RAINGAIN Kickoff 17-18 November 2011 Work Package 4 TU Delft, Marie-claire ten Veldhuis.

Slides:



Advertisements
Similar presentations
Overview of the 2011 Work Programme Paul Griffiths Scientific committee meeting, Lisbon, November 2010.
Advertisements

ICT Work Programme NCP Infoday 23 June Maria Geronymaki DG INFSO.H.2 ICT for Government & Public Services Objective.
WP2 : Fine-scale rainfall data acquisition and prediction : Objective: develop and implement a system for estimation and forecasting of fine-scale (100m,
WP6: Delivery and evaluation of learning environment and training programme Dublin, June /05/13.
Real-time forecasting of urban pluvial flooding Angélica Anglés London, 28 th May 2010.
ADRICOSM-EXT PROJECT (ADRIatic sea integrated COastal areaS and river basin Management system pilot project - EXTension) WP2 – INTEGRATED CATCHMENT SIMULATOR.
TU Delft welcomes SPN 8!.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
Green Partnerships Local Partnerships for Greener Cities and Regions Project overview Kick-off meeting Crete, 9-10 April 2013.
Feed Assessment Tool (FEAST) Ben Lukuyu and Alan Duncan MilkIT annual planning meeting, Almora, India Nov 27 – Dec
Standa Vaněček The potential of Integrated Modelling and the OpenMI Standa Vaněček DHI, Chairman of the OATC.
WPs description « MEditerranean Development of Innovative Technologies for integrAted waTer managEment » [Kick-off meeting 7th-8th May 2004]
Grant: EP/FP202511/1 Advances in Flood Risk Management Science - Improved short term rainfall and urban flood prediction.
Flooding from Intense Rainfall. Seven Science Themes.
WP3: U RBAN PLUVIAL FLOOD MODELLING AND PREDICTION Kick-off Meeting Ecole des Ponts Paris Tech November 17 th 2011 Prof. Čedo Maksimović ICL Team: Li-Pen.
Cracow Grid Workshop November 5-6 Support System of Virtual Organization for Flood Forecasting L. Hluchy, J. Astalos, V.D. Tran, M. Dobrucky and G.T. Nguyen.
By Mohamed Al-Aawah Disaster Risk Reduction Programme UNESCO Cairo Office.
Name Speaker This work is part of the Joint Action on Improving Quality in HIV Prevention (Quality Action), which has received funding from the European.
20th-21th October CRUE 2nd Common Call Kick Off Meeting Decentralised Integrated Analysis and Enhancement of Awareness through Collaborative Modelling.
Project “Transfer of Quality Ensurance Tools for European Rural Tourism Sector” (QUALITOOL)
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Christiana Noestlinger & Bea Vuylsteke, Institute of Tropical Medicine, Belgium This work is part of the Joint Action on Improving Quality in HIV Prevention.
MESH UK Workshop 19 October 2006 Introduction Dr Paul Gilliland Marine Policy Adviser and MESH Partner Lead Natural England.
13-Oct-15EUWI-EECCA Component1 National Policy Dialogues on IWRM Stockholm, 21 August 2008.
Luxembourg January CORE ESSnet (COmmon Reference Environment) final meeting Carlo Vaccari Istat - Italy.
Europe’s network of excellence for public libraries, museums and archives at local level Rob Davies, MDR Partners, Project Manager
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative Geneva, 8 – 10 December 2009 Flood Forecasting Issues in Ghana by J. Wellens-Mensah.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
Formulating a Simulation Project Proposal Chapter3.
DIANE-CM PROJECT: Decentralised Integrated Analysis and Enhancement of Awareness through Collaborative Modelling and Management of Flood Risk Susana Ochoa.
CARPE DIEM 6 th meeting – Helsinki Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches.
Automated Flash Flood Forecasting Systems ¿Fact or Fantasy? International Workshop on Flash Flood Forecasting San Jose, Costa Rica, March 2006 Session.
City, yearpresenter - workshop / course - HarmoniQuA intro1 The project Presenter affiliation name - country.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Carpe Diem HELSINKI Meeting 23/24 June 2004 NUID CWRR Report Bruen, Parmentier.
WP4 – Policies, strategies, plans and innovative energy efficient solutions in urban transport Steering Committee Meeting Rijeka, Croatia 26/02/2015 Presented.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Kerry Powery, Chief Meteorologist, Cayman Islands National Weather Service RA-IV WIGOS Implementation Workshop (English), December,
URBAN STREAM REHABILITATION. The URBEM Framework.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
National Weather Service Hydrologic Forecasting Course Agenda 14 October – 7 November 2003.
Models Platform for Danube Forecasting PROJECT DANUBE WATER INTEGRATED MANAGEMENT.
Flood Awareness and Prevention Policy in border areas Brussels, 7 May 2007 Annelieke Laninga-Busch Project manager.
WP2: Consolidation of existing state of the art Dr. Ognjen Prnjat, GRNET.
CARPE DIEM 4 th meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
Savona, 10th April 2014 OPTIMUS Linking Smart Cities with Energy Optimisation.
WP5– HANDBOOK ON PLANNING METHODOLOGIES Paolo Michelutti JOINT ACTION HEALTH WORKFORCE WP5 Workshop, Turin – September 18 th 2014.
Energetická náročnost budov
A register on Multinational Enterprise groups
Kick-off Kavala, Greece 6-8 June 2017
Vietnam Education system overview
Felix Reiterer-Motolinia, ICCS Consultant
Prof. Čedo Maksimović, Dr. Christian Onof, Li-Pen Wang
Introduction and the role of ISPT
Burkina Faso 1) SECTOR: DRR (Flood forecast)
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
Dissemination of experimental statistics
Civil Protection Financial Instrument – Prevention Projects
Flood Forecasting as a tool for Flood Management
URBAN STREAM REHABILITATION
4th BrightnESS Best Practice Workshop VAT exposure related to ESS Installations in Sweden Carlo J. Bocchetta.
Flood Forecasting Initiative
Country requirements and relevant CSIS implementation aspects:
Master classes overview
Hans Dufourmont Eurostat Unit E4 – Structural Funds
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
Hans Dufourmont Eurostat Unit E4 – Structural Funds
T2.3 - Mechanisms for implementation, replication and upscaling
Gabriel Mannah Kpaka Deputy Director General/Head of Operations
Presentation transcript:

RAINGAIN Kickoff November 2011 Work Package 4 TU Delft, Marie-claire ten Veldhuis

RAINGAIN WP1 A1 Radar acquisition A2 Radar installation and testing WP1 A3 Appraisal of existing rainfall data Output: Radars NL, F Output: report on testing Output: presentations at pilots (Nat Obs Groups) A4 Future use and ownership of radar Output: agreement with future owner (NL)

RAINGAIN WP2 WP2 A5 Workshop rainfall data acquisition A6 Acquisition of rainfall data from radars A8 Local urban rainfall forecast A7 Workshop urban rainfall forecasting Output: methods for fine-scale rainfall measurement Output: Rainfall estimates for pilots Output: technology for fine-scale rainfall prediction for pilot locations Output: method for fine-scale rainfall prediction + action plan for integration in operational systems A9 Customise d guidelines for pilots Guidelines + training material for pilot countries

RAINGAIN WP3 WP3 A10 Linkage of local rainfall data to flood models A11 Customisation of flood models for rainfall input A13 Training material and guidelines A12 Full scale testing of pluvial flood models at pilot locations Existing urban drainage models Output: platform for automatic linkage Output: Customised flood models for pilots Output: Training material and guidelines for pilots Output: tested and implemented flood models for pilots + reports

o Implementation of fine-scale rainfall data (WP2), flood modelling and prediction (WP3) into urban water management practice o Practice = pilot locations: - Rotterdam- Leuven - Marne-la-Vallée- Seine-St.-Denis - Croydon- Redbridge RAINGAIN Work Package 4

Output: Report current stormwater and flood control pilots Output: List of flood-prone locations, flood causes and characteristics Output: Training material, manuals, guidelines for implementation Output: Customised solutions for flood-prone locations at pilots + model test results for solutions WP4 A14 State-of- the-art pilots for stormwater and flood control A15 Analysis of peak rainfall and flood events at pilot locations; weak spots A17 Training on implementation of fine-scale rainfall and flood data and forecasting A16 Development of solutions to improve pluvial flood control at pilots

RAINGAIN Work Package 4 WP4 actions through project stages o Initial stage - collect information: State-of-the-art stormwater and flood control tools, instruments and solutions in pilots  Report to intercompare state-of-the-art o Analysis stage: historical peak rainfall and flood events at pilot locations; weak spots (flood-prone), causes, reactions  List of flood-prone locations, flood causes and characteristics

RAINGAIN Work Package 4 WP4 actions through project stages o Initial stage - collect information  Report to intercompare state-of-the-art o Analysis stage: historical peak rainfall and flood events  List of flood-prone locations, flood causes and characteristics o Solutions stage: Development of solutions to improve flood control at pilots; exchange of solutions between partners  Customised solutions for pilots + model tests o Training on implementation: through workshops and Nat.Obs.Group meetings; material from WPs 2, 3 and 4  Workshops, guidelines, manuals, demos

Output: Report current stormwater and flood control pilots WP4 A14 State-of-the- art pilots for stormwater and flood control Planning: start Sep-Nov 2011 – end April 2012 Input from pilots B, F, NL, UK: Current use of rainfall data for design and operation Current stormwater drainage system characteristics Principles used for design and operational control Historical overview of flood events RAINGAIN WP4 – Action 14

Examples of input: o Design reports of urban drainage systems in pilot sites o Reports, results of hydrodynamic calculations o Analysis reports of urban drainage systems o Description of monitoring program o Description of operational control protocols o Flood event reports o Organisational aspects: responsibilities for urban drainage management RAINGAIN WP4 – Action 14