) Telescope Drive2 Control (PC) Camera2 control (PC) Camera2 control (PC) DAQ2 control (PC) MIR control (PC) Active Mirror control1 (PC) Active Mirror control1 (PC) Receivers L3 trigger (VME) L3 trigger (VME) L1 trigger (VME) L1 trigger (VME) Receivers (VME) Receivers (VME) Domino Calibration Shaft Encoders Motors + Rotary Encoders CCD camera Mirror Drive starguider camera Calibration settings HV settings ADC HV control ADC DC currents ADC Cooling PLC LV control PLC LID PLC

Ethernet switch GPS RS 485 Cooling PLC RS 485 Calibration settings HV control ADC CANBus Motors + Rotary Encoders In the control house On MAGIC-I LEDs Discrim. thresh PLC RS 485 CCD camera Mirror Drive Lid PLC LV control PLC HV settings ADC DC currents ADC Shaft Encoders CANBus RS 232 Active Mirror1 Control (PC) Active Mirror1 Control (PC) Telescope Drive1 Control (PC) Telescope Drive1 Control (PC) L1 & L2 Triggers (VME crate) L1 & L2 Triggers (VME crate) Camera1 & Calibration1 Control (PC) Camera1 & Calibration1 Control (PC) DAQ1 Control & Online Analysis (multiprocessor PC) Tape library Pyrome ter Control (PC) Pyrome ter Control (PC) Raw data storage (RAID) Raw data storage (RAID) SumTrigger (VME crate) SumTrigger (VME crate) receiver s Optical fibers Motors + Rotary Encoders Shaft Encoders ethernet Central Control (PC) Central Control (PC) Router The world On MAGIC-II In the control house Active Mirror2 Control (PC) Active Mirror2 Control (PC) Camera 2 Control (PC) Camera 2 Control (PC) MIR & Calibration2 Control (VME crates) MIR & Calibration2 Control (VME crates) DAQ 2 Control (PC) DAQ 2 Control (PC) GRB alert program Auxiliary system Control Auxiliary system Control Rubidium clock Calibration settings Receivers L1 trigger L3 coincidence trigger Domino Calibration Mirror Drive CCD camera Weather station LEDs raw Data stor age raw Data stor age RS 232 Optical RS 232 VME crates  SCCPs (pixel monitor + lids) Optical PCI Optical fibers Calibration trigger

Cooling PLC RS 485 Calibration settings HV control ADC CANBus Motors + Rotary Encoders In the control house On MAGIC-I LEDs Discrim. thresh PLC RS 485 CCD camera Mirror Drive Lid PLC LV control PLC HV settings ADC DC currents ADC Shaft Encoders CANBus RS 232 Active Mirror1 Control (PC) Active Mirror1 Control (PC) Telescope Drive1 Control (PC) Telescope Drive1 Control (PC) L1 & L2 Triggers (VME crate) L1 & L2 Triggers (VME crate) Camera1 & Calibration1 Control (PC) Camera1 & Calibration1 Control (PC) DAQ1 Control & Online Analysis (multiprocessor PC) Tape library Pyrome ter Control (PC) Pyrome ter Control (PC) Raw data storage (RAID) Raw data storage (RAID) SumTrigger (VME crate) SumTrigger (VME crate) receiver s Optical fibers Motors + Rotary Encoders Shaft Encoders ethernet Central Control (PC) Central Control (PC) Router The world On MAGIC-II In the control house Active Mirror2 Control (PC) Active Mirror2 Control (PC) Camera 2 Control (PC) Camera 2 Control (PC) MIR & Calibration2 Control (VME crates) MIR & Calibration2 Control (VME crates) DAQ 2 Control (PC) DAQ 2 Control (PC) GRB alert program Auxiliary system Control Auxiliary system Control Rubidium clock Calibration settings Receivers L1 trigger L3 coincidence trigger Domino Calibration Mirror Drive CCD camera Weather station LEDs raw Data stor age raw Data stor age RS 232 Optical RS 232 VME crates  SCCPs (pixel monitor + lids) Optical PCI Optical fibers Calibration trigger