Dounreay Nuclear and Chemical Land Contamination.

Slides:



Advertisements
Similar presentations
Swiss Federal Nuclear Safety Inspectorate (HSK) Nuclear Waste Management in Europe – and the Swiss Model EPP-ED Hearing on the Future of Nuclear Waste.
Advertisements

Regulation of Low Level Waste Management
Prepare Strategic Business Cases for NDA Consolidate nuclear materials at Sellafield –Work underway with Sellafield Ltd. –Developing final business case.
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
New Nuclear Build - Economic Regulation? Gregg Butler Director: Integrated Decision Management Ltd Professor of Science in Sustainable Development, University.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Garfield graphics are copyrighted and reproduced with kind permission of PAWS Inc. All rights reserved Nuclear Power – Safety (Part 1)
Waste Management System in Egypt Owner (Generator) Regulator RWM Operator Justification Minimization Segregation Transportati on Treatment Conditioning.
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
By Chris Ford and James Hughes ( ) ( )
Civil decommissioning market – an update Presented by Ron Gorham Head of Supply Chain Development and Commercial Relationships.
Research and Development in the NDA The UK National Cleanup Programme Neil Smart Nuclear Research Coordinator, NDA.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Remediation of Hanford Plutonium Site Natalie Grenz Camille Azencott 9 th March 2007 University of Nottingham School of Civil Engineering Environmental.
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
Decommissioning of Nuclear Power Plants Case Study: Dounreay Nuclear Facility Case Study: Dounreay Nuclear Facility Samuel Chapman Heriot-Watt University.
Legacy Waste Retrieval And Treatment Processing Methods At RSRL Harwell Site Author : Marc Rigby Presented by : Malcolm Adam 28 th May 2009.
UK Nuclear Policy Andrew Beirne
CH/1 © Dr. Christian Hicks and Dr Tom McGovern An analysis of the impact of the restructuring of the UK civil nuclear industry on tier 1 and tier 2 suppliers.
Nucular Waste A Technical Analysis Ian Baird 5/12/08.
The UK Nuclear Market. Paul Lester CEO Lord Mandelson Secretary of State for Business, Innovation and Skills.
Hydraulic Fracturing 101. What is Hydraulic Fracturing? Hydraulic fracturing, or “fracking”, is the process of drilling and injecting fluid into the ground.
The Future of the Nuclear Power Industry in the UK and Implications for the South West Peter Higginson Technical & Safety Manager Hinkley Point B Nuclear.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
UK Cleanup Market Overview A Strategic approach to Cleanup & Hazard Reduction Nov 2010 Marcus Mackay mercury stone.
BT Fleet Mobile Generators BT’s required compliance following on from the Edinburgh Oil spillage incident and SEPA actions. Scottish Water Environment.
Implementing NDA’s Strategy - a year on Update to NuLeaf September 2012 Bill Hamilton, NDA Head of Stakeholder Relations.
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
Jhon Carilli Low-Level Radioactive Waste (LLW) Activity Lead
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
NDA PhD Bursary Waste Packaging and Storage Theme Richard Guppy, RWM Ltd Sean Morgan, Sellafield Ltd 17 th September
Renewable Energy Nov 19. Wind Power Vertical axis machine Horizontal axis machine.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
NDA PhD Bursary Land Quality Nick Atherton, Sellafield Ltd Richard Short and Bill Thompson, Dounreay Site Restoration Ltd 29/09/15 1.
Nuclear Decommissioning in the UK Presented by Chris Jones.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Regulatory Framework for Uranium Production Facilities in the U.S.
Chapter 20 Nuclear Energy and the Environment. Nuclear Energy –The energy of the atomic nucleus Nuclear Fission –The splitting of the atomic nuclei Nuclear.
Hydraulic Fracturing Tom Carr, Lauren Dynes, and Pete Strader.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
International Atomic Energy Agency Reprocessing, Waste Treatment and Disposal Management of Spent Nuclear Fuel Seminar on Nuclear Science and Technology.
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
Non-Renewable Energy SJCHS. Energy Nonrenewable energy: Fuels that take 100’s or 1000’s of years to be replaced Usually are mined or extracted from the.
Non-renewable and Renewable Resources Coal, Nuclear, Natural Gas, Oil, Wood, Wind, Solar, Geothermal, Solar-Hydrogen.
The Resource Conservation and Recovery Act of 1976 and 1989 (RCRA) Alex Chenault Period 4.
Environmental Pollution -any addition of undesirable substances to the soil and air, and both surface and groundwater by human activities -can spread far.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
Nuclear Energy and the Environment. Current Role of Nuclear Power Plants Worldwide Worldwide 436 power plants 436 power plants 17% of electricity 17%
Hydraulic Fracturing: FRACKING. Steps: The well is drilled deep below the aquifer to the shale, then drilling continues horizontally Charges are set.
THREE METHODS OF OBTAINING FUEL FROM THE EARTH 1)HARVESTING- PEAT, WOOD, CORN, SUGARCANE ARE USED FOR BIOMASS ENERGY GENERATION ARE USED FOR BIOMASS ENERGY.
Presented By RENJINI CHANDRAN. The nuclear wastes are radio- active substances which are released from atomic reactors of nuclear power stations. When.
Generations of Opportunity By Rick Perley. If selected for construction of a repository, benefits include:  Between $16 - $24 billion in direct investment.
PhD Bursary Scheme Rick Short, Research Manager 1
Environmental Cleanup Program Status
TRADITIONAL ENERGY Key Vocabulary: -Energy -Wood -Oil -Coal Mining
Hydraulic Fracturing 101.
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Janet R. Schlueter Senior Director, Radiation and Materials Safety
NDA Draft Strategy.
Nikisi Lesufi Senior Executive Chamber of Mines
Handling of Future Human Actions in the safety assessment SR-Site
Presentation transcript:

Dounreay Nuclear and Chemical Land Contamination

Background Site on north coast of Scotland set up in 1955 as UK’s centre of fast reactor development Last reactor ceased operation in 1994 Fuel reprocessing ended in 1996 Fuel fabrication ended in 2004 Construction, demolition and waste management on going One of the most complex nuclear clean up challenges in the world

Dounreay Site Restoration Ltd DSRL are the site licence company responsible for the closure programme of the site Site is owned by the Nuclear Decommissioning Authority (NDA) who contract DRSL to manage the site

Main Environmental Problems 65m deep shaft containing intermediate level waste is contaminating some groundwater Fragments of irradiated nuclear fuel were discharged into the sea during reprocessing in 1960s and 70s 18,000 cubic metres of radiologically contaminated land, and 28,000 cubic metres of chemically contaminated land Large amount of highly active waste and intermediate level waste in storage Large amount of uranium and plutonium still on site Site is threatened by coastal erosion

Shaft Vertical shaft built in 1950s to construct a low active effluent discharge tunnel In 1958 authorisation given for the disposal of unconditioned intermediate level radioactive wastes Hydrogen explosion in the shaft in 1977 caused severe damage to superstructure - material consignments to the shaft ceased Decision to empty shaft made in 1998

Shaft Clean-up First phase of decommissioning completed in 2008 – Hydraulic Isolation Grouting of rock fissures reducing flow of groundwater through shaft 400 boreholes drilled into rock and fine grout injected under pressure Water volume reduced from 350m 3 /day to 12.7m 3 /day Water level in shaft maintained below sea level by daily pumping of water Reduces amount of water that can flow through the shaft and contaminate the rock on the seaward side After grouting volume of pumped water reduced from 15m 3 /day to 1.3m 3 /day

Success of Hydraulic Isolation Highly Commended at Ground Engineering Awards 2009 Received Ground Engineering Award and Exceptional Performance Award at the Construction News Specialists Awards 2009 Received Civil Engineering Award at British Construction Industry Awards 2009 “an extraordinarily innovative and complex project delivered with extreme care, confidence and total team collaboration. “

Future Shaft Clean-up Plans Next stage involves removal, treatment and storage of waste Concept designs for waste retrieval, treatment and storage facilities In March 2010, DSRL announced a delay to the construction of these facilities Retrieval of the waste is unique among nuclear decommissioning around the world

End State of Shaft Initial Options: Near Field (1m radius): Natural attenuation; removal of rock; chemical clean; passive out-diffusion; surface seal; local back-flush; local chemical back-flush Far Field (1-300m radius): Natural attenuation; removal of rock; flushing with water; flushing with chemicals; in-situ immobilisation Decision will be assessed by BPEO process

End State of Site “a restored site, with early release of land once decommissioning was complete “ Some contaminated ground will be remediated by the end of decommissioning in Other contamination will be left to decay naturally in the ground through to 2300 Estimated cost of decommissioning - £2.6bn

Thank you for listening This case study highlights the need for safe nuclear waste management policies particularly for the new generation of nuclear power stations.