TEAM NORMS  NO SLACKING  Work hard  Ask questions if needed  Turn in work on due date.

Slides:



Advertisements
Similar presentations
Foundations of Technology Engineering Design Journal
Advertisements

By: Stefano Hernandez Joseph Gonzalez and Simon Valdez.
DECEMBER 7, 2011 HOUSING DECISIONS. AGENDA Review Decision Making Model Vocabulary Marketing strategies that affect our spending Housing alternatives.
Ms. Hahn’s Classroom Procedures
 Team Norms  Norm#1- Treat the members of the team with the upmost respect and how you want to be treated.  Norm#2- Team members need to be notified.
Ms. Vandever’s class Rules and Procedures
DECISION MAKING Make fantastic decisions using the DECIDE process:
Welcome to our classroom
Mechanical Gears Team Project. Teams You will be grouped into teams of four. Each team will have a Team Leader, Engineer, Graphic Designer, and Logistician.
By: Ryan Rodriguez, Mario Garcia, and Jesus Macias.
By Eric Berard, Daniel Ontiveros, and Jacob Brasch.
Engineering H193 - Team Project Gateway Engineering Education Coalition Final Report – An Overview Week 4 Day 2.
Bicycle Storage in Savannah, GA Adam Blount Will Crowe Nicholas Dodson Scy Fuller Michael Noto Jordan Wiggins Winter
The Bike Rack By: Cameron, Grace, Tony and Steven.
Chapter 21 Renting a Residence.
Team Spl it Trevor Noel Chris Meraz Josh Cooper Christian Marshall.
Team Split. Team Norms (Day 1 - 4/15, Day 2 - 4/18) Timeline (Day 1 – 4/21, Day 2 4/19) Design Brief (Day 1 – 4/21, Day 2 – 4/19) Team member evaluations.
Team Symmetric By: Samantha Manjarrez, Allen Yang, Dylan Salopek.
IED Activity 9.3 Virtual Design Challenge Speaker Mount System
Goal Setting Mr. Doroski.
Luis Ruiz, Connor Pederson, Jacob Mullican, Andrew Thatcher.
Dog organizer By: Stephanie Clark Sarah Kim and Gracie Reber.
Team Horizontal.  Engineering Notebook daily entries  Day 1 entry dates: 4/15, 4/21, 4/25, 4/27, 4/29, 5/3, 5/5, 5/9  Day 2 entry dates: 4/18, 4/19,
Case #101: The Case of the Missing USB Drive. Mrs. Yuen has been borrowing Mrs. Jeremica’s USB drive to teach Forensic Science this year. It contains.
By: Jordan Glaze, Luis Chavirra, Garrett Hendrix.
Polar bears and penguins. Alice looked out her window and saw some penguins and polar bears having a luau in her front yard. She saw 12 animals altogether.
Sometimes Teachers Change. I go to school at ________________________. There are many people that help me learn at school. They are my teachers. Sometimes.
Team Here Comes Treble By: Erin Tibbetts and Ryan Schnepper Project name: Music to Your Ears.
The Traveler Your New Hall Pass. Why have we made a change? The purpose of the Traveler is to have students take responsibility for the mechanics associated.
What is inside an animal cell?
LEARNING CONTRACTS Teachers who want to try using contracts need to keep a few things in mind.
Virtual Design Project. By: Angel Ordunez, Edgar Gonzalez, Rey Sanchez.
The Design Process.
Mrs. D. Smith-Martinez English Room 826. What We Will Cover Mission Statement Who’s Who Team Policies Homework Policy/Grading List of Materials What (not)
Coffee Table Idea By: Edgar Campos.
Project Citizen Day 3 Whole Class Model. Stinger 1. The question I was assigned last time was: 2. The answer is: 3. I found it here: 4. I brought my article?
Security Procedures Assignment Two What do I have to do??
We asked our counsellor for help about this topic.
Team Offset Locker By: Isaac Arellano Dylan Conter Dylan Conter Marco Pando 8 Slides.
 1. Create the Team Norms  2. Create the Timeline  3.Decide on a Design Brief  4. Team Evaluations  5. Design Brief  6.Design a PowerPoint Presentation.
Meet Team Colt Erin TibbettsRyan Schnepper. Team Colt Client  Sarah can only hear out of one ear.  Speakers are available in the classroom.  She is.
By: Ean Smith Parker Murphy Wyatt Jurney.  Virtual Design Checklist Project Due Date: May 11th (Day 1) or May 10th (Day 2) 1. Engineering Notebook daily.
By Chris Perini STORING GREEN TRANSPORTATION. MANY PEOPLE (ESPECIALLY ON CAMPUS) USE BICYCLES FOR TRANSPORTATION Cities Here on campus.
Search Apartments For Rent In Dothan Al Based Your Income If you are part of the portion of people who can not still manage to buy their desire home, then.
Labs Unit 1 - Science. Labs  We will be doing many labs in class.  Labs are completed in groups of 3 or 4.  Your group is formed by either your entire.
Rachael Sykes, Jake Deffibaugh, Kyle Emerson, Ayagoz Abdrakhmanova
Unit 5 The American Revolution Timeline
Handout 5: Storing information
Welcome to Mrs.Yang.
New Engineering Design Process
Things To Avoid: 1-Never your password to anyone.
What kind of property can people rent to earn an income?
Welcome, students! Ms. Malone Technology Lab 
Intro. to Engineering Design
Design Brief A furniture manufacturer has asked you to produce designs for a games console storage device. All of your designs must store/hold the console.
Infinitives.
Your journey in Language Arts
Foundations of Technology Engineering Design Journal
ME 280 Lab Final Project Begins March 20th for sections 4 and 5, and March 21st for sections 1, 2 and 3 Due April 17th for sections 4 and 5 and April 18th.
Foundations of Technology Engineering Design Journal
Science Fair Project --- Log Book.
Form 3: Statement of Condition
Computer Desk Shaquan West.
Emergency Supply Organizer
ME 280 Lab Final Project Begins March 22nd for sections 4 and 5, and March 23rd for sections 1, 2 and 3 Due April 19th for sections 4 and 5 and April 20th.
October 25, 2012 You will receive an online textbook “sticker” for your agenda today. (Ms. Vegners will tape it in since she didn’t have actual stickers.)
With Listening.
Infinitives.
What’s your nationality? Where are you from?
Creating a Professional Portfolio
Presentation transcript:

TEAM NORMS  NO SLACKING  Work hard  Ask questions if needed  Turn in work on due date

CONSEQUENCES  Warning  Tell the teacher  Take you out of the group

TIME LINE  1.Team norms due 4/18-dyshawn Hamilton-Done  2.Timeline due 4/19-dyshawn Hamilton-Done  3.Design brief due 4/19-dyshawn Hamilton-Done  4.Evaluations due 4/26 and 5/6-dyshawn Hamilton-Jake-Lucas-Done  5.Sketches in notebook due 4/20!!!-Jake- Dyshawn- Lucas-Done  6.IDW's due 5/2- Jake-done  7.Powerpoint 5/6- Dyshawn Hamilton-Done  8.idw creations D1 5/3 D2 5/2-Done  9.idw of exploded view D1 5/3 D2 5/2-Done  10.power point presentation D1 5/9 D2 5/6-dyshawn- Jake- Lucas-Done

DESGIN BRIEF  Client:  Ms. Whitmore  Designer:  Dyshawn Hamilton. Lucas Ruttle. Jake Byrd  Problem Statement:  Ms. Whitmore is a college student who uses her Mongoose XR250 mountain bike for all of her transportation needs. Her apartment complex does not provide a safe place for her to store her bike, which is currently kept in her small kitchen until she can find an alternative means.  Design Statement:  Design a bicycle storage system that will allow Ms. Whitmore to safely store her bicycle inside her apartment in such a way that the bicycle is easily accessible, but does not take up space in the major living areas of her apartment.  Constraints:  System must not cause damage to the walls or ceiling, which would cause Ms. Whitmore to lose her $600 deposit.

Animation

Animation IDW

Main Part IDW

Lock Part #1 IDW

Lock Part #2 IDW