WGB2-36 Page 1 Conseil International des Grands Réseaux Électriques International Council On Large Electric Systems Guide for Application of Direct Real-Time.

Slides:



Advertisements
Similar presentations
SPE Getting the Most out of Networked Drillstring Petersen, Sui, Frøyen, Nybø Center for Integrated Operations in the Petroleum Industry & SINTEF.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
Thermoflow, Inc. TOPS stands for Thermoflow’s Optimization System and is a general purpose optimizer for use with Thermoflow’s core programs. TOPS runs.
GREDOR - GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables Real-time control: the last safety net Journée de présentation.
Real-Time Transmission Congestion Management & Market Effects
ULg : Pr. J.L. Lilien WISMIG meeting, Arlington, USA, May 2008 New trends on real time measurement on power lines : application to ampacity, aeolian vibrations.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
ECE 333 Renewable Energy Systems Lecture 13: Per Unit, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
1 Seventh Lecture Error Analysis Instrumentation and Product Testing.
SENSORS AND TRANSDUCERS
Lecture 8 Transmission Lines, Transformers, Per Unit Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
BASIC CONSIDERATIONS IN DESIGN  The aim of the design is to completely obtain the dimensions of all the parts of the machine to furnish the data to the.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Demand Response – A New Option for Wind Integration ?
Oncor Electric Delivery Company LLC Smart Grid Demonstration Project – Dynamic Line Rating (DLR) June 25, 2010 Justin Johnson ERCOT Reliability Operations.
Dynamic thermal rating of power transmission lines related to renewable resources Jiri Hosek Institute of Atmospheric Physics, Prague, Czech Rep.
Turkish Power System Overview March 2012
2015 IEEE Rural Electric Power Conference Asheville, North Carolina.
Motor Testing (Motor Only)
Sai Moorty ERCOT Integration Options into ERCOT systems.
Perfect Competition *MADE BY RACHEL STAND* :). I. Perfect Competition: A Model A. Basic Definitions 1. Perfect Competition: a model of the market based.
RELIABILITY and RENEWABLES: Two Case Studies Using the SuperOPF Tim Mount Department of Applied Economics and Management Cornell University
BsysE595 Lecture Basic modeling approaches for engineering systems – Summary and Review Shulin Chen January 10, 2013.
TWENTIES : EU project Massive integration of renewable T&D Smartgrids How cable dynamics may help ? ISCD Shanghai- October 18th, 2011 J ean-Louis.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
How to use existing power lines to evacuate twice as much wind power ? Huu-Minh Nguyen (University of Liège), Jean-Jacques LAMBIN (ELIA) and Jean-Louis.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Gestionnaire du Réseau de Transport d 'Electricité 2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation Experiences and practices.
Power and Power Measurement ENGR 10 – Intro to Engineering College of Engineering San Jose State University (Ping Hsu and Ken Youssefi) 1 Introduction.
ECE 7800: Renewable Energy Systems
Dynamic Thermal Ratings for Overhead Lines Philip Taylor, Irina Makhkamova, Andrea Michiorri Energy Group, School of Engineering Durham University.
Climate, Air Quality and Noise Graham Latonas Gartner Lee Limited RWDI Air Inc.
Announcements Please read Chapter 3; start on Chapter 6
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
CBE 150A – Transport Spring Semester 2014 Radiation.
A Closer Look at Energy Demands: Quantification and Characterisation.
Module 1: Measurements & Error Analysis Measurement usually takes one of the following forms especially in industries: Physical dimension of an object.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
CE Urban Transportation Planning and Management Iowa State University Calibration and Adjustment Techniques, Part 1 Source: Calibration and Adjustment.
Goal Parameters How Tools Results Increasing Revenues by Optimizing Generation Relative to PJM Forecasted Price Signals.
SHP – Columbia University
Development of a new Building Energy Model in TEB Bruno Bueno Supervisor: Grégoire Pigeon.
Chapter # 8 Mechanical Design of Overhead Lines.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
Rick Walker Evaluation of Out-of-Tolerance Risk 1 Evaluation of Out-of-Tolerance Risk in Measuring and Test Equipment Rick Walker Fluke - Hart Scientific.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
RENEWABLES AND RELIABILITY
Contents Introduction Focus area Wind scenarios
MECH 373 Instrumentation and Measurement
Market Architectures Integrating Ancillary Services from Distributed Energy Resources Olivier Devolder Head of Energy Group N-SIDE.
Comparison of THREE ELECTRICAL SPACE HEATING SYSTEMS IN LOW ENERGY BUILDINGS FOR SMART LOAD MANAGEMENT V. Lemort, S. Gendebien, F. Ransy and E. Georges.
Overview of New Control Room Desk
Center for Advanced Life Cycle Engineering (CALCE)
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
System Control based Renewable Energy Resources in Smart Grid Consumer
UIC 518.
TBM thermal modelling status
Module 4 Smart Grid Implementation Issues
RE Grid Integration Study with India
GENESYS Current Functionality
Presentation transcript:

WGB2-36 Page 1 Conseil International des Grands Réseaux Électriques International Council On Large Electric Systems Guide for Application of Direct Real-Time Monitoring Systems WGB2-36

WGB2-36 Page 2 The dawn of a new era for power systems Recent changes in power systems generation (renewables, intermittent, distributed), T&D (nodal pricing, market coupling in Europe, intra-day market) and « prosumers » (DSM, EV) push all actors at the dawn of a new era in Power systems. Potential of dynamic line rating in that respect : - connect more renewables on existing T&D - more capacity intra-day when available (>50%)

WGB2-36 Page 3 OBJECTIVE of the CIGRE brochure To provide guidance for TSO’s about RTM systems : 1) how can they be used to increase the reliability and the economics of system dispatch; 2) How to select appropriate RTM equipment N.B. Only deals with direct monitoring systems.

WGB2-36 Page 4 REAL TIME MONITORING The real-time rating of the line is a function of position of the conductor in space which in turn, affects safety of the public as well as the integrity of the line. This position is determined by the sag of the conductor. Sag Clearance required

WGB2-36 Page 5 REAL TIME MONITORING Sag is a function of the conductor temperature (average between core and surface all along a span or section), the conductor construction and the line tension. Devices that determine RTM rating evaluate the sag and thus the critical clearance along the line.

WGB2-36 Page 6 DETERMINING LINE RATING step 1 : determine effective weather conditions The monitored parameter (tension, sag, clearance, wind vibration, angle of inclination or spot temperature) is converted to conductor mean temperature by means of a model). The calculated real-time mean conductor temperature is then combined with the air temperature, solar heat input, wind speed, wind direction and line current in TB 207 to calculate effective weather data (including the perpendicular wind speed).

WGB2-36 Page 7 Example of “Effective perpendicular wind speed ” Effective weather data are weather data that justify the field measurement in critical spans.

WGB2-36 Page 8 DETERMINING LINE RATING step 2 : evaluate ampacity of the line Taking into account some weather persistence and thermal time constant of the conductor, the ampacity is evaluated for the next 10 to 60 minutes based on the most recent real-time measurements and their trends. The worst rating condition (either maximum temperature or maximum sag/minimum clearance) has to be taken into account if they give different answers (which is generally the case after some years of line operation).

WGB2-36 Page 9 SENSOR OUTPUTS SENSOR ALGORITHMS STATE CHANGE EQUATION CALIBRATION CONDUCTOR “MEAN“ TEMPERATURE HEAT BALANCE ALGORITHM BASED ON CIGRE TB207 EFFECTIVE WEATHER DATA -Perpendicular wind speed - Ambient temperature - Solar heating SENSOR ALGORITHMS WORST CASE AMPACITY MAX SAG MAX TEMP. LINE CURRENT SINGLE-SPOT MEASURED WEATHER DATA CONDUCTOR DATA AS DESIGNED LINE DATA SECTION REPEATED FOR EACH LINE SECTION FLOW CHART FOR RATING

WGB2-36 Page 10 Existing RTM DEVICES and their principle of operation ABOVE : inclination; BELOW: camera and target

WGB2-36 Page 11 MEASURING DEVICES (CONT) : Conductor replica; 2: Conductor vibration frequency; 3: Sonar; 4: tension

WGB2-36 Page 12 ERRORS Errors in conductor data Errors in section topological data, span length error Errors on ruling span concept: hypothesis behind ruling span are numerous and includes constant data (weather, conductor temperature and conductor data) and no horizontal tension supported by suspension insulators Varying weather data along span/section Nonlinear behavior of conductor Current can vary by 2-3% over line length. Emissivity 2-3% rating error if 0.1 error in assumption. Solar assumptions can make a large difference to rating. The maximum error in potential ampacity that is permissible for operators is 10%. The errors sources are :

WGB2-36 Page 13 ERRORS MITIGATION redundancies in measurement repeated calibrations weather data measured at conductor level conductor replica learning process based on observations, experience Apply different sag-tension relationship methods, like detailed in CIGRE brochure N° 324. [4] Apply safe buffer estimation Apply conservative assumptions in ampacity evaluation Back up observations (for example certifying ampacity margin when it comes close to zero)

WGB2-36 Page 14 ACCURACY REQUIREMENTS Conductor vibration frequency sensor o Take care of sampling rate (adapted to max permissible sag error). Temperature sensors o Take care to avoid heat sink and variable wind angle effects Tension sensor or spot position in space o Take care of conductor/span data

WGB2-36 Page 15 NUMBER OF SENSORS The line length. The number of sensors will not be the same for a 50 km line and for a 5 km line, but the number of the long line will not be 10 times the number of the short one. The surroundings: urban or rural areas, crossings with main roads, commercial areas…. The homogeneity or not of the climatic environment: o § line orientation with predominating wind, o § existing wind corridors, o § forest crossings, o § difference of altitude The number of critical spans in every section of the line. Typically 2 by section

WGB2-36 Page 16 INFORMATION TO THE OPERATOR (HMI) line load (MVA or Amp). The line load has to be refreshed very regularly, typically every 10 s real-time rating (MVA or Amp.) count down or remaining time (min.). This value is displayed if the time is less than 1or 2 hours per example. Otherwise the time can be considered as infinite. A curve giving remaining time vs line load can be displayed to help the operator to verify that the prepared strategies in (N-1) contingency are appropriate.

WGB2-36 Page 17 EXAMPLE OF DISPLAY

WGB2-36 Page 18 AMPACITY CURVES

WGB2-36 Page 19 CASE STUDIES Actual case studies indicated benefits as follows: o Delay in construction of new substation (CEMIG) o Delay in strengthening of 138kV line (CEMIG) o Increased line capacity for renewable generation. (ELIA and RTE) o AEP increased capacity required for wind generation o KCPL (USA) 16% increase in line rating for 167 hours

WGB2-36 Page 20 FINDINGS FROM ELIA AND RTE intra-day ampacity forecast using RTM (20% over static rating, up to 4 hours in advance) Conductor current = actual conductor load as measured during one day The bold red, green and blue lines show if the target is ok either for 1 or 4 hours (green), or ok for a shorter period (blue), or not ok (red). The RT ampacity curve (determined in real time by RTM sensor) on the same day validates the forecasting afterwards 20% over static rating Static rating

WGB2-36 Page 21 FINDINGS FROM AEP line capacity versus wind farm generation Red line : previously constrained wind farm output (static rating) (173 MVA) Reference black line : wind farm generation during the period of observation Lowest observed additional line capability with RTM in service (blue) (+ 24%) average power line real time rating as evaluated by RTM (green) (+35% with 2% curtailment)

WGB2-36 Page 22 BENEFITS OF RTM Contingency management o Allow more time for operators to make decisions. Deferral or elimination of capital expenditure Dispatch of generation during capacity deficiencies. Mitigation of reliability concerns Reducing wind power curtailment Use of higher daytime ampacity Reduced congestion charges (more efficient optimal generation dispatching in nodal and interconnected market)

WGB2-36 Page 23 CONCLUSION RTM systems ensure the line will not contravene the statutory (clearance) or annealing (conductor temperature) limits imposed. It does not permit the line to run “hotter” than designed but will allow operators to make use of the better than “as design” conservative weather conditions to increase the load above static rating. Direct RTM (except temperature sensor) may detect any excessive sagging