Pakistan’s Perspective on Transition from Reactive to Proactive DM System 1.

Slides:



Advertisements
Similar presentations
GP-DRR Parallel Meeting Disaster Preparedness M C. Oxley 4 th June 2007 Purpose: To stimulate substantive discussion on disaster preparedness in support.
Advertisements

SESSION 17: DISASTER RISK REDUCTION AND EDUCATION.
A Guide to Localizing the Hyogo Framework for Action
Guidance Notes on Safe Health Facilities Sanjaya Bhatia Focal Point Disaster Resilient Schools & Hospitals.
DRM Working Group FAO Rome
Global Gender and Climate Aliance CLIMATE CHANGE ADAPTATION Reducing the vulnerability to extreme events through prevention.
Claudia de Windt Senior Legal Specialist Department of Sustainable Development Strengthening Humanitarian Assistance and Prevention and Response Coordination.
1 Bishkek November 17, Goulsara Pulatova RegionalCoordinator UNISDR Secretariat Office in Central Asia 2nd Regional Consultative.
“Engaging the Community: Volunteerism and Disaster Management”
1Comprehensive Disaster Risk Management Framework The Role of Local Actors 111 Safer Cities Session 1 World Bank Institute Fouad Bendimerad, Ph.D., P.E.
Linking Disaster Risk Reduction and Climate Change Adaptation: Best practices of the Red Cross Red Crescent societies in delivering its assistance to support.
National Disaster System & Laws in Pakistan
Indicators to measure progress in DRR and HFA implementation HFA Monitoring and Review Meeting of the ISDR Asia Partnership 24 – 26 March 2010.
Mainstreaming Disaster Risk Management in Iraq
National Disaster Risk Management Program NDRMP Belgrade, March
Global Platform For Disaster Risk Reduction May 2011 Geneva, Switzerland Lebanon’s National Risk Assessment Nathalie Zaarour.
Roles of National/Global Platforms
Protection and Disaster Risk Reduction (Place) – (Date) Session 6.1: Integrating Protection into Disaster Risk Reduction.
1 September 2007 Assisting NAPA implementation: focus on early warning systems UN International Strategy for Disaster Reduction (UN/ISDR) Silvia Llosa.
United Nations Development Programme
Nepal Risk Reduction Consortium and HFA Platform.
SUMMARY OF TFEP STOCKTAKE ON EMERGENCY PREPAREDNESS CAPABILITIES AND NEEDS IN THE APEC REGION.
1 Presentation On Disaster and preparedness situation in Uganda At SILVER SPRINGS HOTEL, UGANDA 16 th -SEPTEMBER-2011 BY LAZARUS OCIRA
Inclusive Disaster Risk Management in Pakistan Farooq Masih Inclusion/DRR Advisor Hnadicap International Pakistan.
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
The Gambia: Low-Carbon high resilience infrastructure for sustainable development Ms. Fatou Ndey Gaye Minister of Forestry and the Environment,
Disaster risk reduction – How did we get here?
Sugeng Triutomo Deputy Chairman for Prevention & Preparedness National Agency for Disaster Management (BNPB) INDONESIA.
1 Hyogo Framework for Action 2005 – 2015 “Building the resilience of nations and communities to disasters” ASEAN REGIONAL FORUM The 8 th.
GHANA Developing CSA within the National Agriculture Sector Investment Plan while reinforcing inter-sectoral consistency: progress, bottlenecks and support.
Hazards and Disaster Management
Making Disaster Risk Reduction Gender Sensitive
Building Capacity for Disaster Management & Enhancing Resilience Leadership for Results Program for Mid-Level Officers in the Nepalese Civil Service Dr.
A S ITUATION A NALYSIS OF U RBAN D ISASTER R ISK M ANAGEMENT : A STUDY OF 6 CITIES IN PAKISTAN Pakistan Urban Forum 11 Jan 2014.
Cape Town: A city ready to host the 2010 FIFA World Cup™ 2010 FWC Event – Overview of City’s Disaster Risk Management Preparations 24 February 2010.
Strengthening Community Based Disaster Risk Reduction Name of you organization: UNDP Target Countries :- INDIA Cost of Action :$ 841, Stakeholders/beneficiaries:-
Pakistan Urban Forum -South Asian Cities Conference Session on “Disaster and Mass Causality Response in Urban Crisis” Emergency Response through Community.
Rehabilitation in agriculture What can we learn from recent experiences? Laurent Thomas, Director FAO Emergency Operations and Rehabilitation Division.
Margaret Barihaihi National Programme Coordinator, World Vision - ACCRA Uganda.
Click to edit Master subtitle style 6/7/12 Department of Cooperative Governance: National Disaster Management Centre PUBLIC HEARINGS: IMPLEMENTATION OF.
HFA Review INDIA By Director, DM Division Ministry of Home Affairs.
Concern Worldwide’s Approach to Disaster Risk Reduction.
HFA Progress and Updates Consultative Meeting of National Disaster Platform on Feb 17, 2013 Jishnu Subedi Institute of Engineering Tribhuvan University.
WHY DRR Minimizing impacts of disasters in health sector Maximizing readiness to respond 1$ vs 7 $
DISASTER RISK MITIGATION IN MALDIVES MAJOR WAIS WAHEED TRAINING AND COORDINATING OFFICER NDMC/MALDIVES Regional Conference: Hazards of Nature, Risks and.
Brainstorming Session on Inter-State Sharing of resources for Disaster Management.
1 HFA New Paradigm in Disaster Risk Reduction Expert Meeting on NMHss Participation in Disaster Risk Reduction Coordination Mechanisms and.
Disaster Risk Management (DRM) System and Structure in Pakistan Module 1 Session 1.3 National Disaster Management Practitioners, Islamabad, Pakistan.
Improvement of Community DRR by Proper Disaster Education & Simulation through CBDRM BY ZUHAIR AHMED KOWSHIK INSTITUTE OF DISASTER MANAGEMENT & VULNERABILITY.
FROM THE POLICY LENS “COMMUNITY BASED DISASTER MANAGEMENT” THE INDIAN EXPERIENCE NAGHMA FIRDAUS 9 TH OCTOBER 2013 WASHINGTON DC.
An Overview of Community Emergency Preparedness Planning Module 2 Session 2.1 National Disaster Management Practitioners, Islamabad, Pakistan.
IADB REGIONAL POLICY DIALOGUE June 25-26, Presented by : Ronald Jackson, Director General, ODPEM, Jamaica.
Preparation of Drought Vulnerability Assessment Study to Develop Iraq National Framework for Integrated Drought Risk Management (DRM) PAVING THE WAY FOR.
Community Based Disaster Risk Reduction in the Coastal Areas of Pakistan Presented by Fida Karim Project Officer-Coastal Disaster Risk Reduction Project.
ICTs in Disaster Risk Reduction and Disaster Response
Project Debriefing Debriefing meeting on the implementation status of two ADB- JFPR funded projects: (i) Technical Assistance Strengthening Coordination.
State Disaster Management Plan
A Presentation to the 2017 GEO Work Programme Symposium,
Recovery and Reconstruction in India: Future Directions
Sendai Framework for Disaster Risk Reduction
District Disaster Risk Reduction Managment Plan
NATIONAL POLICY FOR DISASTER PREPAREDNESS AND MANAGEMENT. UGANDA
Hazards Planning and Risk Management
Community-based disaster risk management --Empowering communities and local governments through SFs/CDD operations A presentation by Saroj Kumar Jha Program.
INVESTING IN PREPAREDNESS AND DEVELOPING INSTITUTIONAL PARTNERSHIPS FOR LONG TERM MITIGATION M. Idrees Mahsud Member DRR, NDMA.
Discussions support slides
The present scenario Disaster management-primarily responsibility of the States Central assistance to the affected State as per established norms During.
Humanitarian Architecture in Bangladesh
Discussions support slides
Disaster Risk Management – Challenges and Opportunities
Presentation transcript:

Pakistan’s Perspective on Transition from Reactive to Proactive DM System 1

Sequence Pakistan’s vulnerabilities Evolution & structure of DM system Transition from reactive disaster response to proactive disaster risk reduction & preparedness Changing focus and recent developments Issues & challenges 2

GLOF Avalanche 3

Floods Land Slides

Tsunami Earthquake 5

Drought Forest Fires

Industrial Accidents Oil Spills 7

Climate Change Impacts Inconsistent monsoon behavior Rising number of extreme climate events More Intense monsoon rains Increasing frequency of heavy downpours in short time interval Marked shift in monsoon rainfall zone from NE to NW 8

Rainfall Shift 9

From Reactive to Proactive DM System Limited policy level focus on disasters Absence of sustainable institutional arrangements to address complete spectrum of disasters Disaster management was viewed in complete isolation from the mainstream development Resource allocation for preparedness and response Only relief providing legal mechanisms were in place (Calamities Act of 1958) UNISDR in 2000 & HFA in 2005 10

Earthquake - 2005 proved a wake up call

We Realized Lacking hazard and risk assessment for informed planning Infrastructure was not hazard resistant and resilient (particularly schools and housing) Development insensitive to disaster risk reduction (DRR) Lacking in specialized search and rescue capacity Limited awareness and capacity among communities Therefore a comprehensive & proactive Disaster Management System was established through an Act of Parliament 12

Disaster Management Structure Federal Level Provincial Level PDMAs NDRF NDMC DDMAs NDMA PDMCs Stake Holders NIDM Corps of Volunteers Climate Change Division 13

Coordination Mechanism Line Ministries/ Division UN/ Donors Humanitarian Media Implementation Partners (UN) Local Representatives GHQ DMC (MO Dte) JSHQ AHQ DMC (DCAS) NHQ ERC (ACNS) Command DMC Corps DMC Command ERC BDMC Div DMC ERU Line Deptts DDMA NDMA PDMA/ FDMA SDMA/GBDMA NDMC 14

Source: NDM ACT 2010, Section 2c NDMA’s Role Prevention Mitigation Preparedness Response Recovery and Rehabilitation Reconstruction Pre Disaster Post Disaster Source: NDM ACT 2010, Section 2c 15

Reactive to Proactive system inhibited by successive disasters of Transition From Reactive to Proactive system inhibited by successive disasters of unprecedented magnitudes 16

Cyclone 2007 & 2010 Floods - 2010 17

Floods - 2011 Floods - 2012

Achievements Institutional strengthening and capacity building Hazard and vulnerability assessment Training, research & awareness Preparedness and mitigation initiatives (capacity building trainings) Contingency planning by adopting bottom up approach Community based DRM Mainstreaming DRR into development Development of international linkages 19

DRM Needs Report - 2012 DRM Needs Report, 2012 compiled with inputs from provinces and relevant stakeholders, identified needs to: Undertake extensive DRM capacity building program for PDMAs, DDMAs and relevant government organizations Capacitate district level organizations in post disaster management skills e.g. management of relief goods and supplies, camp management etc Multi hazard risk and vulnerability assessments at the district and community levels Establishment and strengthening of disaster response force Streamlining Land record, land-use planning and building codes 20

Identified Needs…… Institutionalization of DRM at the community/grassroots level Installation and strengthening of early warning systems Construction of warehouses for the storage and rapid provision of food and non food items in high risk areas The construction of critical infrastructure for risk mitigation The development of risk transfer mechanisms (insurance schemes) Others: Emergency Operation Centers, Heavy Machinery, Climate Change Studies, School Safety Programmes, DRM monitoring system, Mainstreaming DRR 21

National DRR Policy Policy approved by NDMC in February 2013 Policy shifts focus away from response centric approach towards: Prevention mitigation Preparedness 22

National Disaster Management Plan A ten years National Disaster Management Plan approved by NDMC in February 2013 with four components: National Disaster Management Plan Human Resource Development Plan National Multi-Hazard Early Warning Plan Development of CBDRM guidelines (pilot initiative in 5 districts) Plan has 10 priority areas with 118 interventions and will cost approximately US$ 1056 millions 23

Issues and Challenges Capacity constraints of DM institutions (weak DDMAs) Non availability of micro level risk assessments Retrofitting of existing infrastructure for DRR Impact of climate change phenomenon Deficient weather forecasting capabilities Inadequate early warning dissemination system Strengthening of national institute of disaster management Training and awareness of communities on DRM Resource constraints 24

Thank You 25

HFA & NDMP’s Interventions HFA 1 - DM is a national and local priority with a strong institutional base - Intervention - 1 Establish the institutional and legal system for disaster management - Intervention - 2 Prepare disaster management plans at various levels. HFA 2 - Mechanism for identification, assessment and monitoring of disaster risks - Intervention - 3 Establish national hazard and vulnerability assessment - Intervention - 4 Establish multi-hazard early warning systems. HFA 3 – Establish better knowledge of disaster risk at local and community level - Intervention - 5 Promotion of training, education and awareness in relation to disaster management; and establish a national emergency response system - Intervention - 6 Strengthen the awareness programme on disaster risk reduction at the local level

HFA & NDMP’s Interventions HFA 4 - Reduce underlying risk factors - Intervention - 7 Infrastructure development for disaster risk reduction - Intervention - 8 Mainstreaming disaster risk reduction into development HFA 5 - Enhance Preparedness, response and recovery measures in disaster management - Intervention - 9 Establish a national emergency response system - Intervention - 10 Capacity development for post-disaster recovery

NDMP (Main Volume) Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-1: Establish the Institutional and Legal System for Disaster Management 1. Establish and function disaster management organizations at national, provincial and district levels. 2.0 2. Formulate disaster management operation plans for relevant organizations. 0.2 3. Implement periodic meetings among the disaster management organizations to monitor the situations. 0.1 4. Implement drills and training of disaster management activities in the organizations to improve their capacities. -

NDMP (Main Volume) Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-2: Prepare Disaster Management Plans at Various Levels 1.Formulate and update disaster management plans at national, provincial, district and community or TMA levels 1.0 2.Develop hazard specific contingency plans 3.Develop sectoral disaster risk management operation in federal ministries, departments and authorities

NDMP (Main Volume) Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 4.3 Intervention-3: Establish national hazard and vulnerability assessment 1.Conduct detailed multi–hazard vulnerability and risk analysis/assessments at national level 14.0 2.Conduct detailed multi–hazard vulnerability and risk analysis/assessments at local level 5.0 3.Conduct research and studies on impact of climate change on glaciers and ice cap

NDMP (Main Volume) Strategy App. Cost (MN $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-7: Infrastructure Development for Disaster Risk Reduction 1. Develop schools, hospitals and other important public facilities safe against disasters 100.0 2. Protect important coastal facilities against disasters taking into account climate change 21.0 3. Enforce the building code in construction of buildings 10.0 4. Implement appropriate structural measures in flood prone areas taking into account comprehensive and integrated flood management plans 565.6 5. Enhance disaster risk management capacity in Urban areas. 11.0

NDMP (Main Volume) Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-8: Mainstreaming Disaster Risk Reduction into Development 1. Establish disaster risk reduction policies in National Development Plan and National Poverty Reduction Strategy - 2. Set up sectoral guidelines on mainstreaming disaster risk reduction 1.0 3. Establish criteria to assess development projects from a risk reduction perspective 0.2 4. Improve technical capacity of federal and provincial governments to integrate risk reduction into development plans and programs

NDMP (Main Volume) Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-9: Establish National Emergency Response System 1.Establish and strengthen warehouse or stockpiling system for storing food, medicine, relief supplies and rescue equipments at strategic locations 10.0 2.Enhance emergency response capacities, such as emergency operation centers, Civil Defence and urban search and rescue teams in major cities. 3.Establish a robust communication system and efficient transport and logistics mechanism to be used during emergency situations. 6.0 4.Develop and implement emergency response plans in relevant ministries and departments at federal, provincial and district levels 5.0 5.Establish National Disaster Management Fund to enable the federal government to organize emergency response effectively. -

TOTAL COST (NDMP) = US$ 774.1 million NDMP (Main Volume) Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-10: Capacity Development for Post Disaster Recovery 1. Prepare guidelines for post disaster recovery programs and activities 1.0 2. Develop capacity of stakeholders in post disaster recovery 3.0 3. Develop system and methodology for recovery needs assessment TOTAL COST (NDMP) = US$ 774.1 million

TOTAL COST (HRDP) = US $64.3 million HRD Plan (Volume-I) Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-5: Promotion of training, education and awareness in relation to disaster management 1. Develop NIDM (National Institute of Disaster Management) to promote human resource development in the field of disaster management. 20.7 2. Enhance the capacity of government agencies in charge of disaster management. 12.9 3. Promote mainstreaming DRR through capacity enhancement of governmental officers. 2.6 4. Develop the capacity of communities to cope with disasters. 26.2 5. Raise people's awareness of disaster management. 1.9 TOTAL COST (HRDP) = US $64.3 million

MHEWS (Volume-II) TOTAL COST (MHEWSP) = US $188.5 million Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-4: Establish Multi-hazard Early Warning and Evacuation Systems 1.Strengthen forecasting and early warning systems 168.5 2.Prepare hazard maps at local scale in targeted locations 5.7 3.Strengthen early warning dissemination systems 3.1 4.Develop capacity of early warning and evacuation systems 11.2 TOTAL COST (MHEWSP) = US $188.5 million

Instructor’s Guidelines on CBDRM (Volume-III) Strategy App. Cost (Mn $) Time Frame Phase 1 Phase 2 Phase 3 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021/ 2022 Intervention-6: Strengthen awareness program on disaster risk reduction at local level 1. Enhance knowledge on disasters management in the general public 1.0 2. Establish safe evacuation places in the case of disaster situation 10.0 3. Implement and disseminate CBDRM activities 4. Disseminate self help and mutual help efforts in disaster management 5. Establish disaster mitigation measures incorporated with existing development plan TOTAL COST (CBDRM) = US $14 million