Tiered Frequency Response Service Workshop On Demand-Response Programs in the ERCOT Market September 15, 2006 Mark W. Smith Smith Trostle LLP.

Slides:



Advertisements
Similar presentations
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
1 Shams Siddiqi, Ph.D. Representing LCRA and Rates and Resources Council (RRC) consisting of 31 NOIEs serving Central Texas TAC.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
DSWG Update to WMS May 17, DSWG Goals Update.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
ERCOT Emergency Load Response Sam Jones Paul Wattles Steve Krein PUC Demand Response Workshop Sept. 15, 2006.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
RTWG Report to TAC August 5, 2010 Howard Daniels.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Energy Optimization Plans 2011 Biennial Review Pre-Filing Update Rob Ozar, Manager Energy Optimization Section March.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Standards Review Subcommittee Update August 17, 2010.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Unit-Specific Bid Limits based on Modified Generic Cost.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
ERS Update – DSWG Presentation September 21, 2012.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
14 Minute Ramp Period Testing Workshop June 30, 2009.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Operations Update ERCOT Board Meeting March 18, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Appeal of PRS Rejection of NPRR 667
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
The New Texas Wholesale/Retail Market
Presentation transcript:

Tiered Frequency Response Service Workshop On Demand-Response Programs in the ERCOT Market September 15, 2006 Mark W. Smith Smith Trostle LLP

What is Tiered Frequency Response Service (TFRS)? A proposed load resource service giving ERCOT a load resource pool that: ●Has a binding 24-7 year-round contractual performance obligation ●Provides instantaneous interruptibility at very high frequency set points ●Provides staggered instantaneous interruptibility at very high frequency set points ● Has no limit on number or duration of interruptions necessary to preserve system reliability ● Has no limit on number or duration of interruptions necessary to preserve system reliability

Smith Trostle LLP What is TFRS? (Cont’d) ● Is additive, non-duplicative of, and complementary to, other load resources available to ERCOT operators ● Provides a lower-cost substitute for the addition of new peaking units ● Provides a lower-cost substitute for the addition of new peaking units ● Avoids the impacts on the environment of power plant construction and operation ● Avoids the impacts on the environment of power plant construction and operation

Smith Trostle LLP Purpose of TFRS Proposal ● To implement the 2001 PUC directive that: -Load resources that provided reliability services prior to market restructuring have reasonable opportunities to continue to participate -A framework be established for even greater participation by load resources in the future ● To enhance the range of tools available to ERCOT for maintaining system reliability

Smith Trostle LLP Barriers to Steel Mill Provisioning of RRS Service in ERCOT ● No significant barriers in most jurisdictions ● No significant barriers within ERCOT prior to 2001 market restructuring ● Insurmountable structural barriers in ERCOT post-2001

Smith Trostle LLP Barriers (Cont’d) ● Qualification/performance requirements don’t accommodate: -Second-by-second demand fluctuation inherent in the physics of arc-furnaces -Intra-hour cyclical characteristics of steel manufacturing process ● Compensation mechanism is incapable of capturing the value provided by steel mill loads during the awarded RRS hour interval

Smith Trostle LLP Differences in Load Controllability Make Arc- Furnace Loads Well Suited for TFR Service ● Arc-furnace loads are controllable in a different but equally useful manner than loads providing RRS. At the moment an interruption is called or a UFR trips: -100% of load on-line is instantly dropped off-line as opposed to a specified number of MW -If the load is off-line the instant an interruption is required, 100% of the load remains off-line until termination of the system event ●RRS loads in ERCOT exibit a more precise load response performance band than arc-furnace loads are capable of, but arc furnace loads provide the additional benefit of mitigating load fluctuation while system frequency restoration efforts are ongoing ●Arc-furnace loads providing an additive service like TFRS complement rather than impair the 2300MW level of RRS load that ERCOT believes must be on line at all times

Smith Trostle LLP Basic of the Proposed TFRS Rule Basic Elements of the Proposed TFRS Rule ●One-Year Pilot Program ●Administered by ERCOT ●All Non-Seasonal Loads Eligible ●1000 MW Participation Cap (Avg Demand) ●One-Year Initial Contract Term ●Contract Irrevocable After 1 st Six Months ●Severe Penalties for Non-Compliance

Smith Trostle LLP Basic Elements Cont’d ●UFRs Armed 24/7 for Contract Term ●UFRs Set at Hz and HZ ●Frequency Rotated at Six Month Intervals ●Interval Loads to be Balanced ●ERCOT can Manually Trip Loads for System Emergency or Capacity Shortage ●No Limit on Number or Duration of Reliability-Related Trips ●Loads Treated as Non-Firm and Excluded from all Peak Capacity and Reserve Margin Analyses

Smith Trostle LLP Basic Elements Cont’d ●Unit Price is 75% of the higher of the Avg. Interval Clearing Price for Responsive Reserve for the Current Month or for the Corresponding Month in 2005 ●Compensation = Unit Price X Avg Demand for current Month X Hours in Month ●Cost of TFR Service to be Uplifted on a Load Ratio Share Basis ●12/1/06 Deadline for Adopting Implementing Protocols and Standard Contracts ● 1/1/07 Program Start Date ●Utility and Value of TFR Service to be Evaluated after the 1 st Year and the Program Modified Thereafter to the Extent Deemed Necessary or Appropriate

Smith Trostle LLP Why a Pilot Project? ● Loads need practical experience to determine whether their manufacturing schedules can withstand the number and duration of interruptions required ● Load participation interest needs to be assessed to determine whether a more direct market-based pricing mechanism can be implemented ● Experience is needed to determine what if any future changes to TFRS are warranted prior to full scale implementation

Smith Trostle LLP What Immediate Changes to the Draft TFRS Rule are Needed? ● Deadlines for approving Protocols and standard contracts and for initiating TFRS service need to be revised based upon the time elapsed since the initial filing ● The size of the pilot project should be reduced by at least 50% to minimize the financial impact pending an assessment of the service after the first year of operation

Smith Trostle LLP Proposal for Moving Forward With a TFRS Rulemaking ● Require Steel Mills to file by September 25th a revised Draft TFRS rule that will serve as the focus for discussion and questions at the October 2nd Workshop ●Devote a full morning or afternoon at the workshop, if necessary, to discuss and debate the merits of the proposed rule ●Solicit written comments by October 13 and reply comments by October 23rd on the revised TFRS proposal ●Solicit written comments by October 13th and reply comments by October 23rd on the revised TFRS proposal ●Request a decision by the Commissioners at the November 16 Open Meeting on whether to initiate a formal TFRS rulemaking proceeding. ●Request a decision by the Commissioners at the November 16th Open Meeting on whether to initiate a formal TFRS rulemaking proceeding.

Interruptible Load Over Time Sources: Data for is from PUCT 1996 Statewide Electrical Energy Plan for Texas, June 1996, and represents interruptible loads plus a small contribution from various load cycling programs. Data for is from Project Annual Update of Generating Electric Utility Data, Data for 2000 and 2001 came from ERCOT Capacity, Demand and Reserve (CDR). Information for is from Steve Krein, ERCOT Staff and represents the quantity of load qualified as LaaR. The amount actually providing an ancillary service and available for interruption at any given time is lower.

Tiered Frequency Response proposal  A load engaged in “price chasing” would not likely have curtailed in response to high prices when the load would have been needed to interrupt to maintain frequency in 2004.

Tiered Frequency Response proposal  With the exception of October 18 th, a load engaged in “price chasing” would not likely have curtailed in response to high prices when the load would have been needed to interrupt to maintain frequency in 2005.

Tiered Frequency Response proposal  Assumes that the maximum of 1000 MW of interruptible load signs up for TFR.

Tiered Frequency Response proposal TFR would be a relatively inexpensive source of planning reserves.